0% found this document useful (0 votes)
371 views

Checklist For Inspection of DI Pipelines Works

This document is an inspection checklist for pipeline works at a model economic township. It records details of a DI/HDPE pipe laying project from a starting chainage to an ending chainage, including the length, diameter, and class of pipes used. It checks that the bedding and required cushion are present, the pipe is cleaned, and any special fixings or chainages are noted. It also documents the fixing details for air valves, scour valves, and sluice valves. Excavation details like depth, layer thickness, and materials used are recorded, as well as manpower/machinery details. Comments on the works can also be added.

Uploaded by

Ajay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
371 views

Checklist For Inspection of DI Pipelines Works

This document is an inspection checklist for pipeline works at a model economic township. It records details of a DI/HDPE pipe laying project from a starting chainage to an ending chainage, including the length, diameter, and class of pipes used. It checks that the bedding and required cushion are present, the pipe is cleaned, and any special fixings or chainages are noted. It also documents the fixing details for air valves, scour valves, and sluice valves. Excavation details like depth, layer thickness, and materials used are recorded, as well as manpower/machinery details. Comments on the works can also be added.

Uploaded by

Ajay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

MODEL ECONOMIC TOWNSHIP

INSPECTION CHECKLIST FOR PIPELINE WORKS


Date:

Node From – To/Location:- DI/HDPE PIPE LAYING

Chainage From:-................. Chainage To:- .............. Length:-.............................................


Dia & Class of Pipe:............................................ No. of Pipes x Length...................................
Bedding Yes No
Required Cushion Yes No

Cleaning of pipe Yes No

Special Fixing & Chainage: ........................................................................................................

Air valve/Scour valve/Sluice valve Fixing details (Ch.).....................................................................................

Backfilling as per specification Yes No

Excavation Details:-

Chainage Width Total Layer Thickness Detail Remarks


Depth CC BT WBM SR HR E/W PB any other
From To
Layer No.

(All measurement in Meter)

Manpower/Labour details Machinery / Equipment details


Name of PRW agency
Supervisor Skilled Unskilled Excavator Crane Tractor Trolley Other

Comments, if any:
.................................................................................................................................................................................................
.................................................................................................................................................................................................
.................................................................................................................................................................................................

CONTRACTOR CONSULTANT METL


Name & Signature Name & Signature Name & Signature

You might also like