1-SEM-9-ARCH. DESIGN-Assignment PDF
1-SEM-9-ARCH. DESIGN-Assignment PDF
SEMESTER IX
2020-21
ASSIGNMENT-
Redesigning of Bus Terminal cum Commercial Complex at Vashi, Navi Mumbai
FACULTY
Prof. Sanjiv Dongre Prof. Dilip Digarse Prof. Archana Agarwal Prof. Sampada Gethe Prof. Narendra
Prof. Vishwas Gupta Prof. Sameer Salvi Prof. Vinay Surve Prof. Smita Gupta
INTRODUCTION
To overcome the present traffic scenario in our region, public transport needs to be encouraged. The
infrastructure related to public transport would also undergo a lot of unforseen changes. With this overview,
NMMC has proposed to redesign the Vashi Bus Terminal.
NMMC expects this Terminal building design to be a futuristic modern complex, which is efficient, functional,
energy efficient, sustainable, healthy, safe and shall become an iconic building for tomorrow.
The plot area is 10,925 sqm, the total permissiable built-up area is 16,388 (FSI of 1.5). 25 % of this area shall be
used for the use of Bus terminal and 75 % of this shall be developed for commercial activities.
Vashi Bus terminal is one of the busiest bus terminal in Navi Mumbai. Passengers board busses for Mumbai,
Thane, Kalyan, Dombivli and a few places of Raigad district including places in Navi Mumbai.
AIM
The proposed design solution should remove the existing issues faced by the bus travellers, in terms of
transport, waiting, facilities, etc. The design shall also look into the issues faced by commercial users. It shall also
forsee and solve the problems that arise due to its mix use development.
OBJECTIVES
1 Respond to the diverse users and their expectations.
2 Respond to the environmental concerns.
3 Respond to the socio economic factors.
4 Respond to transportation and traffic patterns
5 Integration of technical knowledge to design
SITE
Bus Depot, Sector- 9A, Shivaji Chowk, Vashi, Navi Mumbai, Maharashtra, India
FINAL DRAWING REQUIREMENTS / DELIVERABLES
* Program & Site Analysis A3 Sheet
* Design Concept A3 Sheet
* Site Plan and Site Sections A3 Sheet 1:500
* All Floor Plans A3 Sheet 1:250
* Necessary Sections (to explain the scheme), All Elevations A3 Sheet 1:250
* External Views and Internal views (to explain the scheme) A3 Sheet 1:250
* Block Model A3 Base
ASSESMENT SCHEDULE
S. N DATE MARKS
1 Introduc on to Assignment 11-May-20
2 Literature Study, Case studies - Group Presentation 25-May-20 10
3 Program and Requirement finalisation 08-Jun-20 10
4 Site Analysis and Zoning on Site 29-Jun-20 10
5 CROSS JURY 20-Jul-20 10
Conceptual Design on Site.
Spatial relationships with scale and form.
6 Schematic Design + Conceptual Design - Finalisation 27-Jul-20 10
Note: The above schedule is only for Online learning module, the further module shall be given in due course
depending on the University / Government directives and lock COVID 19 pandemic situation.
ARCHITECTURAL DESIGN
SEMESTER - IX
2020-21
ASSIGNMENT - TOPIC
Redesigning of Bus Terminal cum Commercial Complex at Vashi, Navi Mumbai
PROGRAM
Plot area 10,925 sqm
Permissible Built-up Area 16,388 sqm
Sr. No. Requirements Area Nos
A BUS TERMINAL 25 % of AREA
1 ADMIN.
Waiting area 25 persons
Facilities for Drivers & Conductors (Male & Females)- 20 persons
(Wash rooms, Changing rooms, Rest areas, etc.)
Admin Office-Terminal Manager, clerks 6 persons
Account Office-Accountant, Cashier, Clerks 4 persons
Store & record room 150 sqm
Control room with latest connectivity facilities 50 sqm
2 PASSENGER CONCOURSE
Information & Enquiry office - Help Desk for Passengers & Public address 25 sqm
system / counter
Food Court / Stalls / shops- seating for 10 per. 8 nos.
PCO/ATM/ any other public service 4 nos.
C PARKING
Parking for 4- wheeler @ 1 no for 100 Sq. Mts of Built Up Area
Parking for 2-wheelers @ 10% of 4- wheelers
ANY OTHER AREA - which the students think necessary may be added
Ancillary Requirements:
1 Nos of bus routes = 5
2 Nos of bus stops per route = 2
3 Total nos of bus stops = 10
4 Idle parking for buses = 10
By-Law limitations
1 Front open spaces (towards roadside edges) = 6.0m from site boundary
2 Side/ rear open spaces (towards non roadside edges of site) = h/5 (where h = height of building)
3 Total height permissible = no restrictions
4 Multiple basements or podiums permissible for Parking
5 Horizontal travel distance between stairs = 30 meters without sprinkler system. With sprinkler system it
can be up to 45 meters.
ARCHITECTURAL DESIGN
SEMESTER IX
2020-21
ASSIGNMENT
Redesigning of Bus Depot with Commercial Complex at Vashi, Navi Mumbai
SITE DETAILS
Sector 9A, Vashi Bus Depot, Navi Mumbai, Maharashtra, India
GOOGLE EARTH IMAGE
11
33
22
LEGEND
1 Proposed Site- at Shivaji Chowk
2 Vashi Railway Station
3 Junction of Thane Belapur & Mumbai Panvel
Highway