The project manager at LBDC Consultants is being notified that work on the Reli Minor canal was stopped by local farmers armed with weapons who are demanding construction of a cattle enclosure between RD31 and RD32. Completing this work during the current closure period is important to avoid problems when operating the minor. Police protection and supervision by LBDC staff are being requested to allow work to resume within 24 hours and be completed without further disruption, otherwise responsibilities cannot be guaranteed if issues arise later.

Uploaded by

Arshad Mahmood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views2 pages

Sample Letter-Stoppage of Work-To Engr

The project manager at LBDC Consultants is being notified that work on the Reli Minor canal was stopped by local farmers armed with weapons who are demanding construction of a cattle enclosure between RD31 and RD32. Completing this work during the current closure period is important to avoid problems when operating the minor. Police protection and supervision by LBDC staff are being requested to allow work to resume within 24 hours and be completed without further disruption, otherwise responsibilities cannot be guaranteed if issues arise later.

Uploaded by

Arshad Mahmood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Ref. No.

SHCL/LBDC06B/2014-180 Date: Jun5, 2014

Project Manager
LBDC Consultants
14-P/1, Model Town Extension, Lahore
Phone: 042-35164274
Fax: 042-35161530
E-mail: [email protected]

Subject: Contract No.:LBDC/ICB-06-B: Rehabilitation & Upgrading of Branch


Canals and Distributary Systems Covering Khanewal Division (Part B)
Stoppage of Work at RD31+32 of Reli Minor
Dear Sir,

It is submitted with concern that earthwork activity for making prism was completed
from RD31to RD32 of Reli Minor while a crew of local farmers headed by Mr.Asmat-ullah
Niazi who were loaded with arms, threatened our work force/senior staff and forcefully
stopped the work today (i.e. 20-01-2015) at 1100 hours at the said location in the presence of
your Resident Engineer and our Site Manager. They are demanding for the construction of a
cattle goat in between the subject RDs and have also smashed the prism with their own tools
like kassies, Belchas etc., at that specific location.
Please note that if we don’t construct this portion right now during the running closure
period, it will not be possible for us to construct this reach later on. Thus, we will not be held
responsible, if it creates any problem while the minor is put into operation.

It is also apprised that due to this unpleasant happening at Site, our execution of the Works is
likely to be delayed or disrupted unless a clear cut decision in this regard is taken
immediately. Such delay or disruption will incur additional consequential costs under the
ambit of the Contract.
In view of the foregoing scenario, it is requested to please manage a crew of police guards
through Employer and also ensure the presence of your senior staff at that particular site
within twenty-four hours so that the Works could be completed in the running closure period
without further interruption of the local farmers; otherwise we will not be able to construct
this reach latter on and will not take any responsibility in this regard due to any fault/problem
in this portion while putting this minor in operation.

An early action is requested please

Yours Faithfully,
For Sinohydro Corporation Ltd

Address: House No.60, Street 1,Block-U, DHA Phase 2, Lahore E-mail :sinopk6b@ gmail.com
Tel: 042-35742429, Fax: 042-35742428 Page
1 of 1
(GeLingbo)
Deputy Project Manager

Enclosed: As above
Copy to:
1. Project Director, PMU for LBDCIP
2. Chief Resident Engineer, LBDC Consultants
3. Resident Engineer ICB-06B
4. Office file

Address: House No.60, Street 1,Block-U, DHA Phase 2, Lahore E-mail :sinopk6b@ gmail.com
Tel: 042-35742429, Fax: 042-35742428 Page