This document provides a job risk assessment for post-weld heat treatment work at a 2x30MW coal-fired power plant project in Tanjung Tabalong, Indonesia. It identifies the tasks assessed, which include heating work and post-weld heat treatment. It notes that interface with other field operations needs to be reviewed during work permit submission. Mandatory rules from PT. PLI are listed, including requirements for equipment certification, PPE, safety briefings, permitting competent personnel, and applying for work permits. Signatures from the RCM, QA/QC Manager, HSE Coordinator, and QA/QC Supervisor are provided to approve the assessment.

Uploaded by

Alam Doo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views1 page

Front Page R - A - JRA For General Work Activity Rev. A

This document provides a job risk assessment for post-weld heat treatment work at a 2x30MW coal-fired power plant project in Tanjung Tabalong, Indonesia. It identifies the tasks assessed, which include heating work and post-weld heat treatment. It notes that interface with other field operations needs to be reviewed during work permit submission. Mandatory rules from PT. PLI are listed, including requirements for equipment certification, PPE, safety briefings, permitting competent personnel, and applying for work permits. Signatures from the RCM, QA/QC Manager, HSE Coordinator, and QA/QC Supervisor are provided to approve the assessment.

Uploaded by

Alam Doo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

TANJUNG TABALONG 2X30MW COAL FIRED

POWER PLANT PROJECT


PT. PUNJ LLOYD INDONESIA
PT. MAKMUR SEJAHTERA WISESA
JOB RISK ASSESSMENT – FRONT SHEET
th
Date: 17 Sep’12 Job: Post Weld Heat Treatment No. of sheet Revision: Status:
1 of 2 0A IFA

Rev Date: 10th Dec ‘12

Installation/Site: Power Plant Ref No: PLI-EDP-JRA-CFPPP-Add-04 Discipline: HSSE


Project Site
Overall Risk Assessed Acceptable/Unacceptable Re-Assessment Yes/No
required? LMRA
Notes:
Task assessed as follows:
1. Heating Work / pekerjaan
pemanasan bahan
- Post Weld Heat Treatment /
pemanasan material terpusat

Tasks not assessed in this JRA


 Interface with other field operations activities to be reviewed during work permit submission
 Berkaitan dengan aktivitas pihak lain dilapangan yang harus diperiksa pada saat pengajuan izin kerja

PT. PLI Mandatory Rules


 New equipment must have valid certifications issued and approved
 Peralatan yang baru harus memiliki sertifikat yang masih berlaku dan syah
 Mandatory PPE should be used as per HSE Plan TT-PLL-HSE-001 Rev. B
 Alat pelindung diri yang wajib harus dipakai berdasarkan HSE Plan TT-PLL-HSE-001 Rev. B
 Safety briefing/tool box meeting and last minutes risk assessment to conducted prior to start of activity
 Pengarahan keselamatan/rapat keselamatan dan penilaian resiko terakhir harus dilakukan sebelum memulai
kegiatan
 Only competent personnel to be deployed in the activity
 Hanya orang yang berkompeten yang harus melakukan kegiatan tersebut
 Work permit shall be applied before starting activity as per PLI.OCP 04.06 C
 Ijin kerja harus dikeluarkan sebelum memulai pekerjaan.

PT. PUNJ LLOYD INDONESIA


PRINT NAME DESIGNATION SIGNATURE DATE
VT. Muruguan RCM 10th Dec’12
Henry Amalraj QA / QC Manager 10th Dec’12
Ikroman HSE Coordinator 10th Dec’12
Bukhari QA/QC Supervisor 10th Dec’12