The document contains a list of queries related to site investigation for a solar power plant project. It includes requests for information on topography, geotechnical investigation, hydrological study, applicable codes and standards, module and tracker details, cost parameters, roads, buildings, fencing, site access gates, and other miscellaneous project details. Specifically, it seeks contour data, soil properties, flood risk assessment, wind and seismic loads, module pressure ratings, construction cost factors, road dimensions, building requirements, fence and gate specifications, and approval authorities.

Uploaded by

rames
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views9 pages

Query Prebid

The document contains a list of queries related to site investigation for a solar power plant project. It includes requests for information on topography, geotechnical investigation, hydrological study, applicable codes and standards, module and tracker details, cost parameters, roads, buildings, fencing, site access gates, and other miscellaneous project details. Specifically, it seeks contour data, soil properties, flood risk assessment, wind and seismic loads, module pressure ratings, construction cost factors, road dimensions, building requirements, fence and gate specifications, and approval authorities.

Uploaded by

rames
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Queries:

Sno. Query
1 Topographical information with Spot level and Boundary
Spot levels
Boundary defined
Location on Google Map
PV Laydown Area
Fencing Area
Checking the co-ordinate system on Civil 3D with Google map superimposition
Site Report by SW available
2 Geotechnical Investigation:
Type of soil
C-Phi Value
Bore Log info (depth of Bore hole)
Soil chemical composition with PH value, Chloride, sulphates
Thermal/ Electrical Resistivity
Corrosion recommendation
CBR Value
Erosion / Sedimentation measure if any
Shrinkage and Swell of soil if any
Pull Out test report if any
Seismic parameter for design of foundation
Water Table level
Fluctuation of Water Table
Termite proctection if any
Sink Hole observed, possibility of sink/ Pin Holes

3 Hydrological Study for Plant:


Flood Assesment Report for the plant for return period 1 in 100 years
Rain Fall intensity for drainage / Return Period of rainfall intensity (1 hour
rainfall for once in 10 years reoccurance)
Lawful exit Point of Rain water / Ground elevation
Max depth of water in existing Creek/River for 1 in 50/100 years
Amount of Water passing through the plant from upstream side
4 Corrosion Report for design period of 25 years
Distance from Sea/ Major polluting industry creating air pollution
5 Applicable Code
Wind load
Seismic Zone
Structural Design Code

Module panel max pressure with bottom connection.


6
Module fixing with Structure/Tracker (Clamp vs Bolt)
Dynamic Analysis of Tracker required as per RFP
Slope allowed for Tracker
Undulation allowed for Tracker
Length of Tracker
Length of Torque tube
GA of Tracker with Foundation load
7 Cost Parameter
Cost of Ramming/Pre-drill/ Concrete
Cost of Earthwork (cutting/Filling)
Cost of cutting Rock
8 Type of Building
Is there any Existing Structure at site
9 Roads:
Type of Access Road/ Internal Road
Access Road Width
Length of Access Road
Internal Road width
Crown of Road to be minimum 150mm above NGL (Y/N)
Drainage along the Road (one side/ both side)
Space keep for road + Drain+ Electrical Cable + Turning Radius
Offset from Overhead line, reserved area, fence etc.
1 Approving Authority
2 Land available to put Embankment if required
3 Grade of Steel available locally for Rebar/ Structural Steel
Type of Brick (Block or Brick) and size
4 Type of Fence locally followed at site to optimise the cost
Waste water Network
Building MCR Building size requried as per RFQ
Building Warehouse size required as per Electrical / RFQ
Building Store Room required
Building Size of Gate house required
Building O&M Building size required as per RFQ
Response Remark

uperimposition

vestigation:

dy for Plant:
s:
Store Room required
Size of Gate house or security room requ
O&M Building size required as per RFQ
Fencing
Type of Fence locally followed at site to o
height of fence to be considered
pile type (ramming or concreting)
mesh size
barbed wire spacing
barbed wire height
barbed wire angle
helical wire required or not
space below fence fabric to be considered
animal escape provision
pole type
fence design code to be followed
min pole spacing
warning signs to be provided or not
if yes., then specify:
Site Access Gate
Main Door Width
Cricket Gate Provision
Cricket Gate Width
Pile type (ramming or concreting)
Pole Type
Galavanziation & Painting Requirements
Type of Gate (normal/motor driven/roller
warning signs to be provided or not
if yes., then specify:
Topography Info.
Topographical information with Spot level and Boundary
PDF
Autocadd file (.dwg)
Contour File Information
Spot levels
Boundary defined
Location on Google Map
PV Laydown Area
Fencing Area
Co-Ordinate system information
Civil 3D file with Google map superimposition
Site Report by SWSL available
Pictures in Site Report by SWSL
Distance from Sea/ Major polluting industry creating air pollution
Geotechnical Investigation:
Type of soil
C Value
Ø value (degrees)
Bore Log info (depth of Bore hole)
Soil chemical composition with PH value, Chloride, sulphates
Thermal/ Electrical Resistivity
Corrosion Report for design period of 25 years
Corrosion recommendation
CBR Value
Erosion / Sedimentation measure if any
Shrinkage and Swell of soil if any
Pull Out test report if any
Seismic parameter for design of foundation
Water Table level
Fluctuation of Water Table
Termite proctection if any
Sink Hole observed, possibility of sink/ Pin Holes
N value
density information
Hydrological Study for Plant:
Flood Assesment Report for the plant for return period 1 in 100 years
Rain Fall intensity for drainage / Return Period of rainfall intensity (1 hour
rainfall for once in 10 years reoccurance)
Rain Fall intensity for Culverts / Return Period of rainfall intensity (1 hour
rainfall for once in 25 years reoccurance)
Lawful entry Point of Rain water / Ground elevation
Lawful exit Point of Rain water / Ground elevation
Max depth of water in existing Creek/River for 1 in 50 years
Max depth of water in existing Creek/River for 1 in 100 years
Amount of Water passing through the plant from upstream side
rainfall intensity in mm/hr
Civil works for water/stormwater & waste water management
retention pond recommendations
Sedimantation tank recommendations
RO Requirement
Total Water Requirement
Wind Load
Applicable Code
design Wind load speed (m/s)
design wind zone
Seismic load
Seismic Zone
Structural Design Code
Module panel max pressure with bottom connection.
Module fixing with Structure/Tracker (Clamp vs Bolt)
Dynamic Analysis of Tracker required as per RFP
Tracker Information
Length of Tracker
Length of Torque tube
GA of Tracker with Foundation load** (to be provided by electrical)
Costing Information
Cost Parameter
Cost of Ramming/Pre-drill/ Concrete
Cost of Earthwork (cutting/Filling)
Cost of cutting Rock
Roads
Width of Access Road
Length of Access Road
Type of Access Road
Scope of access road
Width of internal Road
Length of internal Road
Type of internal Road
Type of periphery Road
Width of periphery Road
Length of periphery Road
Shoulder recommendations
Crown of Road to be minimum 150mm above NGL (Y/N)
Drainage along the Road (one side/ both side)
Space keep for road + Drain+ Electrical Cable + Turning Radius
Offset from Overhead line, reserved area, fence etc.
Approving Authority
Land available to put Embankment if required
Grade of Steel available locally for Rebar/ Structural Steel
Buildings Info.
Type of Buildings
Type of Brick (Block or Brick) and size
Existing Structures/Buildings at site
MCR Building size requried as per RFQ
Warehouse size required as per Electrical / RFQ
Store Room required
Size of Gate house or security room required
O&M Building size required as per RFQ
Fencing
Type of Fence locally followed at site to optimise the cost
height of fence to be considered
pile type (ramming or concreting)
mesh size
barbed wire spacing
barbed wire height
barbed wire angle
helical wire required or not
space below fence fabric to be considered or not (storm-water passage)
animal escape provision
pole type
fence design code to be followed
min pole spacing
warning signs to be provided or not
if yes., then specify:
Site Access Gate
Main Door Width
Cricket Gate Provision
Cricket Gate Width
Pile type (ramming or concreting)
Pole Type
Galavanziation & Painting Requirements
Type of Gate (normal/motor driven/roller gate/swing gate/electrical)
warning signs to be provided or not
if yes., then specify: