HDPE Visual Inspection02

The document describes the results of two visual inspections of HDPE welding of manholes and pipes. The inspections found defects in specific manholes and pipes between different manhole locations. Notes are provided on needed re-welding, repairs to manhole ladders and slabs, and cleaning of manholes. A follow up inspection is required to ensure the defects identified were addressed.

Uploaded by

hatem tahoon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
122 views

HDPE Visual Inspection02

The document describes the results of two visual inspections of HDPE welding of manholes and pipes. The inspections found defects in specific manholes and pipes between different manhole locations. Notes are provided on needed re-welding, repairs to manhole ladders and slabs, and cleaning of manholes. A follow up inspection is required to ensure the defects identified were addressed.

Uploaded by

hatem tahoon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Visual Inspection NO.

1 for HDPE Welding (Manholes & Pipes ) - Contract3


Manholes # Pipes NO.
From To 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
21 22 x x x x
22 23
23 24 x x x x
24 25 x x x
25 26 x x x
26 27
27 28 x x x x x x
28 29 x x x x x x x x x
29 30 x x x x x x x x x
30 31
31 32 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
32 33 x x x
33 34 x x
34 35 x x x x x x x x x
35 36 x x x x x x x x x x x
36 37 x x x x x x x x x x x x x x x x x x x x x x
37 38 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
38 39 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
39 40 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
40 41 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
41 42 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
42 43 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
43 44 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
44 45 x x x x x x x x x x x x x x x x x x x
45 46 x x x x x x x x x x x x x x x x x x x x x x x x x
46 47 x x x x x x x x x x x x x
47 48 x x
48 49 x x x x x x x x x x x x x
49 50 x x x x x x x x
50 51 x x x
51 52 x x
52 53 x x
53 54
54 55
55 56
56 57
57 58
58 59
59 60
60 61
61 62
62 63
63 64
64 I.C

x = Defected Pipes
Notes :-
Inspection Sheet only from Manholes 21 to Manholes 53.
Distance from CPS to MH21 were inspected with notes written in the Inspection Request and mentioned inside the pipe lines with spray
Distance from MH53 to Interception Chamber to be ispected later as it new welding (14Dec2019)
Re welding of ledders of MH3 and where it is needed. To checked later.
Removing Nails and rewelding on it`s place
Adding Ledders for for MH15 , MH16 , MH21 and where is needed . To be check Later
Refix and re-install slab of 3.10m for MH 32, MH33,MH34
Cleaning and removing all undesired materials (Water- Mud- Wood- Concrete Stones)
Notes for manholes related to refix som parts as it mentioned insides each manholes with spray and to be inspected again
This inspection to be followed with another inspection for the remainig parts and to assure that the mentioned defected pipesand manholes were fixed
Visual Inspection NO.2 for HDPE Welding (Manholes & Pipes
Manholes # Pipes NO.
From To 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
CPS(Inlet) 1
1 2
2 3
3 4
4 4*
4* 5
5 6 x x x x x x x x x x x x x x x x x x x x

6 7
7 8 x x
8 9 x
9 10 x
10 11 x x x
11 12
12 14 x
14 15 x
15 16 x x
16 17
17 18
18 19
19 20
20 21 x
21 22
22 23
23 24 x x
24 25 x
25 26 x
26 27 x x
27 28
28 29
29 30 x
30 31 x
31 32 x x x x x x x x x x x
32 33
33 34 x
34 35
35 36
36 37 x
37 38 x x
38 39 x
39 40 x x
40 41
41 42
42 43 x x x x x x
43 44 x x x
44 45 x x x x x
45 46
46 47 x
47 48 x x x
48 49
49 50 x
50 51 x
51 52
52 53
53 54
54 55
55 56
56 57
57 58
58 59
59 60
60 61
61 62
62 63
63 63*
63* 63**
63** 63***
63*** 64
64 I.C
X /Defect pipes
Notes :-
Re welding of ledders of MH3 and where it is needed. To checked later.
Removing Nails and rewelding on it`s place
Adding Ledders for for MH15 , MH16 , MH21 and where is needed . To be check Later
Refix and re-install slab of 3.10m for MH 32, MH33,MH34
Cleaning and removing all undesired materials (Water- Mud- Wood- Concrete Stones)
Notes for manholes related to refix some parts as it mentioned insides each manholes with spray and to be inspected again
This inspection to be followed with another inspection for the remainig parts and to assure that the mentioned defected pip
RE welding of hdpe for over flow lines
Change ledders for manholes 46
Welding (Manholes & Pipes ) - Contract3
Pipes NO.
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

x x x x x x x x x x x x x x x x x x x x

x x

x
x x
x
x

x
x x

X x
x x x x x x x
x x

and to be inspected again


he mentioned defected pipesand manholes were fixed
Notes

Box Culvert / Check all


Corners/steel wires place
re check

re check

You might also like