100% found this document useful (5 votes)
6K views28 pages

Inspection and Test Plan - Mechanical Works (Qcitp) : Document Review

This document outlines the inspection and test plan for mechanical works on a project. It lists 14 inspection points covering document review, material receiving, installation, and final inspection. For each point, it identifies the activity to be checked, reference documents, acceptance criteria, and parties responsible for verification including the subcontractor, contractor, and third parties. The goal is to ensure all mechanical system materials and installation meet design requirements and applicable codes and standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (5 votes)
6K views28 pages

Inspection and Test Plan - Mechanical Works (Qcitp) : Document Review

This document outlines the inspection and test plan for mechanical works on a project. It lists 14 inspection points covering document review, material receiving, installation, and final inspection. For each point, it identifies the activity to be checked, reference documents, acceptance criteria, and parties responsible for verification including the subcontractor, contractor, and third parties. The goal is to ensure all mechanical system materials and installation meet design requirements and applicable codes and standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 28

INSPECTION AND TEST PLAN - MECHANICAL WORKS (QCITP)

Inspection Points(HOLD POINTS)

Activity and Characteristic to be Reference Documents (Codes/ Std/ Independe


No. Acceptance Criteria Verifying Document
Checked Spec. / Proc.) nt
Subcon CONTR.  RE / RTO SCC Laborator
y (3rd
Party)

1 DOCUMENT REVIEW

Review technical submittal related to General Specification for Mechanical Mateial and Manufacturer Materials Inspection
1.1 R R R R H
Condensate pipes & fittings System. Technical submittal Report

2 MATERIAL RECEIVING

General Specification for Mechanical


2.1 Condensate pipe & fittings Material Submittal Approve Material Request H S W W R
System.

Equipement/Material Receiving
inspection for HVAC equipement, duct ASRAE Standard 90.1, Materials Inspection
and accessories, hanger/supports, Design dwg., Manufacturer Instruction Material Submittal Report with Approve
2.2 Insullation, air terminal devices, and General Specification for Approval and Relevant Materials R R R R H
Flexible Connection, volume/fire Mechanical System. applicable Industrial Documents/Certificate/Su
dampers, Electrical Instrument Codes and standard bmittal
materials.
Storage, handling & Preservation General Specification for Mechanical Mechanical Consultancy Approve Material Storage
2.3 Above material/Equipement for HVAC System and Manufacturer Instruction/Recommendat area and Handling R R R S H
System Recommendation. ion Methodology

3 INSTALLATION

General Specification Notes for For Construction Dwg.,


3.1 Condensate pipe layouts Mechanical works and conforming Mechanical consultancy Inspection Report H R S W
ASHRAE standards. approval
General Specification Notes for For Construction Dwg.,
3.2 Condensate pipe Installation Mechanical works and conforming Mechanical consultancy Inspection Report H R S W
ASHRAE standards. approval
General Specification Notes for For Construction Dwg.,
3.3 Identification tags Installation Mechanical works and conforming Mechanical consultancy Inspection Report H R S W
ASHRAE standards. approval
General Specification Notes for For Construction Dwg.,
Condensate pipe connection Material and Inspection
3.4 Mechanical works and conforming Mechanical consultancy I R S S
equipement Report
ASHRAE standards. approval

Duct Material conforming to General Specification Notes, Mechanical Consultancy Material Inspection
3.5 R R S S
specification ANSI/SMACNA 006-2006 material approval Report

General Specifications Notes for Mechanical Consultancy


3.6 Duct layout and Elevation Inspection Report I/H R S S
Mechanical works instruction.

General Specifications Notes for Mechanical Consultancy


3.7 Duct Installation Inspection Report I/H R S S
Mechanical works instruction.

Hangers and Support Installation


General Specifications Notes for Mechanical Consultancy
3.8 spacing, ducting route & Inspection Report I/H R S S
Mechanical works instruction.
reinforcement.
Inspection Report and
Check joints and Application of duct General Specifications Notes for Mechanical Consultancy
3.9 Material Approval for duct I/H R S S
Sealant Mechanical works instruction.
sealant

Visual check of connection tightness. General Specifications Notes for


4 As per FCD Inspection Report I/H R S S
Gaskets and seals. Mechanical works

Visual inspection of duct and its General Specifications Notes for


4.1 As per FCD Inspection Report R R S S
accessories conforming to the project. Mechanical works

Check accessories and duct free from General Specifications Notes for
4.2 As per FCD Inspection Report I/H R S S
damage Mechanical works

Duct installation material are


General Specifications Notes for Material Inspection
4.3 conforming to the project As per FCD R R S S
Mechanical works Report
specifications
Duct insulation installation as per
General Specifications Notes for
4.4 drawing, check the insulation band As per FCD Inspection Report I/H R S S
Mechanical works
spacing as per FCD

5 Testing

General Specifications Notes for


Test Report and Approve
5.1 Flow test Mechanical works comforming Mechanical Consultancy I R R W H
method statement
ANSI/ASHRAE 1-1988 Approval
General Specifications Notes for Test Report and Approve
5.2 Smoke test Mechanical Consultancy I R R W H
Mechanical works method statement
Approval
LEGEND:        ITL: Independent Testing Laboratory   I: Execution of Inspection and Test      R: Review    S: Surveillance     W : Witness    H : Hold Point

RE/RTO: Resident Enginner/Residing Technical Officer SCC: Standard Committee of Construction

Prepared by: Noted by: Approved by:


Mr. Jomari Chris Beron Engr. Bernard Unabia Engr. Ariel Cantil
PDPM-QC Mechanical Engineer PDPM-QC Civil Engineer PDPM-PM
INSPECTION TEST PLAN FOR HOUSING P
Reference Documents
No. Activity and Characteristic to be Checked (Codes/ Std/ Spec. /
Proc.)

1 Material Receiving Inspection

- Receiving Inspection of Materials SUT1-Z05-Q 00-4-023/ASTM E1492


1.1

- Confirm material storage condition Site Receiving InspectiinProcedure

SUT1-Z05-Q 00-4-023-
1.2 Receipt inspection of welding consumables

Site Receiving Inspection
Procedure

2 Welding/ Welders Qualifications

SUT1-Z05-Q00-4-005 WPS(AWS
2.1 Confirmed Welding Procedure Specification
D1.1 Prequalified)
SUT1-Z05-Q00-4-005 WPS(AWS
2.1 Confirmed Welding Procedure Specification
D1.1 Prequalified)

SUT1-Z05-Q00-4-030  Welder &
Welding
Operator qualificationProcedure
2.2 Cofirmed Welders(Welders Qualification Test & Contro)

SUT1-Z05-Q00-4-021 General
Welding Procedure

3 Foundation Preparation

Approved Construction 
3.1 Confirmation acceptance of foundation

Drawing - (IFC)
Approved Construction 
3.2 Control foundation level pad elevation & location Drawing - (IFC)

4 Inspection of Fabricated Items

4.1 Confirm Dimension Verification,(Before Erection) SUTO-ALL-C08-4-004

4.2 Visual inspection of workmanship including weld quality SUTO-ALL-C08-4-004

5 Steel Works Erection


5.1 Confirm column plumbness SUTO-ALL-C08-4-004

5.2 Confirm bracings are properly insta SUT0-All-C08-4-004lled SUTO-ALL-C08-4-004

5.3 Confirm handrails, gratings, & stairways are correctly installed SUTO-ALL-C08-4-004

6 Bolting

6.1 Confirm all nuts, bolts & washers have been fitted. SUTO-ALL-C08-4-004

Confirm erection bolts have been replaced with high strength


6.2 SUTO-ALL-C08-4-004
bolts(where applicable)

6.3 Confirm bolt torque SUTO-ALL-C08-4-004

7 Field Welding (As per Drawing- Field Points)

Confirm welding works is carried out in SUT1-Z05-Q00-4-


7.1
 accordance with approved procedures 006 WPS & PQR procedure
SUT1-Z05-Q00-4-006  -WPS & PQR
7.2 Visual Inspection of welding
Pprocedure

SUT1-Z05-Q00-4-006 -WPS & PQR
Non Destructive Testing (NDT) of welding works
7.3 Procedure

   (As per 11.0 NDE) SUT0-All-C08-4-004

8 Grouting

Approved Construction Drawing –


8.1 Confirm grouting is complete
Issued for Construction (IFC)

Approved Construction Drawing –


8.2 Confirm final anchor bolt torque after grouting
Issued for Construction (IFC)

9 Final Inspection

9.1 Carry out Final inspection of the structure Approved Construction Drawings

10 Repair/ Adjustment  & Re-fabrication


Confirmed material Site Receiving Procedure (SUT1-
10.1
Z05-Q 00-4-023)

- Receiving Inspection of Materials

SUT1-Z05-Q00-4-005 WPS(AWS
10.2 Marking & Cutting
D1.1 Prequalified)

SUT1-Z05-Q00-4-005 WPS (AWS


10.3 Fit up Check
D1.1 Prequalified)

10.4 Confirm Final Dimension Check SUTO-ALL-C08-4-004

Welding Visual Inspection SUT1-Z05-Q00-4-005(WPS)


- Full Penetration welds 100% (AWS D1.1 Prequalified)
10.5
- Partial penetration welds 50%
- Fillet welds 25%

11 NDE
RT or  UT - Full penetration Butt Welds  50 % and Magnetic(MT) or Dye
penetrant testing (PT) 50%  (for site welds the above will be 100%)

11.1 UT  or M/ PT - Partial penetration Butt Welds Min.25% & MT/PT  25% (for SUTO-ALL-C08-4-004
site welds the above will be 50%)

MT  or PT - Fillet Welds  Min 20% (for site welds the above will be 50%)

Re-Painting/ Galvanizing  (Touch up - Cold )


11.2 - Surface preparation Approved MS for Painting Works
- Thickness of Zinc Coating/ Painting Cointing Dry film
SUTO-ALL-C08-4-004
11.3 Adhesion Test(If necessary –Random sample Test)
SUTO-ALL-P08-4-008

LEGEND:        ITL: Independent Testing Laboratory   I: Execution of Inspection and Test      R: Review    S: Surveillance

11.0 Attachments

              Attachment 1 –   ITR  -QGI-001           Notification (Request) for Inspection


Attachment 2 –   ITR -QGI-002          Release Note

Attachment 3 –   ITR -QMI-001         Receiving Inspection Report


PLAN FOR HOUSING PROJECTS-CIVIL WORKS (WELDING)
Inspection Points(HOLD PO
Acceptance Criteria Verifying Document

Subcon CONTR.

Approved Construction Drawing – Issued for Construction (IFC) & Mill


Certificates & Factory Production Control Certificates (FPC), No
physical defects, Safeguards against adverse environment ITR-QMI-001-Receiving
I W/R
Inspection Report

Low hydrogen/min. Tensile strength 480N/mm². As per manufacturers ITR-QMI-001- Receiving


I R
recommendations. Storage-Temp. & Humidity control environment Inspection Report

ITR-QCI-011 Structural Steel


Approved WPS & PQR
Checklist(para. 2 & 4)

I R
ITR-QCI-016- Steel Structure I R
Fabrication

Approved Construction Drawing – Issued for Construction (IFC)

ITR-QCI-0011 Structural Steel


Checklist- para. 2 & 4)

Conforming the AWS D1.1, Approved WPS & PQR I W/R

Welder or Welding Operator


Performance Qualification
Record

Signed “Release Form” from Concrete casting subcontractor/contractor QGI-002  Release Note I R

ITR-QCI-020- Foundation Pad


Elevation tolerance EL. ± 2mm., As per specification I W/R
Inspection Report

Approved Construction Drawing – Issued for Construction (IFC)AWS ITR-QCI-0011- Structural Steel
I W
D1.1/ D1.1M Checklist- para. 2 & 4)

Approved Construction Drawing – Issued for Construction (IFC)AWS ITR-QCI-0011 Structural Steel
I W
D1.1/ D1.1M Checklist- para. 2 & 4)
ITR-QCI-0018 Installation
Approved Construction Drawing – Issued for Construction (IFC) I W/R
Record For Structural Steel

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S
Steel Checklist(para. 5)

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S
Steel Checklist(para. 5)

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S/W
Steel Checklist(para. 3)

ITR-QCI-011 Structural
Approved Construction Drawing – Issued for Construction (IFC) I S/R
Steel Checklist(para. 3)

ITR-QCI-0017  Bolt Torque


Approved Construction Drawing – Issued for Construction (IFC) Inspection record for I W/R
Structural Steel

Conforming the AWS D1.1 ITR-QCI-0019 Welding


I S/R
Approved WPS & PQR Inspection Record
Conforming the AWS D1.1 ITR-QCI-0011 Structural Steel
I W/R
Checklist(para 4)

Approved WPS & PQR

ITR-QCI-0019 Welding
Approved Construction Drawing – Issued for Construction (IFC) I W/R
Inspection Record

Grout Inspection & Test


Grouting must be done after column verticality is plumbed I W
reports

ITR-QCI-025- Final inspection


Approved Construction Drawing – Issued for Construction (IFC) I W
for Structure Steel

ITR-QCI-025- Final inspection
Approved Construction Drawing – Issued for Construction (IFC) I W
for Structure Steel
Approved Construction Drawing – Issued for Construction (IFC) & Mill
ITR-QMI-001- Receiving
Certificates & Factory Production Control Certificates (FPC), No I W/R
Inspection Report
physical defects, Safeguards against adverse environment

Approved Construction Drawing – Issued for Construction (IFC), ITR-QCI-016- Steel Structure
I W
Approved tolerance – ASCI specification for Structural Steel Buildings Fabrication

ITR-QCI-016- Steel Structure


Approved joint detail As per WPS. I W
Fabrication

ITR-QCI-016- Steel Structure


Approved Construction Drawing – Issued for Construction (IFC) I W
Fabrication

AWS D1.1 Tabl;e 6.1 & 6.2


All lifting lugs 100% MPI Test ITR-QCI-016- Steel Structure
I W/R
- Verify NDT % has been completed Fabrication
AWS D1.1 Tabl;e 6.1 & 6.2 NDE Report I W/R

Approved Materials Specification ,  Material Brochure  & Catalogue ITR-QCI-023 Painting


I S/R
Specification Inspection Report

As per ASTM D-3359/ISO 2409 (Type Type) or ITR-QCI-023 Painting


I W/R
As per ASTM D-4541/ISO 2624 ( Dolly pull-off)) Inspection Report

nd Test      R: Review    S: Surveillance     W: Witness    H : Hold

ification (Request) for Inspection
     Release Note

iving Inspection Report


pection Points(HOLD POINTS)

RE/RTO SCC Lab

W/R S

S S

R R
R R

W R

R R

W/R R

R S

S S
W/R S

S S

S S

S S

S/R S

W/R R

S/R S
W/R S

W/R S/R

S S

R S

R W
W/R S

S S

S S

S S

W/R S
W/R S

S/R S/R

W/R S