Ministry of Energy and Energy Industries: November 30, 1996
Ministry of Energy and Energy Industries: November 30, 1996
DRAFT DOCUMENT
GUIDELINES
FOR
DRILLING
wells.
2
1. PERMISSION TO DRILL
2. DRILLING PROGRAMME
3
the Well Drilling Programme (DRL 2).
horizons.
casing points.
special wells:
4
the planned well.
should be indicated.
5
taken if the required formation strength is not obtained.
laps.
drilling fluid.
during tripping.
6
(e) Procedure for safe disposal of drilling fluids and
cuttings.
arrangement.
7
wells.
in the well.
same.
or losing circulation.
abnormal pressure).
8
An Operations Plan containing a detailed sequence
site.
9
approval.
3. DRILLING ACTIVITIES
Ministry.
10
pressures and fluids.
carried out.
tested operationally.
11
The conductor casing shall be set immediately prior
gas.
12
with abnormal pressures are isolated.
13
cementing, remedial action shall be taken.
stimulation.
14
casing shoe shall be performed after drilling no more
maintained.
4 MUD PROGRAMME
way.
15
Drill pipe and downhole tool running and pulling
times.
16
measures necessary to control the well shall be
the bottom.
detection.
17
accordance with the Code of Practice for Drilling
the Ministry.
18
6. SAFETY AND ENVIRONMENTAL MANAGEMENT
valves.
8. SECURING OF WELLS
19
valve, cement plug, bridge plug, or packer shall be used
9. INITIAL COMPLETION
Ministry.
20
Ministry shall receive daily before 9.00 a.m., by telefax
Appendix `B'.
APPENDIX `A'
GENERAL
21
Name of Form : Well Drilling Programme
Frequency : As occurs.
22
INSTRUCTIONS FOR THE PREPARATION OF WELL DRILLING PROGRAMME
PAGE 1 OF DRL 2
Location
identification :
23
Location Number :
Co-ordinates (links) :
ELEVATIONS :
RIGHTS :
24
stratigraphy of this well, noting drilled and
subsea depths of each marker.
25
INSTRUCTIONS FOR THE PREPARATION OF WELL DRILLING PROGRAMME
PAGE 2 OF DRL 2
MUD PROGRAMME:
DISTANCES TO NEAREST
WELLS AT OBJECTIVE
HORIZON:
26
SUMMARY OF CASING
PROGRAMME:
Hole:
27
INSTRUCTIONS FOR THE PREPARATION OF WELL DRILLING PROGRAMME
PAGE 3 OF DRL 2
28
APPENDIX `B'
Reporting date
Well identification
Operator
Present operation
29
(d) Substantial deviation from the
anticipated geological conditions.
30
The gas content of the drilling fluid out of the borehole
during drilling, connection and trip, indicating total
gas and gas components, as well as background gas for
circulated drilling fluid.
Hole size.
Hydrocarbon indications.
Cumulative costs.
31
All wireline logs, MWD logs, mud logs and computer-
generated logs must reach the Director, Operations
within one working day after their being run or
generated.
Geolograph Charts
32