Design Guide
CABLE DRUM
1,000 lb.
Requires attic space or
adjacent machine area
2 CABLE DRUM – 1,000 PLANNING GUIDE
Table of Contents
Planning Steps………………………………………………………………………….4
Hoistway Layout………………………………………………………………………..6
Hoistway Elevation…………………………………………………………………....15
Manufacturer’s Warranty………………………………………………………………24
CABLE DRUM – 1,000 PLANNING GUIDE 3
Planning Steps
4 CABLE DRUM – 1,000 PLANNING GUIDE
Work to be Done by General Contractor
The following specs are to be provided by the General Contractor (GC), except as noted,
prior to Marchal/Stevenson Elevator installing the elevator equipment.
1. Enclosed, plumb and square hoistway with smooth interior surfaces. Include fascia and
furring of hoistway interior, doors and frames. Fire rating of shaft to be prepared as
required by local building codes. Hoistway should be free of any obstructions not related
to elevator function (gas pipes, pilings, wiring, a/c ducts, etc.). It is recommended that the
hoistway be maintained between 40° and 120° F and interior should not be exposed to the
elements.
2. Provide 2x12 pine support #2 or better-full length of shaft (can be split), plumb and
properly supported (alternate solutions also available – see page 12). Must be capable of
supporting the loads imposed. Plank shall be fastened with deck screws or ring shank
nails – use Liquid Nails between 2x4 & 2x12. Do not sheetrock 2x12. See page 13.
3. Provide 2x6 pine support-full length of shaft (can be split), plumb and properly supported.
See page 13.
4. Provide pit – substantial level pit floor slab to support 3,000 lbs. impact load. Waterproof
pit minimum 8” below lowest floor level. (Sump pump is not required.)
5. Adequate space for the elevator machinery. See page 18.
6. If the elevator equipment is housed in a room or closet on any floor other than the attic, the
entrance door must be self-closing and self-locking to prevent unauthorized persons from
entering the area.
7. Electrical work & phone line: motor -permanent 230 volt, single phase, 30 amp dedicated
supply & disconnect by others -elevator lights- 120 volt, disconnect by others - leave 15’-
20’ extra wire to machine area. See page 17.
8. Finished openings as per Marchal/Stevenson Elevator’s shop drawings.
9. All hoistway doors require door locking devices (provided by Inclinator) as well as a door
handle and a latch set that meet ASME 17.1 requirements (i.e. adjustable ball or roller
catch, flush cabinet pull, pull handle ring lock, etc). Standard knobs/levers will not fit
appropriately unless a door baffle is applied and the area is cut-out.
10. All doors must be flush (or door baffles may be applied), swing type (single hinge) and 1
hour fire rated. See pages 13-14.
11. Provide door sills per ASME 17.1 – 2016 regulations. See page 13.
12. Overhead requirements: 12” above cab height – 9’ overhead required for 8’ inside cab
height – 8’ overhead required for 7’ inside cab height – 7’8” required for 6’8” cab height.
(Installing flooring by others will decrease the interior cab height by the thickness of the
flooring. For example: ¾” flooring by others will result in a 7’ 11¼” cab height if an 8’ cab is
selected.) If minimum overhead requirements are not available for the cab height you
desire, contact Marchal/Stevenson Elevator about possible solutions.
CABLE DRUM – 1,000 PLANNING GUIDE 5
Hoistway Layout
15 SQ. FT. IN USA
PIT DIMENSIONS
SAME AS ROUGH
OPENINGS. 8”
minimum pit depth
from finished floor.
**ALL HOISTWAY
USE FLUSH DOORS
SEE DRAWING ON PAGE 13
DIMENSIONS ARE ROUGH**
USE 5/8” SHEETROCK FOR
FIRE RATING
CABLE DRUM – 1,000 PLANNING GUIDE 7
SEE PAGES 11-12 FOR DETAILS
PIT DIMENSIONS
SAME AS ROUGH
OPENINGS. 8”
minimum pit depth
from finished floor.
**ALL HOISTWAY
USE FLUSH DOORS DIMENSIONS ARE ROUGH**
USE 5/8” SHEETROCK FOR
SEE DRAWING ON PAGE 13 FIRE RATING
8 CABLE DRUM – 1,000 PLANNING GUIDE
FOR DETAILS
SEE PAGES 11-12
PIT DIMENSIONS
SAME AS ROUGH
OPENINGS. 8”
minimum pit depth
from finished floor.
**ALL HOISTWAY
USE FLUSH DOORS DIMENSIONS ARE ROUGH**
USE 5/8” SHEETROCK FOR
SEE DRAWING ON PAGE 13 FIRE RATING.
CABLE DRUM – 1,000 PLANNING GUIDE 9
Hoistway Layout
ADDITIONAL CONFIGURATIONS
There are many additional layout options available. Please contact Inclinator or your local dealer for further
assistance on shaft configurations.
10 CABLE DRUM – 1,000 PLANNING GUIDE
Hoistway Construction
CABLE DRUM – 1,000 PLANNING GUIDE 11
Alternate Hoistway Construction
The following recommendations are for hoistways constructed of concrete or hollow concrete block.
When mounting to a solid concrete wall or solid filled concrete block use (2) concrete screw anchors with a
minimum ultimate strength in tension of 3000 lbs (i.e. Redhead LDT – Large Diameter Tapcon) per a
mounting bracket.
When mounting to hollow concrete block it is best to use ½” threaded rod and thru-bolt the superstrut
to the wall. ¼” Steel plate should be used on the back side of the wall for additional strength.
¾” X 4” RULE / DOOR FRAME DETAILS
Reference ASME 17.1-2016 5.3.1.4.2, 5.3.1.7.2, & 5.
CABLE DRUM – 1,000 PLANNING GUIDE 13
OPTIONAL: Flush Mount Door Frame Kit by
Inclinator – Installed by Others
14 CABLE DRUM – 1,000 PLANNING GUIDE
Hoistway Elevation
Minimum
Distance from
Travel Drum to Sheave
8'‐0" 2'‐0"
9'‐0" 2'‐3"
10'‐0" 2'‐6"
11'‐0" 2'‐8" MINIMUM
OVERHEAD
12'‐0" 2'‐11" MUST BE 12”
13'‐0" 3'‐2" TALLER
THAN INSIDE
14'‐0" 3'‐5" CAB HEIGHT
15'‐0" 3'‐8"
16'‐0" 3'‐10"
17'‐0" 4'‐1"
18'‐0" 4'‐4"
19'‐0" 4'‐7"
20'‐0" 4'‐10"
21'‐0" 5'‐0"
22'‐0" 5'‐3"
23'‐0" 5'‐6"
24'‐0" 5'‐9"
25'‐0" 6'‐0"
26'‐0" 6'‐3"
27'‐0" 6'‐6"
28'‐0" 6'‐9"
29'‐0" 7'‐0"
30'‐0" 7'‐3"
31'‐0" 7'‐6"
32'‐0" 7'‐9" 8” PIT MIN.
33'‐0" 8'‐0"
34'‐0" 8'‐3"
35'‐0" 8'‐6"
36'‐0" 8'‐9"
37'‐0" 9'‐0"
38'‐0" 9'‐4"
39'‐0" 9'‐8" SUBSTANTIAL LEVEL PIT FLOOR
40'‐0" 10'‐0" SLAB TO SUPPORT 3,000 LBS.
IMPACT LOAD.
CABLE DRUM – 1,000 PLANNING GUIDE 15
Technical Specifications
BOLT FASTENING OF CAR
TO TROLLEY ½” - 13 x 4”
SOCKET HD CAP SCREWS
NOTE: All mounting points should meet or exceed the minimum pull out force for all rail reactions.
NOTE: Follow the anchor manufacturer’s recommendations for type and size of drill
bit to be used.
16 CABLE DRUM – 1,000 PLANNING GUIDE
Machine Room Specifications
NOTE: The CPU/Controller and Motor Control is recommended to be mounted in the same location.
However, up to 40’ controller cables are available if needed.
1. Permanent 230 volt, single phase, 30 amp dedicated supply and disconnect by others to operate
the elevator.
2. 120 volt lighting supply and disconnect by others.
3. Telephone connection: Code requires a telephone connection. A phone line must be installed
leading to the controller. In the event of a power failure, VoIP systems lose connection – use
battery backup.
4. CPU/Controller and Motor Control is recommended to be mounted in a temperature-controlled
environment between 400 F to 1200 F (40C to 490C).
5. CPU/Controller and Motor Control should not be exposed to outdoor elements.
6. Typical wiring distance from the Motor Control to the gearbox is 10’. Longer motor cables up to 50’
are available. See wiring diagram on page 19 for more information.
7. N.E.C. regulations require a minimum of 30”x36” clear unobstructed floor space in front of the
controller. N.E.C regulations also state the floor to ceiling height of the control space should be 6’-
6” high.
8. If mounting the CPU/Controller or Motor Control inside the hoistway they should be located in such
a way that they can be inspected and maintained without full body entry into the hoistway.
CABLE DRUM – 1,000 PLANNING GUIDE 17
Machine Room Configurations
MACHINE ROOM
ADJACENT
In this configuration the machine room is located
either to the right or left of the guide rail. Requires:
CABLE DRUM – 1,000 PLANNING GUIDE 19
Machine Room Configurations
MACHINE ROOM
OVERHEAD
In this configuration the machine room is located
overhead in the attic. Requires:
AREA MUST BE A MINIMUM OF 3’X4’X 4’ TALL – 1’ AROUND
ALL SIDES TO BE FREE AND CLEAR OF ANY OBSTRUCTIONS –
SEE PAGE 15 FOR “MINIMUM DRUM TO SHEAVE DISTANCE”
MACHINE ROOM
BELOW
In this configuration the machine room is located
below the hoistway. Requires:
20 CABLE DRUM – 1,000 PLANNING GUIDE
Gearbox Assembly
Travel Sheaves
Reactions on all 1000# cable drum sheaves rated at 1800lbs.
Flat Bracket
Floating
Sheave
Stand
With Angle
Sheave
RAIL JAW
CABLE DRUM – 1,000 PLANNING GUIDE 21
Hall Call Stations
22 CABLE DRUM – 1,000 PLANNING GUIDE
S UC601 Cable Lengths and Components
T
A
N
D
A
R
D
M
O
U
N
T
A
T
T
I
C
M
O
U
N
T
6
F
L
O
O
R
S
M
A
X
6
F
L
O
O
R
S
M
A
X
-S
7
Sw
l
a
c
kCa
Cad=
ab
b
l
e
6CL
-a
Pb
tl
i
SS=b
w
i
tn0
c
hd
Door Lock Door Lock
tnn
i
c
hd
e 0
l
eg
t e0
a
a
r
d
PIT SWITCH
2SL
-t
Mn
o
t
rd=e0
o
C 1
a f
b t
l
e
Hall Stations RMT
SLAu
aev
t
r
eA
nv
t
h
2 t
f
t
RMT
ae
d
a
r
FLR X ‐ DR 1 FLR X ‐ DR 2
g
t
ha
2 t
f
t
a
i
ao
l
l
nv
g
t
h
0
CALL CALL
a
it
l
b6
e0
l
u
p
t
6
f
Au
a
i
ao
l
b
l
p
o
f
p
t
5
f
t
TO MOTOR
SLACK CABLE
A
d
d
i
t
i
o
n
a
l
L
a
n
d
i
n
g
s
SWITCH
Door Lock Door Lock
STOP
RUN
MOTOR CPU/CONTROLLER TOC CABLE
CALL CALL
ENCLOSURE
CONTROL ENCLOSURE Standard
T
e
m
p
e
r
a
t
u
r
e
R
a
n
g
e
:
4
0
°
F
t
o
1
2
0
°
F
(
4
°
C
t
o
4
9
°
C
)
ENCLOSURE
Lengths
T4
e0
m°
p
e
ro
a
t
u2
e0
r
R(
a
n4
g
eC
:
F
t
1
°
F
°
t
o
4
9
°
C
)
2L ‐ 44'
3L ‐ 56'
4L ‐ 68'
5L ‐ 80'
6L ‐ 92'
Door Lock Door Lock
3S
-t
Hn
a
la
Sdl
t
aL
t
i
o
ng
Ct
a='
b
l
e1
av
di
r
eu
n
h3
6
f
t
RMT RMT
FLR 1 ‐ DR 2
A
a
l
a
b
e
p
t
o
0
FLR 1 ‐ DR 1
CALL CALL
4S
-t
La
o
c
ka
Cd
a=
b
l
e0
n
d
r
6
"
1&SA
-Pt
Cono3
o
nea
t
r
o
lC
e
rb
Ce
a t
b
l
e =
Door Lock Door Lock
w
rda
aeb0
lg
RMT RMT
al
d
r
L
nef
h@
5
t,
f
-S
7
Sw
l
a
c d
k
Cad=
ab
b
l
e
6CL
-ae
P
teg
i
SS=b
w
i
tn0
c
hd
FLR X ‐ DR 1 FLR X ‐ DR 2
s0
A
v
i
l4
a
l
1
0
i
t
c
h
Cr
e 0
l
ln
b
t e0
a
a
r
d
2
,
0
,
&
t
.
SLAu
ae
t
nn
at
t
h
2 t
f
t
gl
ha
2 t
f
t
Au
v
a
i
ao
l
l
v
a
it
b6
e0
l
p
t
6
f
2SL
-t
Mn
o
t
or
r
C 1
a f
b
l
e
p
o
f
TO MOTOR
ae
d
a
d=l
3SA
-t
Hn
ld
a
S
t
teu
a
i
o
nt
Ch3
a=0
b
l
e6
nv
g
t
h
0
t
av
a
rb
d
L
n
gt
1
f
t
Au
a
i
ao
l
b
e0
a
i
l
a
l
e
p
o
'
SLACK CABLE
p
t
5
f
t
SWITCH
Door Lock Door Lock
RMT RMT
FLR 2 ‐ DR 1 FLR 2 ‐ DR 2
STOP
RUN
CALL CALL
n
d
r
6
"
F
t
o
0
F
t
o
4
9
°
C
)
ENCLOSURE
T
e
m
p
e
r
a
t
u
r
e
R
a
n
g
e
:
4
0
°
F
t
o
1
2
0
°
F
(
4
°
C
t
o
4
9
°
C
)
A
d
d
i
t
i
o
n
a
l
L
a
n
d
i
n
g
s
5 ‐ TRAVELING
Door Lock Door Lock
CABLE
Standard RMT RMT
Lengths FLR 1 ‐ DR 1 Hall Stations FLR 1 ‐ DR 2
1&SA
-Pt
Cono3
o
n
t
r
o
lC
l
e
rb
Ceg
a t
b
l
e 50
2L ‐ 44'
CALL CALL
wd
e
rd
aL
l
3L ‐ 56'
al
ra,
a
ea
nb
h
=
t,
f
4L ‐ 68'
s0
A0
v
i
l4
l
e
@
1
5L ‐ 80'
2
,
&
0
f
t
.
6L ‐ 92'
Cable lengths shown are standard based on number of landings ordered. Inclinator offers
additional cable length options to meet non-standard installations. Please see order form for
additional information on longer cable lengths
CABLE DRUM – 1,000 PLANNING GUIDE 23
Manufacturer’s Warranty
INCLINATOR COMPANY OF AMERICA – LIMITED PRODUCT WARRANTY
24 CABLE DRUM – 1,000 PLANNING GUIDE
THIS WARRANTY IS EXCLUSIVE AND IN LIEU OF ALL OTHER EXPRESS AND IMPLIED
WARRANTIES WHATSOEVER, INCLUDING BUT NOT LIMITED TO, THE IMPLIED
WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE,
AND IS LIMITED TO A PERIOD OF TWO YEARS (UNLESS EXTENDED) FROM THE TIME
THE PRODUCT IS SHIPPED FROM INCLINATOR'S FACTORY.
Buyer shall notify Seller of any warranty claim. Seller will provide a Return Material
Authorization (RMA) number, ship replacement part(s) and issue an invoice for part(s)
covered under warranty. Replacement part(s) will be shipped to the Buyer using standard
shipping practices. Overnight and 2nd day shipment will be billed as an additional charge.
Seller may, at its option, provide factory reconditioned parts for replacement. The warranted
part(s) shall be returned from the Buyer to the Seller within 60 days from issuance of the
RMA. Seller shall confirm that the parts are defective in materials or workmanship within two
weeks of receipt from the Buyer and will issue credit for such parts confirmed to be defective.
Should such defective parts not be promptly replaced, BUYER'S SOLE AND EXCLUSIVE
REMEDY SHALL BE RECOVERY OF THE FULL PURCHASE PRICE OF THAT
DEFECTIVE PART.
BUYER EXPRESSLY AGREES THAT THIS REMEDY IS THE SOLE AND EXCLUSIVE
REMEDY OF BUYER AGAINST SELLER, AND THAT UNDER NO CIRCUMSTANCES
SHALL SELLER BE LIABLE TO BUYER FOR ANY OTHER LOSSES OR EXPENSES,
INCLUDING BUT NOT LIMITED TO ANY CONSEQUENTIAL, INCIDENTAL, INDIRECT,
CONTINGENT OR PUNITIVE DAMAGES, REGARDLESS OF WHETHER SUCH LIABILITY
IS BASED ON BREACH OF CONTRACT, TORT, STRICT LIABILITY, BREACH OF
WARRANTIES, FAILURE OF ESSENTIAL PURPOSE, INTELLECTUAL PROPERTY
INFRINGEMENT OR OTHERWISE.
CABLE DRUM – 1,000 PLANNING GUIDE 25