Initial Environmental Examination (Iee) Checklist For Small Water Impounding Project
Initial Environmental Examination (Iee) Checklist For Small Water Impounding Project
1. GENERAL INFORMATION:
(Attach location map with important landmarks and access points indicated as
Annex 1)
Purpose : [] irrigation
[ ] rice [ ] sugar ( ] others
[] other purposes: ________________________________
_____________________________________________________________________
_____________________________________________________________________
Page 1 of 16
IEE Checklist for
Small Water Impounding System Project
2. PROJECT DESCRIPTION:
Others_______________________
attach photocopy of document
Page 2 of 16
IEE Checklist for
Small Water Impounding System Project
Attach photo, panoramic view of project site where the dam will be located and its immediate
vicinity (provide captions)
Attach photo of the area where the service canal will traverse (provide captions)
Page 3 of 16
IEE Checklist for
Small Water Impounding System Project
Water Utilities
Name of water source Classification (i.e. river, spring, etc.) Discharge rate
in Cu.
Meter/second
What are the total water requirements of the area served by the project? _________in cu.
Meter/Sec.
Page 4 of 16
IEE Checklist for
Small Water Impounding System Project
1. Physical Environment of the area where the dam will be located: Components/
Parameters
Answer
Y N
Is the terrain flat or level? (0 - 3% slope)
Is the terrain level to undulating? (3 – 8% slope)
Is the terrain undulating to rolling? (8 - 18% slope)
Is the terrain rolling to moderately steep? (18 - 30% slope)
Is the terrain moderately steep to steeply mountainous? (30 - 50% slope)
Is the terrain very steeply mountainous? (above 50% slope)
Is the site near or with a forest reserve or a protected watershed area? If yes,
how near? ___________ meters
Are there water bodies found inside or near the project site? If yes, please
enumerate them.
1. 2.
Are there any existing structures or development around the project site? If YES,
please list them in the space below
Page 5 of 16
IEE Checklist for
Small Water Impounding System Project
How deep is the river water during the dry season? (meters)
How deep is the river water during the wet season? (meters)
Brackish
Residential Agricultural
Are there other vegetation within the project site where the dam yes no
will be located?
If yes, please identify and enumerate:
1. 2.
3. 4.
5. 6.
3. Socio-Economic Environment
3a. Existing Settlements within the project site
Page 6 of 16
IEE Checklist for
Small Water Impounding System Project
Number of family/s to be
relocated
3b. Proposed/ Profile of staff employed in the project/establishment (dam and service canal)
Male Female
How many of the proposed staff will come from the residents in the area?
Are there health facilities (clinic, etc.) within the project site? yes no
Are the required benefits under the Labor Code and other yes no
regulations enjoyed by the staff?
If yes, please enumerate them:
1. 2.
3. 4.
5. 6.
______
_____________________________________________________________________
4. PROJECT IMPACTS
Page 7 of 16
IEE Checklist for
Small Water Impounding System Project
Page 8 of 16
IEE Checklist for
Small Water Impounding System Project
Page 9 of 16
IEE Checklist for
Small Water Impounding System Project
Page 10 of 16
IEE Checklist for
Small Water Impounding System Project
Page 11 of 16
IEE Checklist for
Small Water Impounding System Project
Page 12 of 16
IEE Checklist for
Small Water Impounding System Project
Legend:
(+) - positive (-)- negative
D -direct I- indirect
S- short term L- Long term
R -reversible Ir- irreversible
Page 13 of 16
IEE Checklist for
Small Water Impounding System Project
6. PROPONENT COMMITMENT
Comply with existing environmental rules and regulations, guidelines and criteria?
Comply with all mitigation and enhancement measures and environmental management plan
that are indicated in the report.
Undertake/ comply with the contingency management plan formulated for the project.
Properly brief and orient employees about the ECC conditions, commitment and agreement
made about the project.
_______________________________________
Signature of the Proponent
Page 14 of 16
IEE Checklist for
Small Water Impounding System Project
7.0 ATTACHMENTS/ANNEXES
PERMITS/CLEARANCES YES NO
Location Map/Vicinity Map
Documents Pertaining to land ownership i.e. TCT, OCT, TD)
Page 15 of 16
IEE Checklist for
Small Water Impounding System Project
ACCOUNTABILITY STATEMENT
This is to certify that all the information and commitments in this Initial Environmental
Examination (IEE) Report are true, accurate, and complete. Should I/we learn of any
information which would make the IEE inaccurate, I/we shall bring said information to the
attention of the Environmental Management Buireau of DENR Regional Office.
I/We hereby bind myself/ourselves jointly and solidarily for any penalties that may be
imposed arising from any misrepresentations or failure to state material information in the IEE.
In witness whereof, I/we hereby set our hands this ___________day of ____________at
______________________________________.
__________________________________
Project Proponent
Title or Designation
ACKNOWLEDGEMENT
________________________________
Notary Public
Doc. No. _______
Page No. _______
Book No. _______
Series of ____
Page 16 of 16