Systems Handing Over

The document provides a diagram of the systems that will be handed over by the system for an ACDU DCP-B project. It includes the electrical systems from medium to low voltage, the chilled water system, domestic and drainage systems, generator and fuel systems, fire fighting systems, and ELV systems like CCTV, access control, telephone/data, PAVA, fire alarm, elevators, and monorail. Each ELV system will be handed over separately.

Uploaded by

Mohamed AAmer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Systems Handing Over

The document provides a diagram of the systems that will be handed over by the system for an ACDU DCP-B project. It includes the electrical systems from medium to low voltage, the chilled water system, domestic and drainage systems, generator and fuel systems, fire fighting systems, and ELV systems like CCTV, access control, telephone/data, PAVA, fire alarm, elevators, and monorail. Each ELV system will be handed over separately.

Uploaded by

Mohamed AAmer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ACDU DCP-B: Handing over by System May 16, 2020

Handing Over by System

Generator & Fuel


Electrical Condenser system
Electrical Low Chilled Water Domestic &
Medium Water
Voltage System Drainage
Voltage System

Fire Fighting
 MV Switch Gear  MDB  Cooling Tower  Absorption chillers  Submersible (Pumps & system )
 Transformer  Final Panel  Condenser Pump  Centrifugal Chillers pumps
 Primary Pumps
 MV Cables  Distribution  Side stream Filter  Secondary Pumps
 Booster Pumps
 Busway Panels  VFD for pumps &  Water Treatment  Water Heaters
 MV MCC  Capacitor Bank Towers  VFD & soft starters  Sanitary Ware
 ATS  Chemical
Treatment UPS & central
Batteries

ELV Systems
( Each will be handed over
seperatly)
Elevator & Monorail

Access Telephone & PAVA Fire Alarm


CCTV
Control Data System System