This document contains a summary of drainage construction works including 11 line items. The total price without VAT and provisional sums is NRs. 27,125,745. Item 1 is a provisional sum. Major works included are earthwork excavation, brick soling, cement concrete, brick masonry, plastering, reinforcement, formwork and more. The estimated quantities and rates are provided by Jalpapur Muslim Nirman Sewa.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
40 views
Sl. No Category Hierarchy
This document contains a summary of drainage construction works including 11 line items. The total price without VAT and provisional sums is NRs. 27,125,745. Item 1 is a provisional sum. Major works included are earthwork excavation, brick soling, cement concrete, brick masonry, plastering, reinforcement, formwork and more. The estimated quantities and rates are provided by Jalpapur Muslim Nirman Sewa.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8
SL.
NO Category Hierarchy
1 Provisional Sum #[XXX0001]>
2 General works>
3 General works>
4 Drain Construction works >
5 Drain Construction works >
6 Drain Construction works >
7 Drain Construction works >
8 Drain Construction works >
9 Drain Construction works >
10 Drain Construction works >
11 Drain Construction works > Total Price (Without VAT and PS) Discount Discounted Total Rank PE's Estimate Item Name & Description Quantity Unit NA 1 PS
Insurance for the loss of damage to works,
plant, material, equipment property and personnel injury or death and third party 1 LS
Supplying and Erecting informatory board
and name plate (contract details) in place including 50mm dia. steeel tube, 2mm thick steel plate sign board in place 1.2m.x 0.75m. Size bigger with back support and two or more post as instructed by the engineer all Complete as per Specification. [SS/SP-1501] 1 Nos
Earthwork excavation in all types of soil
for drain and trenches including shoring, struting, bracing, sheeting and disposal upto requieed lead and lift etc. all complete as per specification[SS/PP 905] 265.33 m3
Providing and laying of hand pack flat
Brick soling on prepared surface as per Drawing and Technical Specifications. 25.26 m3 Providing and placing cement concrete for the non-structural elements including compaction, curing, testing and relevant lead etc. as per drawing all complete as per specification. (Grade M15)[SS/SP- 2000] 30.96 m3
Providing and laying Brick Masonry Work
in Cement mortar in Foundation / structure complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Cement sand mortar (1:4) 77.8 m3
Providing and applying 12.5 mm thick
Plaster with cement mortar on brick work structure as per Technical Specifications Cement sand mortar (1:4) 423.7 m2
Providing and laying Reinforcement( Fe
500 )including cutting, bending, binding, fixing in position and lead 30m. etc. all complete as per specification and drawing. 2.06 Mt
Providing and laying of Plain/Reinforced
Cement Concrete in Foundation complete as per Drawing and Technical Specifications. RCC Grade M 25 15.96 m3 Providing , Preparing and Installing form work including necessary supports and removing after completion for walls. (Class F2 Finish), 398.62 m2 jalpapur muslim nirman sewa, PE's Estimate jalpapur-07-sunsari Official Rate (NRs) Amount Rate 0 0 0
30000 30000 35000
7635.28 7635.28 17000
193.13 51243.18 450
9375.38 236822.1 5000
11590.54 358843.12 12000
16114.04 1253672.31 18000
316.72 134194.26 500
124051.98 255497.46 66000
15618.42 249269.98 11000
1032.66 411638.93 300 2988816.62 0 2988816.62 NA muslim nirman sewa, pur-07-sunsari Amount 0