3.0 Doc Structure EM Works

The document outlines bidding documents for an EPC/turnkey project to execute the 4x225MW Arun-3 Hydro Electric Project. It includes an invitation for bids and sections on the employer's requirements such as the project profile and drawings, scope of works, planning, design, engineering and general requirements, and electro-mechanical works requirements including general and particular technical specifications and quality assurance requirements.

Uploaded by

balwant_negi7520
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views

3.0 Doc Structure EM Works

The document outlines bidding documents for an EPC/turnkey project to execute the 4x225MW Arun-3 Hydro Electric Project. It includes an invitation for bids and sections on the employer's requirements such as the project profile and drawings, scope of works, planning, design, engineering and general requirements, and electro-mechanical works requirements including general and particular technical specifications and quality assurance requirements.

Uploaded by

balwant_negi7520
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

BIDDING DOCUMENTS FOR EPC/TURNKEY EXECUTION

ARUN-3 HYDRO ELECTRIC PROJECT (4X225MW)


(Single Stage- Two Envelope, E-Tendering DCB Basis)

EM works Document Structure/layout

Invitation for Bids (IFB)

- EM aspect

PART 2 – EMPLOYER’S REQUIREMENTS

Section V.1 Project Profile & Drawings

Section V.2 Scope of Works

Section V.3 Planning, Design, Engineering & General Requirements

Section V.6 Electro-Mechanical Works Requirements

Section V.6.1 General Technical Specification

Section V.6.2 Particular Technical Specification

Section V.6.3 Quality Assurance Technical Requirement ( QA&I responsibility)