2.2 Part - 2 Scope of Works - V.2

The document outlines the scope of works for the Arun-3 Hydro Electric Project including civil works, electro-mechanical works, and hydro-mechanical works. It lists the main elements to be executed and provides appendices that give further details on planning, design, engineering, civil works, electro-mechanical supply works, hydro-mechanical supply works, and services for electro-mechanical and hydro-mechanical works.

Uploaded by

balwant_negi7520
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views

2.2 Part - 2 Scope of Works - V.2

The document outlines the scope of works for the Arun-3 Hydro Electric Project including civil works, electro-mechanical works, and hydro-mechanical works. It lists the main elements to be executed and provides appendices that give further details on planning, design, engineering, civil works, electro-mechanical supply works, hydro-mechanical supply works, and services for electro-mechanical and hydro-mechanical works.

Uploaded by

balwant_negi7520
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

SJVN Ltd Arun-3 HEP Part-2 Employer’s Requirements

PART-2

SECTION- V EMPLOYER’s REQUIREMENTS

Section V.1 Project Profile & Drawings

Section V.2 Scope of Works

Section V.3 Planning, Design, Engineering & General Requirements(PDE)

Section V.4 Civil Work Requirements

Section V.5 Hydro-Mechanical Work Requirements

Section V.6 Electro-Mechanical Work Requirement

Section-V.2 Scope of Works EPC/Turnkey Basis (Dec 2019, Ver1.0) Page 1


SJVN Ltd Arun-3 HEP Part-2 Employer’s Requirements

SECTION- V EMPLOYER’s REQUIREMENTS

Section V.2 Scope of Works

Section-V.2 Scope of Works EPC/Turnkey Basis (Dec 2019, Ver1.0) Page 2


SJVN Ltd Arun-3 HEP Part-2 Employer’s Requirements

Table of Contents
Sr. No. CONTENTS Page No.

1 General

2 Civil Works

3 Electro-Mechanical & Hydro-Mechanical works

3.1 Electro-Mechanical Equipment

3.2 Hydro-Mechanical Steel Structure

Appendix- D1 Scope for Planning, Design and Engineering Services

Appendix-CW1 Scope of Civil Works

Appendix-EM1 Scope of EM Works (Supply)

Appendix-HM1 Scope of HM Works (Supply)

Appendix-EM/HM-1 Scope of Services for EM/HM Works

Section-V.2 Scope of Works EPC/Turnkey Basis (Dec 2019, Ver1.0) Page 3


SJVN Ltd Arun-3 HEP Part-2 Employer’s Requirements

SCOPE OF WORKS
1. GENERAL:
The main works to be executed for the Arun-3 Hydro Electric Project 900MW (4x225MW) on
EPC/Turnkey basis (Project as a whole), according to the General Layout, include, but not
restricted to the following elements:

2. Civil Works

(Civil works scope to be elaborated)

3. Electro-Mechanical and Hydro-Mechanical Works


The Electro-Mechanical and Hydro-Mechanical works to be supplied under this contract are as set
out below. The works under this contract includes, but not limited to, the following list:

3.1 Electro-Mechanical woks:

3.2 Hydro –Mechanical works:

(Hydro-Mechanical works to be elaborated)

Any other Work/equipment required for meeting the functional requirements of the Plant are within
the scope of this proposal;

The detail scope of works for each services/works envisaged in the Contract is provided in the
following Appendices viz.

1. Appendix- D-I Detailed scope of Planning, Design & Engineering services.


2. Appendix- D-II Supply of Drawings, Reports etc.
3. Appendix-CW 1 Scope of Works - Civil Works
4. Appendix EM-1 Scope of Works – EM (Supply)
5. Appendix HM-1 Scope of Works - HM (Supply)
6. Appendix EM/HM-1 Scope of Works – EM/HM (Services, Erections etc.)

Section-V.2 Scope of Works EPC/Turnkey Basis (Dec 2019, Ver1.0) Page 4