STORM WATER DRAINAGE SCHEME FOR MUZAFFARPUR SMART CITY ABD AREA
DETAILED ESTIMATE
Name of the Work: Dismantling of Pavement
Sl No Description Unit Nos L B D Qty
STORM WATER DRAINAGE SCHEME FOR MUZAFFARPUR SMART CITY ABD AREA
ABSTRACT ESTIMATE
Name of the Work: Dismantling of Pavement
S.No. Description Unit Quantity Rate (Rs) Amount in (Rs) SOR Reference
1
Cutting road and making good the same including supply
of extra quantities of materials i.e. aggregate, moorum 16.13 BCD SOR 2018
screening, red bajri and labour required.
seigniorage @
SI. No. Ref. No. Marerial Factor Quantity Basic Rate Amount
10%
1 4.2 (2) GSB Grading II 9118.39
26.5 mm to 4.75 mm @ 75 per cent 0.75 6838.79 604.91 4136854.36 413685.44
2.36 mm below @ 25 per cent 0.25 2279.60 236.71 539603.57 53960.36