The presentation provides an overview of the Eagle Gold Project, including: 1. Health, safety, and environmental performance has been strong with no lost time injuries. 2. Construction is 60% complete and on schedule to produce first gold in late 2019. Infrastructure like power, camp, and roads are established. 3. Commissioning will begin in early 2019 with the goal of having all systems operational by the third quarter.

Uploaded by

AngarEnkhzaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views83 pages

Victoria Gold

The presentation provides an overview of the Eagle Gold Project, including: 1. Health, safety, and environmental performance has been strong with no lost time injuries. 2. Construction is 60% complete and on schedule to produce first gold in late 2019. Infrastructure like power, camp, and roads are established. 3. Commissioning will begin in early 2019 with the goal of having all systems operational by the third quarter.

Uploaded by

AngarEnkhzaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 83

Analyst Presentation

December 2018

T S X .V V I T | V I T G O L D C O R P. C O M
1
Agenda

TSX-V: VIT
1. HS&E (Ayranto) 4. Eagle Operations (Rouleau)
Org Chart & Team To-date

vitgoldcorp.com
2. Eagle Construction (George) Systems
Infrastructure Ramp-up
Crushing System Open Pit Mining
Leach Facility
Gold Recovery Plant 5. Resource Update (Gray/Ayranto)
Schedule
CAPEX 6. Exploration Update (Gray)

3. Eagle Commissioning (Ayranto)


Team
Schedule

2
HS&E

TSX-V: VIT vitgoldcorp.com

3
HS&E

TSX-V: VIT
Through the end of Oct H&S states:

vitgoldcorp.com
Current project hours: exceed 950,000 hrs
Over 600,000 hrs without a LTI
No major environmental infractions

4
Eagle Construction

TSX-V: VIT vitgoldcorp.com

5
Project Progress

TSX-V: VIT
Overall project is 60% complete

Schedule is on track to deliver First

vitgoldcorp.com
Gold in H2 2019

Engineering is effectively complete

Earthworks are substantively


complete

Concrete is 93% complete

Structural steel is 32% complete

Mechanical contractors are mobilized


to site and equipment is being placed

6
Site Layout

TSX-V: VIT
Secondary &
Gold HLF Tertiary Crushers

vitgoldcorp.com
Recovery
Plant Primary
Crusher

Camp Warehouses

Waste Handling
and Incinerator Power Plant &
Sub-Station

7
Infrastructure

TSX-V: VIT vitgoldcorp.com

8
Site Infrastructure 69kV Powerline

TSX-V: VIT
Communications
tower
450 person camp (220 for
operations)

vitgoldcorp.com
45km 69kV powerline
5MW Power plant (Q1 2019)
Warehousing & Workshops
Warehouses &
Waste facilities including and Workshop
incinerator
Water management facilities
McQuesten sub-station
Upgraded access road

Camp

9
Crushing System

TSX-V: VIT vitgoldcorp.com

10
Primary & Secondary / Tertiary Crushing

TSX-V: VIT
Tertiary Crusher
Stockpile Primary Crusher

vitgoldcorp.com
Secondary & Tertiary
Crusher Facility

11
Primary Crusher

TSX-V: VIT
vitgoldcorp.com
Primary crusher concrete tower complete Steel erection and mechanical
Design ….. to ……Realisation installations commence
December

12
Course Ore Stockpile & Reclaim

TSX-V: VIT
vitgoldcorp.com
13
Secondary & Tertiary Crusher Frame Installation

TSX-V: VIT
vitgoldcorp.com
14
Overland Conveyor & Ore Preparation

TSX-V: VIT
Crushing facilities

vitgoldcorp.com
HLF

Location of ore preparation facilities:


• Transfer from overland conveyor
to HLF feed conveyor
• Lime addition
• Belt sampler

15
Heap Leach Facility

TSX-V: VIT vitgoldcorp.com

16
17

TSX-V: VIT vitgoldcorp.com


Heap Leach Facility
Gold Recovery Plant

TSX-V: VIT vitgoldcorp.com

18
19

TSX-V: VIT vitgoldcorp.com


Gold Recovery Plant
20

TSX-V: VIT vitgoldcorp.com


Gold Recovery Plant
Commissioning

TSX-V: VIT vitgoldcorp.com

21
22

TSX-V: VIT vitgoldcorp.com


Commissioning
23

TSX-V: VIT vitgoldcorp.com


Commissioning
Commissioning

TSX-V: VIT
Key Commissioning Milestones
2018 2019
Activity J F M A M J J A S

vitgoldcorp.com
YEC McQuesten upgrades complete

69kV Transmission line inspection and testing


69kV Substation testing
Wajax genset testing
YEC Energization
YEC/Wajax Integration and testing
Energization of on-site distribution network
ADR Plant testing
Pregnant Solution pump testing
Primary Crusher testing
Coarse Ore handling
Secondary/Tertiary Crusher testing
Secondary/Tertiary Screen testing
Overland Conveyance testing

24
Operations

TSX-V: VIT vitgoldcorp.com

25
Organizational Readiness

TSX-V: VIT
Operations Leadership Team
General
Manager
Dave Rouleau

vitgoldcorp.com
Mine Process Technical Maintenance Health & Site Services Human
Supply Chain Safety Manager Resources
Operations Operations Services Manager
Manager Manage
Manager Manager Manager Doug Manager Mike Gunn
Kirk McLellan Eileen Olivier
Kelly Parker Barry Carlson Steve Tang Desaulniers Vacant

Senior leadership team in place


Organizational Chart established
Next level of support staff currently
being on-boarded, which includes
general foremen, shift supervisors,
operators, engineers, planners,
millwrights, electricians, welders
Manpower ramp-up schedule
finalized
26
Primary Equipment Fleet

TSX-V: VIT
Function No Type
Loading 2 CAT 6040 Excavators
2 CAT 993 Loaders

vitgoldcorp.com
Drilling 2 CAT 6290 Drill
1 SmartROC D65 Drill
Hauling 11 CAT 785 Haul Trucks
Support 4 CAT D10 Dozers
2 CAT 16M Graders
1 CAT 390 Backhoe

27
Open Pit and Waste Dump Layout

TSX-V: VIT
vitgoldcorp.com
28
Mine Development Sequence

TSX-V: VIT
Mine Development 2019 Main Pit Access Road
• Construction of main pit access road to
open pit will commence early January
• Pre-strip of starter pit will start in March

vitgoldcorp.com
• Ore available mid Q2 in advance of
commissioning crushing and
conveyance systems

Mine Pit Access Road


• Single lane access road to be developed
in collaboration between Contractor
and Victoria Gold’s resources
• Haul road will be widened to double
lane once pre-stripping commences

Development of Starter Pit


• Clearing and grubbing will be
completed in Q1
• Production benches and access to ore
will be ready by end of Q2
• Gradual production profile developed
for early operations

29
Operating Systems

TSX-V: VIT
Engineering Planning /Survey Systems
• Mine design and planning system in place (MineSight)
• High precision guidance system planned to implemented starting
in 2020

vitgoldcorp.com
Production Support Systems
• Establish a wireless network access in 2019 in support for
implementations for a light fleet management system
• Other production/continuous improvement systems will be
evaluated for implementation over the first 3 years of operation

Slope Monitoring Systems


• A combination of Prism/total station and pit monitoring radars to
be implemented as waste dumps, heap leach pad, and final pit
walls are established

ERP System
• Integrate management of core business processes
• Maintenance planning, purchasing, inventory, finance and human
resources main focus
• Implement and execute ERP system Q1 2019

30
Resource Update

TSX-V: VIT vitgoldcorp.com

31
2018 Eagle Resource Update - Overview

TSX-V: VIT
Eagle Geologic Model –
Eagle Resource Model and Local Drill hole Locations Perspective View Looking Northeast

vitgoldcorp.com
32
Resource Comparison – 2016 FS to 2018 Update

TSX-V: VIT
Following the Feasibility study, additional holes were drilled during Victoria Gold’s 2017 Dublin
Gulch Exploration campaign, with 58 new holes located within and around the area of the Eagle
Zone

vitgoldcorp.com
Measured + Indicated Inferred
Avg Au Avg Au
Tonnage Content Tonnage Content
Zone Grade Grade
tonnes oz tonnes oz
g/t g/t
2016
180,720,000 0.625 3,631,000 17,430,000 0.492 276,000
Feasibility
2018 Update 198,720,267 0.639 4,082,573 12,780,597 0.490 204,631

Difference +10.0% +2.4% +12.4% -26.7% +1.6% -25.9%

~18,000,000 Tonnes added to M+I


Increase in M+I Gold grades – conformational of well behaved Eagle Deposit
~450,000 Ounces of Gold Content Increase in M+I

33
Resource Comparison – 2016 FS to 2018 Update
Discussion

TSX-V: VIT
The new Eagle drillholes have indicated a continuation of the mineralization in Eagle and
defined mineralization within the margins of the Resource Pit; the updated model is slightly
wider on the periphery and to depth.

vitgoldcorp.com
A completely unbiased, new interpretation of the mineralized zone at the Eagle Deposit was
carried out from first principals. Excellent agreement with original model, well behaved,
consistently mineralized deposit.
The overall shape of two mineralized lobes on the western portion joining in the central area
and forming a single orebody in the eastern half was maintained.
Slightly Smaller composite length (1.52m instead of 2.5m) was used.
The capping (18.0 g/t Au) was carried out on the composites, compared to the capping of the
original samples performed for the Feasibility study (16.0 g/t) – negligible differences.
Ordinary Kriging with a different set of parameters based on strict variography statistical
approach was used in the updated estimation with less restrictions applied to the sample
selection strategy (no octant or maximum of holes restrictions).
The classification scheme for the resource update was based on the average sample distance
away from the block center. A set of 2 distances based on the variogram range were utilized
to separate measured, indicated, and inferred resources

34
Section 459,280E

TSX-V: VIT
October 2018 Update - MII 2016 Feasibility - MII

vitgoldcorp.com
35
Section 459,280E

TSX-V: VIT
2018 Additional Estimates in Measured+Indicated (>= 0.15 g/t Au)

vitgoldcorp.com
36
Section 459,680E

TSX-V: VIT
October 2018 Update - MII 2016 Feasibility - MII

vitgoldcorp.com
37
Section 459,680E

TSX-V: VIT
2018 Additional Estimates in Measured+Indicated (>= 0.15 g/t Au)

vitgoldcorp.com
38
Section 459,880E

TSX-V: VIT
October 2018 Update - MII 2016 Feasibility - MII

vitgoldcorp.com
39
Section 459,880E

TSX-V: VIT
2018 Additional Estimates in Measured+Indicated (>= 0.15 g/t Au)

vitgoldcorp.com
40
Section 460,280E

TSX-V: VIT
October 2018 Update - MII 2016 Feasibility - MII

vitgoldcorp.com
41
Section 460,280E

TSX-V: VIT
2018 Additional Estimates in Measured+Indicated (>= 0.15 g/t Au)

vitgoldcorp.com
42
Longitudinal Section Looking North – Northern Lobe

TSX-V: VIT
October 2018 Update - MII 2016 Feasibility - MII

vitgoldcorp.com
43
Longitudinal Section Looking North – Northern Lobe

TSX-V: VIT
2018 Additional Estimates in Measured+Indicated (>= 0.15 g/t Au)

vitgoldcorp.com
44
Exploration Update

TSX-V: VIT vitgoldcorp.com

45
Dublin Gulch Exploration - 2018
2018 Targets & Programs

TSX-V: VIT
Dublin Gulch Block

1. Olive-Shamrock – Au 4

vitgoldcorp.com
1,921.31m in 10 holes
1,007m Trenches + Access

2. Bluto – Au
1,940.21m in 11 holes
2,004m Trenches/Access
1,730 Soils

3. Nugget – Au + Ag-Pb
1,524.16m DDH
1,363m Trenches
2,553 Soils
IP, VLF-EM and Downhole Geophysical Surveys
>3 km Access Construction
2 3
1
Regional Work

4. VBW-Falcon + Hawk- Au 5. Hawk – Au +Base Metals


2,150 Soil Samples 2,037 Soils
Mapping and Rock Sampling Recon and Assessment
Access Assessment Mapping and Chip Sampling
46
2018 Work Areas – Dublin Gulch

TSX-V: VIT
vitgoldcorp.com
47
Dublin Gulch Infrastructure Upgrades

TSX-V: VIT
Bluto

Mag Low

vitgoldcorp.com
Olive-Shamrock

Nugget
Eagle

Lynx

48
Olive-Shamrock-Spinach

TSX-V: VIT vitgoldcorp.com


Olive-Shamrock-Spinach 2018 Planned/Completed

TSX-V: VIT
2018
Planned • 14.3m of 1.04 g/t Au from 85.3m DG17-866C
DDH • 9.1m of 1.19 g/t Au from 33.5m DG17-862C
• 6.1m of 2.38 g/t Au from 24.4m DG17-860C
• 5.0m of 4.26 g/t Au from 81.9m DG17-857C
• 32.0m of 0.78 g/t Au from 22.9m DG17-853C

vitgoldcorp.com
2016 F.S.

• 2018 DDH Defined Targets Through Updated Resource Review


– Focused on O-S NE - Expanded O-S Mineralized Zone from
2016 Study by ~600m on Strike and Defined Structural Controls

• Increased Confidence Within O-S Deposit

• Preliminary Internal Resource Estimation >25%


Increase to Tonnage
50
Bluto

TSX-V: VIT vitgoldcorp.com


Bluto 2018 Planned and Executed Program
Pervasive

TSX-V: VIT
Sericitization
with Later
Silicification

vitgoldcorp.com
Folioform
Arsenopyrite
Within Clear
Structural
2018 Planned Associations
DDH

• Adjusted Program After First Hole (Epithermal


Signatures and Dominant Structural Controls)

• Targeted Gold+Base Metals Anomalous Zone Neglected


in 2017 After Initial 2018 Trenches

• Have Tested ~600m of New Strike Length

• Visible Gold and Extensive Associated Arsenopyrite


Mineralization

52
Bluto 2018 – Drill and Trench Program

TSX-V: VIT
vitgoldcorp.com
14 m at 4.87 g/t Au from 86 to 100 metres

53
2018 Dublin Gulch Soils Geochemical Programs

TSX-V: VIT
vitgoldcorp.com
54
2018 Dublin Gulch Soils Geochemical Results
As

TSX-V: VIT
vitgoldcorp.com
Au

55
Nugget

TSX-V: VIT vitgoldcorp.com

Nugget

Eagle

VBW
2017 LiDAR and Structural Interpretation

TSX-V: VIT
Outcropping
Silver-Galena
Veins

vitgoldcorp.com
Mag Anomalies

Nugget
Stock

57
Nugget – 2018 Exploration – DDH + Trenches

TSX-V: VIT
vitgoldcorp.com
NG18-001C

NG18-002C
NG18-003C

NG18-004C VG
NG18-005C

NG18-007C
NG18-006C

NG18-008C
Nugget – 2018 Exploration – Updated Geology Map

TSX-V: VIT
vitgoldcorp.com
Nugget – 2018 Exploration – DG18-006C

TSX-V: VIT
vitgoldcorp.com
A’

A Looking West A’
Hole ID From (m) To (m) Length (m) Gold (g/t) Silver (g/t) NOTES
NG18- Entire
006C 3.4 207.6 204.2 0.32 1.44 Hole
From
including 3.4 104.9 101.5 0.57 2.27
surface
and with 39.6 41.0 1.4 9.60 48
and
61.8 94.8 33.0 1.03 3.46
including
with 61.8 78.0 16.2 1.76 1.54
or 61.8 71.9 10.1 2.79 8.6
including 61.8 63.0 1.1 12.10 28.8
and 93.8 104.9 11.1 0.64 2.57
including 93.8 94.8 1.0 4.95 22.0
and
180.1 191.3 11.2 0.49 4.91
including
with 180.1 180.9 0.8 4.43 35.1
Nugget As-In-Soils Results

TSX-V: VIT
vitgoldcorp.com
61
Nugget As-In-Soils Results

TSX-V: VIT
vitgoldcorp.com
62
Nugget Au-In-Soils Results

TSX-V: VIT
vitgoldcorp.com
63
Nugget Au-In-Soils Results

TSX-V: VIT
vitgoldcorp.com
64
Falcon

TSX-V: VIT vitgoldcorp.com


Falcon Target

TSX-V: VIT
SUMMARY

Hosted within Tombstone Suite granodiorite and


tourmaline-altered Hyland Group sediments.

vitgoldcorp.com
EPH

South-west extension of Potato Hills Trend

5km long gold-in-soil anomaly of 40-1017 ppb

2013 Drilling first results:


59.2m @ 0.58 g/t Au
Including 14m @ 0.98 g/t Au

Au Soil Anomaly

66
VBW 2017 Soils Grids on 2017 Airborne Magnetics

TSX-V: VIT
vitgoldcorp.com
67
All Soils Grids Results: Gold-in-soils

TSX-V: VIT
vitgoldcorp.com
68
Hawk Recon Program

TSX-V: VIT vitgoldcorp.com


70

TSX-V: VIT vitgoldcorp.com


~30km
Location Map
Hawk Target
• 900 claims covering 180km2 located

TSX-V: VIT
approximately 30km north of the Dublin Gulch
claim block.
• Gossanous outcrops along a 12 km NW trend.

vitgoldcorp.com
• Identified from newly available satellite imagery
(2015).
• Geochemical data indicate anomalous gold and
base metal responses in the creeks that drain the
area.
• Potential for gold-bearing stratabound,
structurally-controlled Carbonate Replacement
(Tiger Deposit), Manto Style (Ocelot Showing), or
structurally hosted vein-fault (McKay Hill)
mineralization.
• 2018 YMEP funding for $40k

71
72

TSX-V: VIT vitgoldcorp.com


Hawk Geology
Hawk 2018 Ridge and Spur Soils - As

TSX-V: VIT
vitgoldcorp.com
73
Hawk 2018 Ridge and Spur Soils - Au

TSX-V: VIT
vitgoldcorp.com
74
Structural Evolution

TSX-V: VIT vitgoldcorp.com


Structural Evolution Summary

TSX-V: VIT
1. Thrusting (NW directed)
Intrusive uplift and emplacement
(Wolf Tungsten,

vitgoldcorp.com
Bluto camp IRGS style of mineralization)
2. Normal Faulting NE directed)
Shamrock
3. Shallow Angle detachments (NW directed)
Wolf
Olive
4. Normal Faulting E directed)
5. Dilation Jog (WSW directed
extension), subvolcanic intrusions.
alkalic epithermal style of
Eagle
mineralization
6. Listric faults (SSE directed)
(reactivation of Thrust faults as normal faults)
Reactivated stacked thrust
faults as normal faults

Reactivated thrust fault as detachment fault

76
Structural Movement

TSX-V: VIT
vitgoldcorp.com
Bluto
Potato Hills Wolf

Shamrock
Olive
Eagle Mine

77
Structural Evolution

TSX-V: VIT
Thrusting (NW directed)
Intrusive uplift and emplacement
(IRGS style of mineralization)

vitgoldcorp.com
Eagle Mine
Normal Faulting NE directed)
Shallow Angle detachments (NW directed) Wolf

Normal Faulting E directed)


Olive-Shamrock
Dilation Jog (WSW directed extension),
subvolcanic intrusions.
alkalic epithermal style of mineralization Bluto

Listric faults (SSE directed)


(reactivation of Thrust faults as normal faults)

78
Structural Reconstruction

TSX-V: VIT vitgoldcorp.com

79
Dublin Gulch Structural Analysis

TSX-V: VIT
Reconstruction

Olive-Shamrock

vitgoldcorp.com
Eagle Mine
Wolf
Tungsten

Resistivity 200K

Olive-Shamrock Shamrock
Olive
Eagle Mine
Wolf
Wolf
Tungsten

Eagle

Resistivity 200K Resistivity 200K

80
Structural Reconstruction

TSX-V: VIT
Reconstruction
AFTER RECONSTRUCTION…

vitgoldcorp.com
Olive-Shamrock are a continuous deposit

“Olive can extend to Eagle West (known


mineralization in between)
Eagle can be extended to the North East under
the down faulted eastern block as a blind “near
surface” target

Where is the top of the Eagle?


Eroded or transposed?
Resistivity 200K

81
Detachment Evidence

TSX-V: VIT
vitgoldcorp.com
Upper block displaced northwesterly

Eagle Olive Shamrock

Wolf

Flattened surfaces (sliding planes) at mountain tops Bluto


exposing the basal detachment planes.

82
New Eagle Target

TSX-V: VIT
Resistivity 200K

Placer
X

vitgoldcorp.com
mine

Placer
mine

X
Slide block with 90 degree counter
clockwise rotation
Same resistivity signature as the other
block matching same position
Same basement folding axis closure and direction

Possible granodiorite-schist contact


Placer mine operations on all area drainages

No Modern Gold Exploration in this area


83