0% found this document useful (0 votes)
46 views

Decision Tree

The document discusses expanding a small plant or building a large plant based on projected demand. A small plant expansion would cost $1.5 million but could only produce up to 300,000 units, while a large plant costs $2 million but can produce up to 600,000 units. There is a 70% chance of high demand requiring the larger capacity and a 30% chance of low demand where the smaller plant would be sufficient.

Uploaded by

Usmän Mïrżä
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views

Decision Tree

The document discusses expanding a small plant or building a large plant based on projected demand. A small plant expansion would cost $1.5 million but could only produce up to 300,000 units, while a large plant costs $2 million but can produce up to 600,000 units. There is a 70% chance of high demand requiring the larger capacity and a 30% chance of low demand where the smaller plant would be sufficient.

Uploaded by

Usmän Mïrżä
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

300,000

High Demand
70%

70% 600,000

Small Plant
Expansion Cost 1.5M
Cost 2 M

Low Demand 30% 150,000

30%
500,000 100,000
High Demand
70%
Large Plant
Cost 2 M

Low Demand 30%


100,000

Do Not Expanded