0% found this document useful (0 votes)
587 views

Critical Flange Make-Up Checklist (Empty)

This form document contains fields for date, name, notes, model information, and signature. It relates to piping inspection with references to specific components C1 through C8 and CJ-4 through CJ-7. The inspector has signed off after reviewing the noted piping system components.

Uploaded by

Jorge Garcia
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
587 views

Critical Flange Make-Up Checklist (Empty)

This form document contains fields for date, name, notes, model information, and signature. It relates to piping inspection with references to specific components C1 through C8 and CJ-4 through CJ-7. The inspector has signed off after reviewing the noted piping system components.

Uploaded by

Jorge Garcia
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

9

8
7
6
5
4
3
2
1

20
19
18
17
16
15
14
13
12
11
10

DATE
NAME
NOTES:
MODEL :

SERIAL No :

BGC-FORM NO. 11
SIGNATURE
: See Piping
C8
C7
C6
C5
C4
C3
C2
C1
CJ-7
CJ-6
CJ-5
CJ-4
CJ-3
CJ-2
CJ-1
SYSTEM NO:

REFER TO Nº 
CRITICAL JOINT

COMPLETED BY
DATE OF CALIBRATION:

Procedure
TORQUE WRENCH DETAILS
IS GASKET SURFACE IN GOOD
CONDITION? 

Engineering with reference drawing.


IS GASKET SURFACE CLEAN? 

: To fill in Y (YES) or N (No) or N/A

: See Contractor Method Statement


FLANGE

IS FLANGE ALIGNMENT WITHIN TOLERABLE


TESTPACK NO:
MAIN PID NO:

: Critical Joint Nº shall be defined by BGC


LIMITS? 
IS THE GASKET NEW? 

IS IT CORRECT TYPE OF GASKET? 

COMMENTS:
IS IT CORRECT SIZE OF GASKET? 
GASKET

SAJER
IS IT CORRECT RATING OF GASKET? 
IS THE BOLT PROTRUSION WITHIN
REQUIREMENTS? 
ARE THE THREADS LUBRICATED?

ARE THE BOLTS OF CORRECT SIZE? 


BOLTING
CHECKLIST

ARE THE BOLTS/ NUTS CORRECT TYPE OF


MATERIAL? 
CONTRACTOR FLANGE QA CHECK

ARE THE BOLTS TIGHTENED IN CORRECT


Zubair Rental Compressor

SEQUENCE? 
CONTRACT NO:

IS CONTROLLED TORQUE TIGHTENING


REQUIRED? 
STATE INITIAL TORQUE/ BOLT TENSION
CRITICAL JOINT – FLANGE MAKE-UP

VALUE 
TORQUE

STATE INTERMEDIATE TORQUE/ BOLT


TENSION VALUE 
STATE FINAL TORQUE/BOLT TENSION
VALUE 
IS HYDRAULIC TORQUE REQUIRED AND IS
LOCAT:

THE REPORT AVAILABLE? 

BGC
ARE THE BOLTS/ NUTS CORRECT TYPE OF
MATERIAL? 
PAGE :

ARE THE THREADS LUBRICATED?


IS THE BOLT PROTRUSION WITHIN
REQUIREMENTS? 
OF

FLANGE TORQUE CHECK 


BGC FLANGE QA CHECK
BGC MECH. SUPERVISOR

BGC INITIAL