Comments On M.Asghar Appraised
Comments On M.Asghar Appraised
Follow your SO and SOC target compliance. Also ensure SO/SOC target compliance by your shift
operators.
Ensure that Operations and HSSE Trainings are being conducted as per target.
Ensure that the integrum action items are being closed timely, as this seems to be grey area, which need
more attention.
Ensure that Junaid is being trained on DCS as fully independent DCS operator and can handle
Emergencies , start up and shutdown of plant and equipments. He should be fully aware of his
responsibilities and get his skill certification done.
E & I Gap Shutdown preparation and planning to be done to ensure completion of all the jobs safely and
on-time.
Prepare, plan for execution of ME-05 tie-ins within time and safely. Ensure that during ME-05 SAT, ME-05
HMIs are developed as per requirement, while C & E and loop testing is done.
Ensure that the NLC and SFS Contractor SO and SOC compliance is fully met and also Contractor KPI are
being made and issued to HSSE on monthly basis.
Ensure that Plant , Well Area log sheets and start up check list and being updated and revised on time.
Ensure that un-planned losses are reduced. Ensure that lube oil and chemical consumption file is
updated on daily basis, whenever any new item is issued from the warehouse.
Maintain and update the plant equipment and machines alarms and trip set point list.