Name of Work : C/o 1811 DU’s ( 947 HIG, 504 MIG and 360 LIG) including internal & external development complete in Sector-18B,
Dwarka, Phase-II, New Delhi.
Sub Head :- Repair & strengthening of RCC Structural members in existing block and basements at the work “C/o 490 HIG Dwelling Units
including internal external development complete in Sector 18B, Pkt. - I, Dwarka, Ph.-II, New Delhi. R/f M/s Villayati Ram Mittal.
Sl. No. Description of Item Unit Qty. Rate (Rs.) Rate in words (Amount in Rs.)
1 Providing and fixing of strong temporary structural support sysem (double
scaffolding system (cup lock type) up to story height made with minimum 40mm
dia MS clamps and MS staircase system) to relieve loads from structural RCC
elements to be repaired/strengthened and for workig platform etc. including
providing safety nets and barricading of the area for safety measures and
mainting it in a serviceable condition for the required duration as approved and
dismantling and removing it there after. The scaffodling system shall bestiffened
with bracings, runners, connection with the building etc. wherever required for
inspectino of work at required locations with essential safety features for the Sqm 1390.00
workmen etc. inclusive of all labour, materials etc. complete as per directions and
approval of Engineer-in-Charge (The elevational area of the scaffolding shall be
measured for payment purpose. The payment will be made once irrespective of
duration of scaffolding).
3 Providing and applying alkaline rust converter over the exposed old reinforcement
as per manufacturers specification and
Page 1
Sl. No. Description of Item Unit Qty. Rate (Rs.) Rate in words (Amount in Rs.)
4 Supplying and providing reinforcement, thermo-mechanically treated bars (Fe-
500) conforming to IS:1786 including initial straightening of coiled/uncoiled bars,
removal of loose rust, cutting, bending to correct size & shape, binding with wire
at each intersection and placing in any position, at all height and depth inclusive Kg. 4610.00
of all labour, materials, equipment etc. complete as per specifications and
instruction of Engineer-in-Charge.
6 Centering & shuttering including proping etc and removal of formwork for beams,
columns, staircases, roof, slabs etc.
Sqm 626.00
8 Providing and applying latex bond coat meeting ASTM-C-1059 Type I (Dry
condition) of Type-II (Wet condition) as per detailed specification on the surface
to be encased with micro concreate. Sqm 536.00
9 (a) Providing, laying, compacting and curing M-30 grade structural grade
concrete as per design mix using Ordinary Portland Cement (43 Grade)as per IS
8112 with Minimum cement content of 400 Kg per cum and nominal maximum
size of 20 mm and having slump of 45 mm with a maximum water/cement ratio of
0.4, excluding the cost of centering & Shuttering, finishing, reinforcement. (b)
Addition of Styrene Butadiene Resin (SBR) latex with 10% by weight of cement
with dry latex solids content in latex varying from 30-40% mixture as per ACI- cum 94.00
548.3R-95. Proper curing to be done for the concrete work. Gunny bags may be
used for effective curing to protect the evaporation water.
Page 2
Sl. No. Description of Item Unit Qty. Rate (Rs.) Rate in words (Amount in Rs.)
10 Strengthening column beam juction with non metalic composite fiber wrapping
system comprise of undirectional glass fiber sheet (90 GSM) and compatible
saturant, by dry layup system including,Surface preparation :- Grinding/moulding
concrete substrate, cleaning it with wire brush removing oil, laitance if present,
rounding shartp edges to min 25mm radius etc. complete.Profilling :- Applying
compatible primer on prepared sustrate, filling the holes and uneven surface with
thixotropic putty etc. complete.
Wrapping :- Wrapping the fiber sheet to structural element at desired orientation Sqm 1120.00
using tamping roller to avoid any air voids etc.
Sand pasting :- Applying second coat of saturant after 12 hrs, rectify air voids if
any paste the river sand on it to make surface rough to take any further finishes.
12 Providing and applying protective coating to internal and external surface with
contractor's supply of aliphatic acrylate, solvented, elastomeric coating sytem in
two coat after silane siloxane primer coat as per the manufacturers specification
including priming coat, intermediate coat and top coat with paints from approved
firms after surface preparation i.e. cleaning the surface free of loose
Sqm 5620.00
particles/deposites and with contractor's labour, materials, equipments staging
etc. complete and as directed by the Engineer In Charge. Total Dry Film
Thickness will be 150 microns
Page 3
Sl. No. Description of Item Unit Qty. Rate (Rs.) Rate in words (Amount in Rs.)
14 Earth work in excavation of foundation (not exceeding 15 sqm in width and 10
sqm in plan) including getting out the excavated soil and disposal of surplus
excavated soil as directed by Engineer In Charge. Sqm 133.00
15 Filling excavated earth (excluding rock) in trenches, plint & sides of foundation in
layers not exceeding 20 cm in depth compacting each deposited layer by
ramming and watering, lead upto 50 mtrs. and lift upto 1.5m. Sqm 133.00
Note:- Nothing extra shall be paid for the products to be used for repairs etc. in the respective items as given in the schedule as per ASTM specification shown at page.97.
Page 4
SCHEDULE OF QUANTITIES
Name of Work : C/o 1811 DU’s ( 947 HIG, 504 MIG and 360 LIG) including internal & external development complete in Sector-18B,
Dwarka, Phase-II, New Delhi.
Sub Head :- Repair & strengthening of RCC Structural members in existing block and basements at the work “C/o 490 HIG Dwelling Units
including internal external development complete in Sector 18B, Pkt. - I, Dwarka, Ph.-II, New Delhi. R/f M/s Villayati Ram Mittal.
Sl. No. Description of Item Unit Qty. Rate (Rs.) Rate in words (Amount in Rs.)
1 Providing and fixing of strong temporary structural support sysem (double
scaffolding system (cup lock type) up to story height made with minimum 40mm
dia MS clamps and MS staircase system) to relieve loads from structural RCC
elements to be repaired/strengthened and for workig platform etc. including
providing safety nets and barricading of the area for safety measures and
mainting it in a serviceable condition for the required duration as approved and
dismantling and removing it there after. The scaffodling system shall bestiffened
with bracings, runners, connection with the building etc. wherever required for
inspectino of work at required locations with essential safety features for the Sqm 1390.00
workmen etc. inclusive of all labour, materials etc. complete as per directions and
approval of Engineer-in-Charge (The elevational area of the scaffolding shall be
measured for payment purpose. The payment will be made once irrespective of
duration of scaffolding).
3 Providing and applying alkaline rust converter over the exposed old reinforcement
as per manufacturers specification and
Page 5
Sl. No. Description of Item Unit Qty. Rate (Rs.) Rate in words (Amount in Rs.)
4 Supplying and providing reinforcement, thermo-mechanically treated bars (Fe-
500) conforming to IS:1786 including initial straightening of coiled/uncoiled bars,
removal of loose rust, cutting, bending to correct size & shape, binding with wire
at each intersection and placing in any position, at all height and depth inclusive Kg. 4610.00
of all labour, materials, equipment etc. complete as per specifications and
instruction of Engineer-in-Charge.
6 Centering & shuttering including proping etc and removal of formwork for beams,
columns, staircases, roof, slabs etc.
Sqm 626.00
8 Providing and applying latex bond coat meeting ASTM-C-1059 Type I (Dry
condition) of Type-II (Wet condition) as per detailed specification on the surface
to be encased with micro concreate. Sqm 536.00
9 (a) Providing, laying, compacting and curing M-30 grade structural grade
concrete as per design mix using Ordinary Portland Cement (43 Grade)as per IS
8112 with Minimum cement content of 400 Kg per cum and nominal maximum
size of 20 mm and having slump of 45 mm with a maximum water/cement ratio of
0.4, excluding the cost of centering & Shuttering, finishing, reinforcement. (b)
Addition of Styrene Butadiene Resin (SBR) latex with 10% by weight of cement
with dry latex solids content in latex varying from 30-40% mixture as per ACI- cum 94.00
548.3R-95. Proper curing to be done for the concrete work. Gunny bags may be
used for effective curing to protect the evaporation water.
Page 6
Sl. No. Description of Item Unit Qty. Rate (Rs.) Rate in words (Amount in Rs.)
10 Strengthening column beam juction with non metalic composite fiber wrapping
system comprise of undirectional glass fiber sheet (90 GSM) and compatible
saturant, by dry layup system including,Surface preparation :- Grinding/moulding
concrete substrate, cleaning it with wire brush removing oil, laitance if present,
rounding shartp edges to min 25mm radius etc. complete.Profilling :- Applying
compatible primer on prepared sustrate, filling the holes and uneven surface with
thixotropic putty etc. complete.
Wrapping :- Wrapping the fiber sheet to structural element at desired orientation Sqm 1120.00
using tamping roller to avoid any air voids etc.
Sand pasting :- Applying second coat of saturant after 12 hrs, rectify air voids if
any paste the river sand on it to make surface rough to take any further finishes.
12 Providing and applying protective coating to internal and external surface with
contractor's supply of aliphatic acrylate, solvented, elastomeric coating sytem in
two coat after silane siloxane primer coat as per the manufacturers specification
including priming coat, intermediate coat and top coat with paints from approved
firms after surface preparation i.e. cleaning the surface free of loose
Sqm 5620.00
particles/deposites and with contractor's labour, materials, equipments staging
etc. complete and as directed by the Engineer In Charge. Total Dry Film
Thickness will be 150 microns
Page 7
Sl. No. Description of Item Unit Qty. Rate (Rs.) Rate in words (Amount in Rs.)
14 Earth work in excavation of foundation (not exceeding 15 sqm in width and 10
sqm in plan) including getting out the excavated soil and disposal of surplus
excavated soil as directed by Engineer In Charge. Sqm 133.00
15 Filling excavated earth (excluding rock) in trenches, plint & sides of foundation in
layers not exceeding 20 cm in depth compacting each deposited layer by
ramming and watering, lead upto 50 mtrs. and lift upto 1.5m. Sqm 133.00
Add 3% contengencies
Total
The Estimate is hereby technically sactioned for Rs. 2,02,91,555/- (Rs.Two Crore Two Lacs ninety one Thousand Five Hundred Fjfty five only)
Page 8
ANALYSIS OF RATES
(Based on DSR 1997)
1 Providing and fixing of strong temporary structural support sysem (double
scaffolding system (cup lock type) up to story height made with minimum 40mm dia
MS clamps and MS staircase system) to relieve loads from structural RCC elements to
be repaired/strengthened and for workig platform etc. including providing safety nets
and barricading of the area for safety measures and mainting it in a serviceable
condition for the required duration as approved and dismantling and removing it there
after. The scaffodling system shall bestiffened with bracings, runners, connection
with the building etc. wherever required for inspectino of work at required locations
with essential safety features for the workmen etc. inclusive of all labour, materials
etc. complete as per directions and approval of Engineer-in-Charge (The elevational
area of the scaffolding shall be measured for payment purpose. The payment will be
made once irrespective of duration of scaffolding).
TOTAL 20.30
Say 20.30
ANALYSIS OF RATES
(Based on DSR 1997)
5 Drilling holes of 13 mm dia into concrete at 100 mm c/c as desired to required depth,
cleaning the holes, fixing flexible Teflon nozzle for grouting purpose, sealing the gap
around the nozzle with PMM as per detailed specification
Providing and injecting Low viscosity epoxy grout as per standard procedure meeting
the specification of ACI 503R-93
6 Centering & shuttering including proping etc and removal of formwork for beams,
columns, staircases, roof, slabs etc.
Rate as per Item No. 5.14.6/P-91/DSR 1997 Sqm 1.00 130.65 130.65
130.65
Say 130.65 per Sqm.
ANALYSIS OF RATES
(Based on DSR 1997)
7 Providing supporting system to distress the area around the columns to be repaired
with steel structural members/jack system complete.
Detail of cost for 10 Nos. of Props.
Code Description Unit Quantity Rate Amount
Materials :-
7343/ Adjustable telescopic props 3 mtr. (2.02-3.75m) 731.50
Each 10.00 457.19
P-87 (Assuming using one prop 16 times) 16.00
Sundries (Nuts & Bolts) L.S. 100.00
TOTAL 557.19
Add for water charges @ 1% 5.57
TOTAL 562.76
Add for contractor's profit and overheads @15% 84.41
Cost for 10 nos props 647.17
Cost for 1 no. props 64.72
Say 64.72 Each
ANALYSIS OF RATES
(Based on Market Rate)
3 Providing and applying alkaline rust converter over the exposed old reinforcement as
per manufacturers specification
and
Providing and applying Zinc Rich primer on the exposed old reinforcement by brush
as per detailed specification with interval of 24 hrs between coats. (measured on the