Work Rate Problems YouTube Lecture Handouts
Work Rate Problems YouTube Lecture Handouts
https://www.youtube.com/watch?v=txDUVXzgNQU
9/9/2016
www.doorsteptutor.com 1
9/9/2016
www.doorsteptutor.com 2
www.examrace.com
www.examrace.com www.doorsteptutor.com
These Slides Accompany the YouTube Video Tutorial:
https://www.youtube.com/watch?v=txDUVXzgNQU
Unitary
Method
Races and
Rates
Speeds
Work
Pipes and
Cisterns
9/9/2016
www.doorsteptutor.com 3
Complexity
Direct Inverse
Head Start Combining Rates
Proportion/Variation Proportion/Variation
9/9/2016
www.doorsteptutor.com 4
www.examrace.com
www.examrace.com www.doorsteptutor.com
These Slides Accompany the YouTube Video Tutorial:
https://www.youtube.com/watch?v=txDUVXzgNQU
5 men can do work in 30 days. How many days
it will take for 10 men to do same work.
9/9/2016
www.doorsteptutor.com 5
9/9/2016
www.doorsteptutor.com 6
www.examrace.com
www.examrace.com www.doorsteptutor.com
These Slides Accompany the YouTube Video Tutorial:
https://www.youtube.com/watch?v=txDUVXzgNQU
If 48 men working 5 hours a day can do a
piece of work in 24 days, in how many days
will 36 men working 10 hours a day
complete the same work.
9/9/2016
www.doorsteptutor.com 7
9/9/2016
www.doorsteptutor.com 8
www.examrace.com
www.examrace.com www.doorsteptutor.com
These Slides Accompany the YouTube Video Tutorial:
https://www.youtube.com/watch?v=txDUVXzgNQU
If 48 men working 5 hours a day can till the a
square plot in 24 days, how many men would it
take working 10 hours a day to till a square plot
with twice the length which is twice as hard in
36 days.
9/9/2016
www.doorsteptutor.com 9
9/9/2016
www.doorsteptutor.com 10
www.examrace.com
www.examrace.com www.doorsteptutor.com
These Slides Accompany the YouTube Video Tutorial:
https://www.youtube.com/watch?v=txDUVXzgNQU
11 potters could make 143 pots in 8 days. Now,
a mechanized potters wheel has increased their
efficiency by 100%, how many potters will be
required to make 286 pots in 4 days?
9/9/2016
www.doorsteptutor.com 11
9/9/2016
www.doorsteptutor.com 12
www.examrace.com
www.examrace.com www.doorsteptutor.com
These Slides Accompany the YouTube Video Tutorial:
https://www.youtube.com/watch?v=txDUVXzgNQU
Next 2 Classes- Combining Rates and Head Start
•A and B can do a given work in 12 and 18 days
respectively. They work alternately for equal period
of time. And A started the work. Now, what is the
time taken by A and B to complete the job?
9/9/2016
www.doorsteptutor.com 13
www.examrace.com
www.examrace.com www.doorsteptutor.com