Warehouse 40x12 26x12 26x8 BOQ
Warehouse 40x12 26x12 26x8 BOQ
Construction of San Simon North Hub Warehouse Phase 3; 40m span, Rev. No. :
Project Title :
12 bays Date Prepared :
Location : San Isidro, San Simon, Pampanga Date Required :
Work Description : San Simon Warehouse 3_Structural BOQ Prepared By :
ITEM NO. DESCRIPTION QTY.
Tepered Columns
W14 x 30 Wide Flange ,A36 39
Tepered truss
W14 x 30 Wide Flange ,A36 39
Truss
W14 x 30 Wide Flange ,A36 78
Side Girt (between columns)
W14 x 30 Wide Flange ,A36 26
Rafters beams (Between trusses)
W 6x6x8 Wide Flange,A36 65
Side Bracing (Between Columns staggered)
120mm x 120mm x 12mm x 6m Angle Bar, A36 28
Cross bracings (between trusses)
100mm x 100mm x 10mm x 6m Angle Bar, A36 80
Sag rods
10mm Ø x 6m Round Bar, Plain, A36 312
Purlins
LC160mm x 50mm x 15mm x 2mm x 6m C-Purlins, H 613
Bas Plates & Stiffeners
4' x 8' x 15mm Plate, Mild Steel, A36 4
4' x 8' x 12mm Plate, Mild Steel, A36 2
4' x 8' x 10mm Plate, Mild Steel, A36 45
4' x 8' x 8mm Plate, Mild Steel, A36 3
Rev. No. : 1
Date Prepared : 22-May-20
Date Required : 21-Jun-20
Prepared By : MRH
UNIT REMARKS
lengths
lengths
lengths
lengths
lengths
lengths
lengths
lengths
lengths
sheets
sheets
sheets
sheets
BILL OF QUANTITIES
Construction of San Simon North Hub Warehouse Phase 3; 26m Rev. No. :
Project Title :
span, 12 bays Date Prepared :
Location : San Isidro, San Simon, Pampanga Date Required :
Work Description : San Simon Warehouse 3_Structural BOQ Prepared By :
ITEM NO. DESCRIPTION QTY. UNIT
Tepered Columns
W14 x 61 Wide Flange ,A36 39 lengths
Tepered truss
W14 x 61 Wide Flange ,A36 26 lengths
Truss
W14 x 61 Wide Flange ,A36 26 lengths
Side Girt (between columns)
W 6x6x8 Wide Flange,A36 26 lengths
Rafters beams (Between trusses)
W 6x6x8 Wide Flange,A36 65 lengths
Side Bracing (Between Columns staggered)
120mm x 120mm x 12mm x 6m Angle Bar, A36 28 lengths
Cross bracings (between trusses)
100mm x 100mm x 10mm x 6m Angle Bar, A36 80 lengths
Sag rods
Purlins
LC160mm x 50mm x 15mm x 2mm x 6m C-Purlins, Hot-Dipped,
420 lengths
Galvanized
1
22-May-20
21-Jun-20
MRH
REMARKS
91
37
128
37
BILL OF QUANTITIES
Construction of San Simon North Hub Warehouse Phase 3; 26m Rev. No. :
Project Title :
span, 12 bays Date Prepared :
Location : San Isidro, San Simon, Pampanga Date Required :
Work Description : San Simon Warehouse 3_Structural BOQ Prepared By :
ITEM NO. DESCRIPTION QTY. UNIT
Tepered Columns
W14 x 61 Wide Flange ,A36 24 lengths
Tepered truss
W14 x 61 Wide Flange ,A36 16 lengths
Truss
W14 X 30 Wide Flang, A36 32 lengths
Side Girt (between columns)
W 6x6x8 Wide Flange,A36 18 lengths
Rafters beams (Between trusses)
W 6x6x8 Wide Flange,A36 45 lengths
Side Bracing (Between Columns staggered)
120mm x 120mm x 12mm x 6m Angle Bar, A36 16 lengths
Cross bracings (between trusses)
100mm x 100mm x 10mm x 6m Angle Bar, A36 48 lengths
Sag rods
Purlins
LC160mm x 50mm x 15mm x 2mm x 6m C-Purlins, Hot-Dipped,
280 lengths
Galvanized
1
22-May-20
21-Jun-20
MRH
REMARKS