0% found this document useful (0 votes)
1K views4 pages

Acrel Meter Installation Three Phase

This document provides instructions for installing a three-phase smart meter. It describes the meter's features, notes its compatibility, and details the wiring process in 3 steps.

Uploaded by

hardani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views4 pages

Acrel Meter Installation Three Phase

This document provides instructions for installing a three-phase smart meter. It describes the meter's features, notes its compatibility, and details the wiring process in 3 steps.

Uploaded by

hardani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

01 INTRODUCTION

Acrel Smart Meter is designed with high precision


Acrel Three phase Meter Installation small dimensions, convenient operation and
Model: ACR10R-D10TE4/C45 installation.
It is available for both single-phase and three-phase
grid system connection to detect voltage, current,
power and energy.
Any fault or damage caused by misoperation or
disobeyal against the rules on manual is beyond
Acrel warrenty cover range.

NOTE:
Only suitable for RS485 cable connection on
RJ45 port of sermatec hybrid inverters.

02 INSTALLATION

03 WIRING FOR THREE-PHASE METER (Model: ACR10R-D10TE4/C45)

L1
L2
L3

N
Fuse Fuse Main Meter
RS485

0.5A 3A

1 2 3 4 13 12

L(+) N(-)
S2 (Black)

S1(White)

FN Set

Rs485 L1 L2 L3 N
5 6 7 8 9 10 21 22 23

S2(Black)

RS485 S1(White)
S2

S1
S2

S1

(1)Make sure AC cable is totally isolated from AC power before connecting Meter and CT.

(2)Incorrect connection or direction will cause incorrect data.


01 INTRODUCTION

Eastron Three-phase Meter Installation Eastron Smart Meter is designed with high precision
Model: SDM630MCT V2 small dimensions, convenient operation and
installation.
It is available for both single-phase and three-phase
grid system connection to detect voltage, current,
power and energy.
Any fault or damage caused by misoperation or
disobeyal against the rules on manual is beyond
Eastron warrenty cover range.

NOTE:
Only suitable for RS485 cable connection on
RJ45 port of sermatec hybrid inverters.

02 INSTALLATION

03 WIRING FOR THREE-PHASE METER (Model: SDM630MCT V2)

L1
L2
L3

N
S2 (Black) Main Meter
RS485

S1(White)
S2
S1
RS485 Rs485A S2
Rs485B
S1
S2 (Black)
9 10 11 12 13 14 15 16 17 18 19 20

L1 L2 L3 N
S0 Rs485 Current Inputs
S1 (White)

1 2 3 4 5 6 7 8

Voltage Inputs L N L N

N L3 L2 L1 LA NA
1A FAST
BLOW FUSE

(1)Make sure AC cable is totally isolated from AC power before connecting Meter and CT.

(2)Incorrect connection or direction will cause incorrect data.


01 INTRODUCTION

Eastron Three-phase Meter Installation Eastron Smart Meter is designed with high precision
Model: SDM630 MODBUS V2 small dimensions, convenient operation and
installation.
It is available for both single-phase and three-phase
grid system connection to detect voltage, current,
power and energy.
Any fault or damage caused by misoperation or
disobeyal against the rules on manual is beyond
Eastron warrenty cover range.

NOTE:
Only suitable for RS485 cable connection on
RJ45 port of sermatec hybrid inverters.

02 INSTALLATION

03 WIRING
WIRINGFOR
FORTHREE-PHASE
THREE-PHASEMETER
METER (Model: SDM630 MODBUS V2)

L1
L2
L3

N
Main Meter
RS485

L1 L2 L3 N

1 2 3 4
B- A+ G - + - +

RS485 Rs485A

Rs485B

5 6 7 8

L1 L2 L3 N

(1)Make sure AC cable is totally isolated from AC power before connecting Meter and CT.

(2)Incorrect connection or direction will cause incorrect data.

You might also like