Sl. No. Design Specification Myanmar Standards: TH ST
Sl. No. Design Specification Myanmar Standards: TH ST
Report including Schedules Approaches on Tamu – Kyigone – Kalewa Road Section from km 0.00 to km 149.70 in Myanmar
Sl. Myanmar
Design Specification
No. Standards
b) Rolling Country 40
c) Mountainous Country 36
Earth Slope
a) Flat or Rolling Country 2:1
b) Mountainous Country
7
i) Cut height - 0-4 feet 2:1
ii) Cut height - 4-20 feet 13/4:1
iii) Cut height - Over 20 feet 11/2:1
Maximum Grades (%)
a) Flat Country 3
8
b) Rolling Country 4
c) Mountainous Country 6
9 Maximum Superelevation 10
26 (min.)
10 Bridges:- kerb to Kerb Width (feet)
30 (desirable)
11 Width of Culverts Full Shoulder Width
The geometric standard as given in IRC:SP:73-2007 will be followed. The cross section for major/
minor bridges coming over project road will be as per MORTH notification on “Width of bridges
on 2 lane National Highways (with and without Footpath) letter No. RW/NH/33044/2/88-
S&R(B) dated 24th March 2009 and “Width of bridges on 2 lane National Highways on Hills
(with and without Footpath) letter no. RW/NH/33044/2/88-S&R(B) dated 21st Oct 2009 and
IRC:SP:73-2007 are as under:-
i) Bridge Section 1- Two lane carriageway with footpath in Plain and Rolling Terrain
ii) Bridge Section 2-Two lane carriageway without footpath in Plain and Rolling Terrain
iii) Bridge Section 3-Two lane carriageway without footpath in Hill Terrain
iv) TCS-1 : 2-lane Bridge approaches – Both side fill slope (Plain and Rolling Terrain)
v) TCS-1A : 2-lane Bridge approaches – Both side fill slope (New Alignment)
vi) TCS-2 : 2-lane Bridge approaches – Both side cut slope (Plain and Rolling Terrain)
vii) TCS-3 : 2-lane Bridge approaches – Both side fill slope (Hilly Terrain)
viii) TCS-4 : 2-lane Bridge approaches – Left side cut and right side fill slope (Hilly Terrain)