3. Please select the correct order of the steps involved in Product-Consumption Cycle.
1. Consumption 2. Production 3. Recovery 4. Distribution
Select the correct alternative:
a) 2,4,1,3
b) 1,2,3,4
c) 4,2,3,1
d) 3,2,4,1
Ans. a) 2,4,1,3
7. In Mass Production, the manufacturing system is generally designed for the production of a
single type of product.
a) True
b) False
Ans. a) True
8. A phone manufacturing company finalizes a phone model A and decides to manufacture that
phone. Then at a particular date, it launches the phone in the market. In the beginning days,
the sale of that phone was not good enough to meet the break-even of the company but as it
gained some good words in the market, its sale gets increased exponentially. After a certain
period, the same company launches another phone model B in the market and the sales of
the previous model A starts getting decreased.
What can you infer from the above statement?
a) The model A of the company has reached its growth stage.
b) The model A of the company has reached its decline stage.
c) The model B of the company may attain its growth stage after some time.
d) Both option 2 and option 3
Ans. d) Both option 2 and option 3
9. Which of the following is(are) the major activities in Design for Manufacturing?
a) Quality Expectations
b) Production
c) Prototype Development
d) All of these
Ans. d) All of these