Designation Activity Quantity Units Productivity Rates Duration (Days)
The document outlines 17 activities for construction project including clearing, excavation, fabrication of reinforcements, pouring of concrete, laying of bricks, plastering, installation of formworks, trusses, roofs, ceilings and other finishing works. It provides the quantity of materials and units required for each activity along with the expected productivity rates and duration of each task.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
35 views
Designation Activity Quantity Units Productivity Rates Duration (Days)
The document outlines 17 activities for construction project including clearing, excavation, fabrication of reinforcements, pouring of concrete, laying of bricks, plastering, installation of formworks, trusses, roofs, ceilings and other finishing works. It provides the quantity of materials and units required for each activity along with the expected productivity rates and duration of each task.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Designation Activity Quantity Units Productivity Rates Duration (days)
A Clearing & Grubbing 200 m² 0.03 MH/m² (manual clearing)
B Footing excavation 30.24 m³ 0.5 mh/m³ (machine) C Fabrication of Footing Reinf. 40 pcs (d16) 0.07 MH/kg D Footing concrete pouring 5.04 m³ 4 MH/m³ E Fabrication of Grade Beam Reinf. 52 pcs (d12) 0.1 MH/kg F Installation of Formworks for Grade beam 60.32 m² 0.66 MH/m² G grade beam concrete pouring 5.028 m³ 4 MH/m³ H Disassembling of formworks of Grade beam 66.42 m² 0.23 MH/m² I Fabrication of column Reinf. 85 pcs (d16) 0.1 MH/kg J installation of formworks for column 88.2 m² 0.66 MH/m² K column concrete pouring 5.67 m³ 4 MH/m³ L Disassembling of formworks of column 88.2 m² 0.23 MH/m² M Fabrication of slab rsb 435 pcs (d10) 0.1 MH/kg N concrete pouring on slab 15.2 m³ 4 MH/m³ O Excavation for septic tank 12 m³ 0.5 mh/m³ (machine) P Laying of chb wall (septic tank) 22.8 m² 10 m²/day Q plastering of chb (septic tank) 11.4 m² 10 m²/day R concrete pouring for septic tank top cover 0.75 m³ 4 MH/m³ S Fabrication for Roof beam rsb 36 pcs (d12) 0.1 MH/kg T Installation of formworks for roof beam 66.42 m² 0.66 MH/m² U conrete pouring of roof beam 4.428 m³ 4 MH/m³ V disassembling of formworks 66.42 m² 0.23 MH/m² W laying chb walls 159.34 m² 10 m²/day X palstering of chb walls 299.68 m² 10 m²/day Y truss fabrication 250 bf 0.35 MH/B.F. Z roof installation 250 bf 0.8 MH/B.F. AA purlins & roofing installation 145.2 m² 0.27 MH/m² AB installation of ceilings& framework 121.6 m² 0.36 MH/m² AC installation of doors & windows 14.7 m² 2.37 MH/m² AD installation of wooden partitions 13.14 m² 3.44 MH/m² AE installation of floor tiles 121.6 m² 0.55 MH/m² AF paint works 311.88 m² 0.24 MH/m²