100% found this document useful (2 votes)
3K views

Project Billboard

The document provides details for a construction project billboard, including dimensions for the billboard, location of the project, implementing agency, contractor/supplier, brief description of project, project details like target completion date and percentage completed, source of funding, and contact information for any concerns or complaints about the project. Key information on the project like location, description, status, and funding source are to be included on the billboard.

Uploaded by

abigail
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
3K views

Project Billboard

The document provides details for a construction project billboard, including dimensions for the billboard, location of the project, implementing agency, contractor/supplier, brief description of project, project details like target completion date and percentage completed, source of funding, and contact information for any concerns or complaints about the project. Key information on the project like location, description, status, and funding source are to be included on the billboard.

Uploaded by

abigail
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT BILLBOARD DETAILS

NOTE: 2400 (8 ft.)

FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT ASSISTANCE FUND, DEPED / DA / DAR BUDGET,
CALAMITY FUND, MVUC FUND, ETC.
2440mm (8 ft)
COMMISSION ON AUDIT
MISAMIS OCCIDENTAL

WHITE
BACKGROUND
BLACK TEXT
PROJECT: COST:
FUND SOURCE:
CONSTRUCTION OF (Name of Project and Location)
CONTRACTOR : LOCATION:
DATE STARTED :
CONTRACT COMPLETION DATE : HELVETICA
3''
IMPLEMENTING AGENCY:
1220 mm( 4 ft.)

CONTRACT COST :
DEVELOPMENT PARTNER:
IMPLEMENTING OFFICE/CONTRACT No. : 2400 (8 ft.)
CONTRACTOR/SUPPLIER:
SOURCE OF FUND :
BRIEF DESCRIPTION OF PROJECT:

PROJECT DETAILS:
DEPARTMENT OF
PUBLIC WORKS AND HIGHWAYS PROJECT DATE PROJECT STATUS
DATE COMPLETED REMARKS
TARGET DATE OF PERCENTAGE OF AS OF (DATE) COST INCURRED TO DATE
TEXT 2920 or call (02) 165-02 for any concern on this project DURATION STARTED
COMPLETION COMPLETION

www.dpwh.gov.ph HELVETICA
1''

SCALE : 1 : 10 M NOTE:

FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT FOR PARTICULARS OR COMPLAINTS ABOUT THIS PROJECT, PLEASE CONTACT THE REGIONAL OFFICE OR CLUSTER WHICH HAS AUDIT JURISDICTION ON THIS PROJECT
ASSISTANCE FUND, DEPED / DA / DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC HELVETICA COA REGIONAL OFFICE No/CLUSTER:
" Color Shade Combination for the yellow Background: 1'' ADDRESS:
CONTACT NO: OR TEXT COA CITIZENS DESK AT 0915-539-1967

CYAN : 0
MAGENTA : 7
YELLOW : 78 TYPICAL FRAME ELEVATION FRONT ELEVATION
KEY : 0
50 X 50 HORIZONTAL COCO LUMBER

DISPLAY AREA
(TARPAULINE ON 2400 X 2400 X 12 MARINE PLYWOOD)
DISPLAU AREA
DISPLAY AREA 1.20 2.40
1.20 (1200 X 1200 X 12 MARINE PLYWOOD 2.40

DISPLAY AREA
50 X 50 HORIZONTAL
COCO LUMBER 50 X 50 HORIZONTAL
COCO LUMBER
50 X 50 HORIZONTAL
50 X 75 VERTICAL
COCO LUMBER
50 X 75 VERTICAL COCO LUMBER
COCO LUMBER
1.00

1.00

50 X 50 50 X 75 VERTICAL
WOODEN STAKE COCO LUMBER
1.00
GROUND 1.00

GROUND LEVEL LEVEL 50 X 75 VERTICAL


50 X 50
COCO LUMBER
WOODEN STAKE
0.50

0.50
GROUND LEVEL

0.50
0.50

2.40
1.00

TYPICAL FRAME ELEVATION FRONT ELEVATION 1.00 2.40

(OPTION 1)
STANDARD PROJECT BILLBOARD CONCURRED :

(COA)
STANDARD PROJECT BILLBOARD CAPTAIN JIM C. SYDIONGCO
DIRECTOR GENERAL
(DPWH) DATE :

PREPARED : PROJECT NAME AND LOCATION : SHEET CONTENTS : CHECKED : SUBMITTED : REVIEWED : RECOMMENDED : APPROVED : SET NO. SHEET NO.

ALPHA & OMEGA GEN. AS-STAKED PLAN REPUBLIC OF THE PHILIPPINES


CONTRACTOR & DEV'T CORP./ G
RUNWAY STRIP GRADE CORRECTION OF DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SABENIANO D. CALIAO, JR. ZENAIDA T. TAN 9
ABIB BUILDERS ENTERPRISES CEZARAH ROWENA C. DISCAYA OZAMIZ CITY AIRPORT ROAD, MISAMIS PROJECT BILLBOARD DETAILS REGION - X
ADELINO T. TANGAPA, DM VIRGIE G. NAYVE REY PETER B. GILLE
AUTHORIZED MANAGING PROJECT ENGINEER III CHIEF, CONSTRUCTION DIVISION CHIEF, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 8
(JV) OFFICER
OCCIDENTAL OFFICE OF THE REGIONAL DIRECTOR
ENGINEER'S HILL, BULUA, CAGAYAN DE ORO CITY
7 74
DATE : DATE : DATE : DATE : DATE :