Power Supply To Plot P18 at Zayed Military City D108337 SWH38A1

This document is a site acceptance test report for measuring the earth switch contact resistance at Plot P18, Zayed Military City. It details the contact resistance measurements in micro-ohms for feeders K01 to K09, all of which were within acceptable limits. The test was performed on May 4th, 2020 using a Megger MOM200A microhm meter to inject 100A DC through each feeder and measure the resultant contact resistance.

Uploaded by

Jayaprakash M P
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views

Power Supply To Plot P18 at Zayed Military City D108337 SWH38A1

This document is a site acceptance test report for measuring the earth switch contact resistance at Plot P18, Zayed Military City. It details the contact resistance measurements in micro-ohms for feeders K01 to K09, all of which were within acceptable limits. The test was performed on May 4th, 2020 using a Megger MOM200A microhm meter to inject 100A DC through each feeder and measure the resultant contact resistance.

Uploaded by

Jayaprakash M P
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project: Power supply to Plot P18 at Zayed

Military City
Project no.: D108337 Substation: SWH38A1
Location: Plot P18, Zayed Military City

Client ADDC Site Ref. 33/11kV PU - 1 / 11kV Switchgear


Contractor Time Electro Feeder No. K01 to K09
Testing Company Alphapower Date of Test 04.05.2020
SITE ACCEPTANCE TEST REPORT FOR EARTH SWITCH CONTACT RESISTANCE MEASUREMENT

1. EARTH SWITCH CONTACT RESISTANCE MEASUREMENT

Injected Current: 100 A dc Ambient Temperature: 29˚C


Measured Contact Resistance (µΩ)
Sr.No. FEEDER REFERENCE Remarks
L1 L2 L3
1 K01 465 411 462 OK
2 K02 353 348 392 OK
3 K03 389 327 320 OK
4 K04 369 326 307 OK
5 K05 328 356 395 OK
6 K06 412 410 427 OK
7 K07 384 379 396 OK
8 K08 389 378 382 OK
9 K09 390 394 395 OK

2. REMARKS:

3. TEST EQUIPMENT DETAILS:

Description Make Model Serial No Calibration Due Date


Micro Ohm meter Megger MOM200A 1202852 28.05.2020

TESTED BY CONTRACTOR WITNESSED /APPROVED BY


COMPANY ALPHAPOWER TIME ELECTRO ADDC
NAME JAYAPRAKASH M P

SIGNATURE

DATE 04.05.2020

SAT Report for ES CRM Page 1 of 1