Test Report For LV Panel

This document provides a test report for a low voltage panel installed at the Al Hayer housing project in Abu Dhabi. It summarizes the results of inspections and tests conducted on the panel to check for any defects, verify ratings and specifications, and ensure proper connections, markings and functionality. All test results were found to be satisfactory and within expected parameters. Relevant details of the panel such as manufacturer, ratings, and test date are also provided.

Uploaded by

Jayaprakash M P
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views8 pages

Test Report For LV Panel

This document provides a test report for a low voltage panel installed at the Al Hayer housing project in Abu Dhabi. It summarizes the results of inspections and tests conducted on the panel to check for any defects, verify ratings and specifications, and ensure proper connections, markings and functionality. All test results were found to be satisfactory and within expected parameters. Relevant details of the panel such as manufacturer, ratings, and test date are also provided.

Uploaded by

Jayaprakash M P
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

DESIGN AND BUILD OF 30 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER

PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY EQUIPMENT LV PANEL
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY &GENERAL
SUB CONTRACTOR SCHEME NO ND-11-18-116
CONSTRUCTION LLC.
SUBSTATION No AH1010 LOCATION Al HAYER

TEST REPORT FOR LV PANEL

Location AL HAYER Substation AH1010


Manufacturer AL HAMAD SWITCHGEAR Serial number LVAC-148/19/003
Rated Voltage 440V Rating of Busbar 2700 A
Incomer Rating 3150 A Year of Manufacture 05,2019
S.C Current 50 kA/1s Date of test 26.06.2019
INDEX: LIST OF TEST:
1.GENERAL CHECKS
2.CONTACT RESISTANCE MEASUREMENTS
3. AMMETER TEST
4. CTPRIMARY INJECTION TEST
5. VOLTAGE CIRCUIT CHECKS
6. BUSBAR HIGH VOLTAGE TEST 2kV 1 MIN

1. GENERAL CHECKS:
S. No. Description Checked
1 Inspect switchgear and all components for any physical damage / defects. OK
2 Check manufacturer name plate information for correctness. OK
3 Inspect enclosures for proper alignment, levelness and cable entry access. OK
4 Verify the fuses size/rating against the panel drawings. OK
5 Verify that all the interconnection control wires connected correctly. OK
6 Verify that appropriate anchorage, fixation and area clearances are provided. OK
7 Verify ON/OFF operation of Incomer 1 & 2, Buscoupler Isolators OK
8 Verify correct phase markings wherever required. OK
9 Check for the tightness of Busbar. OK
10 Verify earthing of LV panel. OK
11 Check panel for overall cleanliness including the interior. OK

COMPANY Tested by Witnessed by Witnessed by Witnessed by Approved by


Hydropower
Alpha Power Altorath AADC AADC
Energy
NAME BALAKUMAR

SIGNATURE

DATE 26.06.2019
Page 1 of 8
DESIGN AND BUILD OF 30 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER
PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY EQUIPMENT LV PANEL
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY &GENERAL
SUB CONTRACTOR SCHEME NO ND-11-18-116
CONSTRUCTION LLC.
SUBSTATION No AH1010 LOCATION Al HAYER

2. BUSBAR CONTACT RESISTANCE MEASUREMENT:

Injected Current : 100 Adc


Ambient Temperature : 34.3 ºC

Measured Contact resistance (µΩ)


Description Condition
R phase Y phase B phase Neutral

Incomer # 1 to Incomer #1 23 21 25 23
Bus #1 Isolator closed

Incomer # 2 to Incomer #2 25 22 20 26
Bus # 2 Isolator closed

Incomer # 1 to Incomer #1, Incomer #2 35 33 31 27


Incomer # 2 Bus coupler closed

Bus # 1 to
Bus coupler closed 54 53 54 60
Bus #2

3. AMMETER TEST
COMPANY Tested by Witnessed by Witnessed by Witnessed by Approved by
Hydropower
Alpha Power Altorath AADC AADC
Energy
NAME BALAKUMAR

SIGNATURE

DATE 26.06.2019
Page 2 of 8
DESIGN AND BUILD OF 30 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER
PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY EQUIPMENT LV PANEL
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY &GENERAL
SUB CONTRACTOR SCHEME NO ND-11-18-116
CONSTRUCTION LLC.
SUBSTATION No AH1010 LOCATION Al HAYER

INCOMER - 1
1. AMMETER DETAILS
MAKE CROMPTON FULL SCALE 3000 A
RANGE 0 – 3000A CT RATIO 2500 / 5 A
SL.NO R 709711-615 Y 709711-588 B 709711-591

2. SECONDARY INJECTION TEST:

Injected Current Measured in Ammeter (A) Expected Current (A)


Sl No
(A)
R Y B R Y B
1 2.50 1250 1250 1250 1250 1250 1250
2 5.00 2500 2500 2500 2500 2500 2500

INCOMER - 2
1. AMMETER DETAILS
MAKE CROMPTON FULL SCALE 3000 A
RANGE 0 – 3000A CT RATIO 2500 / 5 A
SL.NO R 709711-610 Y 709711-604 B 709711-612

2. SECONDARY INJECTION TEST:

Injected Current Measured in Ammeter (A) Expected Current (A)


Sl No
(A)
R Y B R Y B
1 2.50 1250 1250 1250 1250 1250 1250
2 5.00 2500 2500 2500 2500 2500 2500

COMPANY Tested by Witnessed by Witnessed by Witnessed by Approved by


Hydropower
Alpha Power Altorath AADC AADC
Energy
NAME BALAKUMAR

SIGNATURE

DATE 26.06.2019
Page 3 of 8
DESIGN AND BUILD OF 30 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER
PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY EQUIPMENT LV PANEL
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY &GENERAL
SUB CONTRACTOR SCHEME NO ND-11-18-116
CONSTRUCTION LLC.
SUBSTATION No AH1010 LOCATION Al HAYER

4. CT PRIMARY INJECTION

INCOMER – 1

1. CT DETAILS :
MAKE HOBUT RATIO 2500/5A
CLASS 0.5 FS10 BURDEN 10 VA
SL.NO R 116607/1/052 Y 116607/1/098 B 116607/1/046

2. PRIMARY INJECTION TEST:


Injected Measured in Ammeter Measured in kWh meter Expected reading
Sl No Primary CT Terminals (A) CT Terminals (A) (A)
Current (A) R Y B R Y B
1 400 0.8 0.8 0.8 0.8 0.8 0.8 0.8
2 800 1.6 1.6 1.6 1.6 1.6 1.6 1.6

Measured in Ammeter
Injected Primary Expected reading
Sl No (A)
Current (A) (A)
R Y B
1 400 400 400 400 400
2 800 800 800 800 800

INCOMER – 2
COMPANY Tested by Witnessed by Witnessed by Witnessed by Approved by
Hydropower
Alpha Power Altorath AADC AADC
Energy
NAME BALAKUMAR

SIGNATURE

DATE 26.06.2019
Page 4 of 8
DESIGN AND BUILD OF 30 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER
PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY EQUIPMENT LV PANEL
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY &GENERAL
SUB CONTRACTOR SCHEME NO ND-11-18-116
CONSTRUCTION LLC.
SUBSTATION No AH1010 LOCATION Al HAYER

1. CT DETAILS :
MAKE HOBUT RATIO 2500/5A
CLASS 0.5 FS10 BURDEN 10 VA
SL.NO R 116607/1/087 Y 116607/1/084 B 116607/1/050

2. PRIMARY INJECTION TEST:


Injected Measured in Ammeter Measured in kWh meter Expected reading
Sl No Primary CT Terminals (A) CT Terminals (A) (A)
Current (A) R Y B R Y B
1 400 0.8 0.8 0.8 0.8 0.8 0.8 0.8
2 800 1.6 1.6 1.6 1.6 1.6 1.6 1.6

Measured in Ammeter
Injected Primary Expected reading
Sl No (A)
Current (A) (A)
R Y B
1 400 400 400 400 400
2 800 800 800 800 800

5. VOLTAGE CIRCUIT CHECKS:

COMPANY Tested by Witnessed by Witnessed by Witnessed by Approved by


Hydropower
Alpha Power Altorath AADC AADC
Energy
NAME BALAKUMAR

SIGNATURE

DATE 26.06.2019
Page 5 of 8
DESIGN AND BUILD OF 30 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER
PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY EQUIPMENT LV PANEL
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY &GENERAL
SUB CONTRACTOR SCHEME NO ND-11-18-116
CONSTRUCTION LLC.
SUBSTATION No AH1010 LOCATION Al HAYER

INCOMER – 1

Reference R–Y Y–B B–R R–N Y–N B–N

Applied Voltage (V) 413.9 414.7 414.6 239.0 239.2 239.7

Measured Voltage
413.7 414.9 414.6 238.9 239.3 240.0
At kWh meter terminals (V)
Measured Voltage
415 415 415 240 240 240
At Voltmeter (V)

INCOMER –2

Reference R–Y Y–B B–R R–N Y–N B–N

Applied Voltage (V) 413.9 414.7 414.6 239.0 239.2 239.7

Measured Voltage
413.6 414.9 414.7 238.5 239.4 240.1
At kWh meter terminals (V)

Measured Voltage
415 415 415 240 240 240
At Voltmeter (V)

6. HIGH VOLTAGE TEST:


Note:
1.Incomer # 1, Bus coupler, Incomer # 2 closed and all fuses removed.

COMPANY Tested by Witnessed by Witnessed by Witnessed by Approved by


Hydropower
Alpha Power Altorath AADC AADC
Energy
NAME BALAKUMAR

SIGNATURE

DATE 26.06.2019
Page 6 of 8
DESIGN AND BUILD OF 30 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER
PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY EQUIPMENT LV PANEL
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY &GENERAL
SUB CONTRACTOR SCHEME NO ND-11-18-116
CONSTRUCTION LLC.
SUBSTATION No AH1010 LOCATION Al HAYER

2.All CT terminals shorted and earthed.

Insulation Resistance Test


Applied Voltage: 1000 Vdc for 1 Minute Ambient Temperature:38.4 OC
Insulation Resistance (GΩ) Insulation Resistance (GΩ)
Test points
Before High Voltage Test After High Voltage Test
R TO Y+B+N+E 9.98 10.24
Y TO R+B+N+E 10.12 10.65
B TO R+Y+N+E 11.73 12.03
N TO R+Y+B+E 7.65 8.94

High Voltage Test:


Applied voltage: 2kV for 1 minute.

Test Points Leakage Current (mA) Remarks


R to Y+B+N+E 2.6 WITHSTOOD
Y to R+B+N+E 2.6 WITHSTOOD
B to R+Y+N+E 2.6 WITHSTOOD
N to R+Y+B+E 3.2 WITHSTOOD

7. EARTH RESISTANCE MESUREMENT

SL No Earth pit Destination Earth resistance measured value Remarks


1 Body-Earth 1.1 Ω OK

REMARKS:

COMPANY Tested by Witnessed by Witnessed by Witnessed by Approved by


Hydropower
Alpha Power Altorath AADC AADC
Energy
NAME BALAKUMAR

SIGNATURE

DATE 26.06.2019
Page 7 of 8
DESIGN AND BUILD OF 30 VILLAS EMIRATI HOUSING PROJECT IN AL HAYER
PROJECT
WITH INFRASTRUCTURE WORKS
CLIENT ABU DHABI HOUSING AUTHORITY EQUIPMENT LV PANEL
END USER AL AIN DISTRIBUTION COMPANY.
CONSULTANT ALTORATH INTERNATIONAL
MAIN CONTRACTOR NAEL GENERAL CONTRACTING EST
HYDROPOWER ENERGY &GENERAL
SUB CONTRACTOR SCHEME NO ND-11-18-116
CONSTRUCTION LLC.
SUBSTATION No AH1010 LOCATION Al HAYER

8. TEST EQUIPMENT DETAILS:

S.N
INSTRUMENT NAME MAKE TYPE SERIAL No. DUE DATE
O
1 Digital Multimeter FLUKE 87V 36330028 21.06.2020
2 Multi Func.Primary Inj. Kit OMICRON CPC 100 RD 170Y 17.02.2020
3 IR Tester MEGGER MIT 515 101365331 11.06.2020
4 HV AC Test Kit HIPOT HV PFT 1508 21.01.2020
5 SecondaryInj.Kit PROGRAMMA SVERKER 780 1602371 21.01.2020
6 Digital Clamp meter FLUKE 376 33650057WS 21.06.2020
7 Multifunc. Tester FLUKE 1653 B 1552170 20.01.2020

8 AC Leakage Current Clamp FLUKE 369 FC 43860064WS 19.06.2020

COMPANY Tested by Witnessed by Witnessed by Witnessed by Approved by


Hydropower
Alpha Power Altorath AADC AADC
Energy
NAME BALAKUMAR

SIGNATURE

DATE 26.06.2019
Page 8 of 8