Project Execution Plan
Project Execution Plan
1 General
The major construction works involved in this tender for short term
development of the port comprises the followings:
(2 )Gas facilities & associated utilities to receive the high pressure gas
delivered by the FSRU, to transport the gas over a short distance to a
Metering Station
It is planned to carry out the construction works for this project in 6 major
construction lines in general , including construction of road and
pavement, building and foundation work、equipment installation, piping
work 、 electrical work and instrument work. The general construction
sequences for these major construction lines are schematically illustrated
in Following chart.
1
2