0% found this document useful (0 votes)
36 views

Layout Baru

The document describes a facility layout problem with 10 departments. It provides information on the problem name, number of departments, layout type, facility dimensions, department names and areas, initial layout, and flow and cost matrices between departments. The objective is to optimize the layout to minimize material handling costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Layout Baru

The document describes a facility layout problem with 10 departments. It provides information on the problem name, number of departments, layout type, facility dimensions, department names and areas, initial layout, and flow and cost matrices between departments. The objective is to optimize the layout to minimize material handling costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Facility Layout

Problem Name: Production Method: Sequence


Number Depts.: 10 Layout: Aisle
Length(cells): 15 Fill Departments: No
Width(cells): 15 Measure: Rectilinear
Area (cells): 225 Number Aisles: 3
Cost: 918 Dept. Width: 5
918
Department Color Area-requiredArea-defined x-centroid y-centroid Sequence
Receiving 1 10 10 2.5 1 1 1
D'back 2 30 30 2.5 5 2 2
Picking 3 35 35 2.5 11.5 3 3
Sorting 4 30 30 7.5 12 4 4
Seaming 5 15 15 7.5 7.5 5 5
Chill Tank 6 20 20 7.5 4 6 6
Pasteurization 7 30 30 10.833333 1.66666663 7 7
Coding 8 20 20 12.5 6 8 8
Packing 9 10 10 12.5 9 9 9
Cold Storage 10 25 25 12.5 12.5 10 10
11
12
13
14
15
Opt. Form Optimize

Random Layout Evaluate Show Flows

Solve Switch Change Facility


Initial layout
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 1 1 1 1 7 7 7 7 7 7 7 7 7 7
1 1 1 1 1 7 7 7 7 7 7 7 7 7 7
2 2 2 2 2 6 6 6 6 6 7 7 7 7 7
2 2 2 2 2 6 6 6 6 6 7 7 7 7 7
2 2 2 2 2 6 6 6 6 6 8 8 8 8 8
2 2 2 2 2 6 6 6 6 6 8 8 8 8 8
2 2 2 2 2 5 5 5 5 5 8 8 8 8 8
2 2 2 2 2 5 5 5 5 5 8 8 8 8 8
3 3 3 3 3 5 5 5 5 5 9 9 9 9 9
3 3 3 3 3 4 4 4 4 4 9 9 9 9 9
3 3 3 3 3 4 4 4 4 4 10 10 10 10 10
3 3 3 3 3 4 4 4 4 4 10 10 10 10 10
3 3 3 3 3 4 4 4 4 4 10 10 10 10 10
3 3 3 3 3 4 4 4 4 4 10 10 10 10 10
3 3 3 3 3 4 4 4 4 4 10 10 10 10 10
Layout Data
Problem Name: Production
Number Depts.: 10 Define Facility
Fixed Points: 0
Dimension: m

Facility Information
Scale-m/unit 1 Cells
Length-m 15 15
Width-m 15 15
Area-sq.m 225 225

Department Information
Name F/V Area Cells
Dept. 1 Receiving V 10 10
Dept. 2 D'back V 30 30
Dept. 3 Picking V 35 35
Dept. 4 Sorting V 30 30
Dept. 5 Seaming V 15 15
Dept. 6 Chill Tank V 20 20
Dept. 7 Pasteurization V 30 30
Dept. 8 Coding V 20 20
Dept. 9 Packing V 10 10
Dept. 10 Cold Storage V 25 25
225

Flow Matrix
TO
FROM Receiving D'back Picking Sorting Seaming Chill Tank
Receiving 5 4 3 2 1
D'back 5 4 3 2
Picking 5 4 3
Sorting 5 4
Seaming 5
Chill Tank
Pasteurization
Coding
Packing
Cold Storage
Cost Matrix
TO
FROM Receiving D'back Picking Sorting Seaming Chill Tank
Receiving 1 1 1 1 1 1
D'back 1 1 1 1 1 1
Picking 1 1 1 1 1 1
Sorting 1 1 1 1 1 1
Seaming 1 1 1 1 1 1
Chill Tank 1 1 1 1 1 1
Pasteurization 1 1 1 1 1 1
Coding 1 1 1 1 1 1
Packing 1 1 1 1 1 1
Cold Storage 1 1 1 1 1 1
Pasteurization Coding Packing Cold Storage

1
2 1
3 2 1
4 3 2 1
5 4 3 2
5 4 3
5 4
5
Pasteurization Coding Packing Cold Storage
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1

You might also like