Typical Plan of Isolated Footing: Isolated Footing Details: Schedule of Footings For SBC of Soil 200 KN/M
Typical Plan of Isolated Footing: Isolated Footing Details: Schedule of Footings For SBC of Soil 200 KN/M
1 2 3 4 5 6 P.C.C BED
COLUMN
'b' BARS
A
B
'a' BARS
GL
C COLUMN MAIN
REINFORCEMENT
D HORIZONTAL TIES
1500 (MIN)
'a' BARS
'b' BARS
450 450
D
100 Thk
4"
P.C.C 1:3:6
4" L 4"
E
SECTION @ A-A
FOR EXCAVATION
F PURPOSE ONLY
G NOTES:
ALL DIMENSIONS ARE IN FEET AND INCHES.
THE NET SBC CONSIDERED FOR DESIGN AT THE FOUNDATION LEVEL IS 20T/SQM
FOOTING PLAN GRADE OF CONCRETE SHALL BE M25 WITH 20MM DOWN GRADED COARSE
AGGREGATE FOR FOUNDATION AND OTHER STRUCTURES.
ANY LOOSE SOIL ENCOUNTERED AT THE FOUNDATION LEVEL SHALL BE
REMOVED AND REPLACED WITH CC 1:3:6.
FOUNDATION LEVEL SUGGESTED IS -1.5 M (5'-0" ) BELOW GROUND LEVEL.
IF HARD STRATA IS NOT MET AT THE FOUNDATION LEVEL THE SAME SHALL
BE INFORMED TO THE DESIGN OFFICE FOR SUITABLE MODIFICATION.
SCHEDULE OF FOOTINGS FOR SBC OF SOIL 200 KN/m² CLEAR COVER TO REINFORCEMENT SHALL BE AS FOLLOWS:-
50mm ON ALL SIDES FOR FOOTING
40mm FOR PEDESTAL & COLUMNS.
REINFORCEMENT USED SHALL BE OF THE GRADE OF Fe 500.
ISOLATED FOOTING DETAILS: LAP LENGTH TO BE PROVIDED SHALL BE 50 DIA OF BAR.
FOUNDATION IS DESIGNED FOR (G+1) BLDG
DO NOT SCALE
FOOTING SIZE REINFORCEMENT
CODE L B DEPTH 'a' BARS 'b' BARS
F1 8'3" 6'3" 18'' 12@4"C/C 12@4"C/C
F2 6'3" 5'4" 18" 12@4"C/C 12@6"C/C CLIENT DATE
PROJECT CHECKED