0% found this document useful (0 votes)
169 views17 pages

JSEA-ICS-005-Erection Modification and Dismantling of Scaffolding

This document provides a job safety environmental analysis for the erection, modification, and dismantling of scaffolding for an instrumentation and control project. It identifies three main risks: 1. Site evaluation risks like slip and trip hazards from unnecessary obstructions. Workers will be educated on spotting potential hazards. 2. Documentation and permitting risks from miscommunication with project stakeholders. Coordination will occur before work commences. 3. Scaffolding preparation and mobilization risks like slips, trips, and falls from obstructed work areas. Access routes will be kept clear and hazardous items will be removed or secured.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views17 pages

JSEA-ICS-005-Erection Modification and Dismantling of Scaffolding

This document provides a job safety environmental analysis for the erection, modification, and dismantling of scaffolding for an instrumentation and control project. It identifies three main risks: 1. Site evaluation risks like slip and trip hazards from unnecessary obstructions. Workers will be educated on spotting potential hazards. 2. Documentation and permitting risks from miscommunication with project stakeholders. Coordination will occur before work commences. 3. Scaffolding preparation and mobilization risks like slips, trips, and falls from obstructed work areas. Access routes will be kept clear and hazardous items will be removed or secured.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

Company Insrumentation &Control Specialists, Inc. Document ID No.

JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

EL remove all unnecessary that can cause of obstraction


S
EC
Site Evaluation for the work 1. All prsonnel to have completed the site specific induction.
Site Survey of scaffold area. Evaluate the possible
1 erection area before Operational slip and trip hazard Fracture, body injurie 2.
start erecting. hazard and risks at the work precise coordination
area. A
3. Ensure that
workers are educate on spotting potential hazards.

PPE safety shoes


EL
S
Preparation of Prepare necessary Occupational Misccommunication Delay of Permit to EC
2 Documents or Permit documents (pen and papers) Health & Safety with Project Enduser Work (PTW)
to Work (PTW). and Project Owner Coordinate the activity to the Enduser and Project owner
A before commencing work.
PPE
EL
S
EC
1. Check Vehicle of its road worthiness.
Occupational Hit againts personnel or body injuries, property 2. comply with plant
Health & Safety property damage road speed limits and driving regulations.
A
3. banksman or spotter
shall be provided during loading, unloading, moving
prepare tools, equipment operation.
and materials to be used for
Preparation and erecting of scaffold (tubular PPE hardhat, safety glass, safety shoes,
3
mobilization of tools, pipes, fixed/swivel clamps,
equipment and toeboards, flatforms, beam 1. Keep access and egress routes clear and segregate the
scaffolding materials clams, and all necessary work area from others and vehicles in access areas.
scaffold materials and 2.
accessories). remove any items that may obstruct the work activty; and

Occupational Slips, trips and falls at cuts, bruises, sprains 3. Check for any items that may cause slips, trips and falls
Health & Safety the same level and strains and remove or secure them as required.
EL
S
EC
A

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
prepare tools, equipment
and materials to be used for
Preparation and erecting of scaffold (tubular
3
mobilization of tools, pipes, fixed/swivel clamps,
equipment and toeboards, flatforms, beam
scaffolding materials clams, and all necessary
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
scaffold materials and
Department/s accessories). Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Occupational Slips, trips and falls at cuts, bruises, sprains
Health & Safety the same level and strains

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

PPE safety shoes

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

EL
S
EC

Mobilization of Mobilization of manpower to Occupational Hit by moving 1. Ensure all workers abide to the traffic rules and regulations
4 the work area for the Bodily injury/Fatality in the plant.
Manpower scaffolding erection Health & Safety machinery
2. Ensure workers use the pedestrian walkway
provided during travelling.
3 Be extra carefull when crossing the road.
A
PPE
EL
1. Ensure material is carried in small quantity to minimize the
weight carried.
S

bodily injury/back 1.Use mechanical aid if necessary ( boom truck or crane )


Ergonomically hazard EC
injury/Hand injury
1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
A
PPE working gloves

Manual Loading and Loading and unloading of 1. Keep access and egress routes clear and segregate the
Occupational work area from others and vehicles in access areas.
5 unloading of scaffold scaffold materials use for Health & Safety
materials erection of scaffold 2.
remove any items that may obstruct the work activity
EL
S
Tripping and Slipping Bodily Injury, fracture, EC
hazard disability
1. avoid carrying large material that could obstruct view
ahead.
2. Check for any items that may cause slips, trips and falls
and remove or secure them as required.
3. Maintain good
A housekeeping at work area.
PPE safety shoes
EL
S

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

EC

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

1. All personnel to have read and understood the JSEA/RA


that is specific for their area of work
2 Make sure all access and egress, access ladders, steps
Occupational and ramps are safe and secure.
Health & Safety Poor access and egress Bodily Injury 3.
JSEA/RA is to be modified where and when necessary to
reflect the changing work area.
A
PPE
6
Preperation of Asses work area access and weather
working area condition EL
S
EC

Occupational Poor or bad weather Bodily injuries, property Immediately cease work in hazardous weather conditon such
Health & Safety conditon damage as:
A 1. strong winds that may cause loss of balance.
2. Rain is causing a slippery
work surface.
PPE
EL
Ensure material is carried in small quantity to minimize the
S weight.
EC
Ergonomally hazards bodily injury/back pain 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3.
avoid awkward position to prevent body pain/back pain.
A
Lay Sole board, if required Occupational PPE
Erection / modification of
7 scaffolding place base plates at suitable Health & Safety
location EL
S
EC
1. Educate worker on proper hand placement
Pinch point, sharp 2. Buddy buddy system
edges around the base bodily injury/hand
injury/cuts 3. proper
plate A communication and coordination before lifting tubular pipes.
4. provide an awareness training regarding line of fire and
hand finger safety.

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Lay Sole board, if required Occupational
Erection / modification of
7
scaffolding place base plates at suitable Health & Safety
Company location Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Pinch point, sharp bodily injury/hand
edges around the base injury/cuts
plate
Risk Activities/Equipment/Products Aspect / Hazard / Risk
Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

PPE working gloves

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

EL
Ensure material is carried in small quantity to minimize the
S weight.
EC

Ergonomally hazards bodily injury/back pain 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
A load is to heavy/large (Buddy Buddy System)
3. avoid awkward
position to prevent body pain/back pain.

PPE
EL
S
EC
1. Educate worker on proper hand placement
Pinch point, sharp 2. Buddy buddy system
pitch the standard at spacing edges around the base bodily injury/hand
injury/cuts 3. proper
Install the lift ledgers of not more than 2.5mapart. plate communication and coordination before lifting tubular pipes.
8
and transoms Secure foot-tie at inner side Occupational
Safety
Health &
of not more that 460mm 4. provide an awareness training regarding
from ground. line of fire and hand finger safety.
A
PPE
EL
S

1. Ensure vertical tubes are not releasd until the foot ties are
securely installed.
2. ensure ratchet
Hit by falling scaffold spanner is secured to the erectors body.
EC
tubes, ratchet spanner Bodily injury/ fatality/
damage to property
and coupling 1. Ensure worker are trained and qualified to erect, dismantle
or modify scaffold.
2. Ensure close
supervision
3. implement a buddy system for assistance to hold
vertical tubes during securing of foot-tie.
A
PPE

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

EL
Ensure material is carried in small quantity to minimize the
weight.
S
EC
Occupational Ergonomally hazards bodily injury/back pain
Health & Safety 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3. avoid awkward
position to prevent body pain/back pain.
A
PPE
EL
S
EC

1. Educate worker on proper hand placement


Occupational Pinch point, sharp
edges around the base bodily injury/hand 2. Buddy buddy system
Install temporary platform Health & Safety plate injury/cuts 3. proper
9 Erect working flatform (at least 500mm wide) and communication and coordination before lifting tubular pipes.
temporary access ladder
4. provide an awareness training regarding line of fire and
hand finger safety.
A
PPE
EL
S

1. Ensure metal decking, ladder are not released until it is


secured. .
2. Ensure ratchet spanner is secured to the
erectors body.
Occupational Hit by falling metal, EC
decking, ladder, ratchet Bodily injury/ fatality/
Health & Safety spanner and coupling. damage to property
1. Ensure worker are trained and qualified to erect, dismantle
or modify scaffold.
2. Ensure close supervision
3. implement a buddy system for
assistance to hold the flatform during securing.
A

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Install temporary platform
9 Erect working flatform (at least 500mm wide) and
temporary access ladder

Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005


Department/s Hit by falling metal,Contractor Revision No
Occupational decking, ladder, ratchet Bodily injury/ fatality/
Job Title Health & Safetyand dismantling
Erection/Modification scaffoldingdamage to property Effective Date October 3 - 10, 2019
spanner andofcoupling. (Integration Of SWAS Monitoring System Unit 1&2)

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

PPE

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

Stop work if severe weather condition (wind speed is above


EL 16 knots).
S
1. work area to be barriered off by suitable means to prevent
access of unuathorized personnel.
2. Install independent lifline for
Falling from anchoring points of lanyard encase of sacffold colapse.
Occupational height/drop object or Bodily Injury/ fatality
Health & Safety small materials /falling 3. Secure tools using nylon rope, provision of tool bag
of ladder EC for small object to prevent from falling.

1. must be supplemented by the posting of prominently


located signage.
2. secure PTW with secondary
PTW for W@H
3. ensure 100% tie-off of FBH lanyard
A
PPE
Stop work if severe weather condition (wind speed is above
EL
16 knots).
S
1. Ensure ladder is tie-down by putting couplers of scaffold
wires.
2. install independent life line for anchoring of
FBH lanyard.
EC
Falling from height/fall
of person during 1. must be supplemented by the posting of prominently
10 erection and Serious injury/ fatality located signage.
dismantle/falling of 2. secure PTW with secondary PTW for W@H
ladders 3. ensure
100% tie-off of FBH lanyard
4. ensure all workers has trained and aware of working
at heights
5. ensure close monitoring and supervision
6. avoid over reaching to
prevent personnel from accidental falling.
A

1. personnel to wear suitable full body harness with double


lanyards and shock absorber.
PPE

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

EL
Ensure material is carried in small quantity to minimize the
weight.
S
EC
1. Educate worker of correct manual lifting method.
Ergonomically hazards bodily injury/ back
pain/ muscle strain 2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3. avoid awkward position to prevent body
pain/back pain.
4. avoid over reaching to
prevent muscle strain
A
PPE
EL
S
EC
1. Educate worker on proper hand placement
Pinch point, sharp 2. Buddy buddy system
edges around the base bodily injury/hand 3. proper
plate injury/cuts
communication and coordination before lifting tubular pipes.
4.
provide an awareness training regarding line of fire and hand
A finger safety.

Ensure hand gloves is worn in any operation


PPE
no modification is to made to the scaffold, specially removal
of ties or structural members.
EL
S

Collapse of scaffold Serious injury/ fatality / 1. Structural design of scaffold must be review and sign by a
when erected and property damage structuraal engineer.
during dsmantle 2. Scaffolds to be located upon firm and solid
foundations that are capable of withstanding all impose load.
3.
scaffold to be physically tied throughout all satges of erection
and dismantling.
EC

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item
Procedure / Job Steps
or Services
Risk Category
Source / Vulnerability
Impact / Risk / Threat HOC Control Measures Action Plan Target Date

1. All sacaffolders must be a NCII Certied


2. Ensure that scaffolding working load is
not exceeded or overloaded.
3. level of material stored on the
scaffold should be kept to the lowest possible level at all
times. 4. Use the scaffold in accordance
withthe loading specified on the hand over
certificate/scaffold tag
A

Ensure wearing of proper/basic PPE's such as but not limited


to Haardhat, Safety shoes, safety glass, hand gloves.
PPE
EL
S
EC

1. scaffold must be erected by a person holding a certificate


of competency for scaffolding.
2. ensure buddy system when lifting tubular pipe to prevent
Occupational Strucck by Scaffolding Bodily injuries, fracture, A struck by injuries. 3.
Health & Safety when erected disability, fatality provide safe means of raisisng, lowering and storing tools,
scaffold materials and debris. 4. make
sure safe distance are maintained to prevent struck by
injuries.

Ensure wearing of proper/basic PPE's such as but not limited


to Haardhat, Safety shoes, safety glass, hand gloves.
PPE

unauthorized removal of interference with scaffold


components
EL

Tagging of scaffolding for S


safe use, SLPGC safety officer Occupational Incomplete scaffold Bodily injury/ property Scaffold inspected by competent person prior to use
11 Use of scaffold conduct inspection prior to Health & Safety structure/ scaffold damage EC
use the scaffold. collapsed

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps Tagging oforscaffolding
Services for Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date
safe use, SLPGC safety officer Occupational Incomplete scaffold Bodily injury/ property
11 Use of scaffold conduct inspection prior to Health & Safety structure/ scaffold damage
collapsed
use the scaffold.
1. Scaffold to be barricaded toprevent unauthorized used.
A
2. make sure all scaffold components stayin
place until the scaffold is dismantled.

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

Ensure wearing of proper/basic PPE's such as but not limited


to Hardhat, Safety shoes, safety glass, hand gloves.
PPE
EL
S

1. Complete edge protection to working flatform


2. safe access and egress from the scaffold must
be provided
EC

Fall from height /Fall 1. Secure supporting PTW for working at heights
Occupational from scaffold or
serious injury/ 2. Ensure close supervision
Health & Safety working flatform disability/ fatality 3. Ensure 100% tie-off of full
A
body harness lanyard 4. ensure
3 point of contact while descending and ascending on scaffold
ladder and working flatform.
5. Make sure all workers stayfully within the scaffold at all
times.

1. personnel to wear suitable full body harness with double


PPE lanyards and shock absorber.
EL
S

1. All Raising and lowering of materials to be carried out in


controlled manner (i.e. hand to hand, by light-line, nylone
rope and fitting bags.)
2. Provide safety nets if necessary
EC
working on scaffold for the
working on/below installation works, cable Occupational Bodiliy injury, disability, 1. post warning signs and work within the sealed area
12 Fall of materials fatality, property or
scaffold pulling and other work at Health & Safety equipment damage 2. Only the material being used to be out on
heights activities. the scaffold until boardedd areas are erected to store.
A
3. materials to be stored in a safe and secure
manner, to prevent them accidentally falling or being
knocked off th eworking platform when at height.
4. Ensure
close monitoring and supervision.

1. personnel to wear suitable full body harness with double


PPE lanyards and shock absorber.

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item
Procedure / Job Steps
or Services
Risk Category
Source / Vulnerability
Impact / Risk / Threat HOC Control Measures Action Plan Target Date

EL
S

1. Complete edge protection to working flatform


2. safe access and egress from the scaffold must
be provided
3. Installed independent lifline
EC
Fall from height /Fall
Occupational from scaffold or serious injury/ 1. Secure supporting PTW for working at heights
Health & Safety working flatform disability/ fatality 2. Ensure close supervision
3. Ensure 100% tie-
A
off of full body harness lanyard
4. ensure 3 point of contact while descending and ascending
on scaffold ladder and working flatform.
5. Make sure all workers stayfully within
the scaffold at all times.

1. personnel to wear suitable full body harness with double


PPE
lanyards and shock absorber.
EL
S

1. All Raising and lowering of materials to be carried out in


controlled manner (i.e. hand to hand, by light-line, nylone
rope and fitting bags.)
2. Provide safety nets if necessary
EC
Scaffold dismantled in Bodiliy injury, disability, 1. post warning signs and work within the sealed area
13 Dismantle scaffold accordance with plant safety, Occupational falling of Materials fatality, property or 2. Only the material being used to be out on
Enduser and supplier Health & Safety equipment damage the scaffold until boardedd areas are erected to store.
instruction 3. materials to be stored in a
A
safe and secure manner, to prevent them accidentally falling
or being knocked off th eworking platform when at height.
4. Ensure close monitoring and supervision.

1. personnel to wear suitable full body harness with double


PPE lanyards and shock absorber.

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

EL
S
1. Scaffold to be dismantled in accordance with
EC
manufacturers or supplier instruction.

1. Make sure area beneath and around the sacffold is kept at


all times during deconstruction.
2. Make sure the lower ties are
Occupational Bodily injury/ property only removed when the scaffold is dismantled down to that
Health & Safety Structural colapse damage level to avoid collapse.
A 3. Make sure ropes for
lowering equipment are securely tied.
4. Make
sure safe distanced are maintained at alltimes during the
dismantling process.
5. ensure 100% tie-off of FBH lanyard

1. personnel to wear suitable full body harness with double


PPE lanyards and shock absorber.
1. Remove and segregate materials, waste materials, store
tools, equipment on their designated area
2. . Keep access and egress routes clear and segregate
the work area from others and vehicles in access areas.
3. remove any items that may obstruct the work activty; and
4. Check for any items that may cause slips,
14
Housekeeping before, Housekeeping before, During Occupational Slips, trips and falls at Bodily Injury, fracture, EL trips and falls and remove or secure them as required.
During and after (5's) and after (5's) Health & Safety the same level disability S
EC
A 1. Make sure the work area is left clean and tidy

Ensure wearing of proper/basic PPE's such as but not limited


to Hardhat, Safety shoes, safety glass, hand gloves.
PPE
Prepared by / Date: Checked by / Date: Approved by / Date:

_______________________ _______________________ _______________________

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019

Risk Activities/Equipment/Products Aspect / Hazard / Risk


Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date

Safety Officer/PIC CPC Safety Inspector TL Risk Management

Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019

You might also like