JSEA-ICS-005-Erection Modification and Dismantling of Scaffolding
JSEA-ICS-005-Erection Modification and Dismantling of Scaffolding
JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Occupational Slips, trips and falls at cuts, bruises, sprains 3. Check for any items that may cause slips, trips and falls
Health & Safety the same level and strains and remove or secure them as required.
EL
S
EC
A
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
prepare tools, equipment
and materials to be used for
Preparation and erecting of scaffold (tubular
3
mobilization of tools, pipes, fixed/swivel clamps,
equipment and toeboards, flatforms, beam
scaffolding materials clams, and all necessary
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
scaffold materials and
Department/s accessories). Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Occupational Slips, trips and falls at cuts, bruises, sprains
Health & Safety the same level and strains
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
EL
S
EC
Mobilization of Mobilization of manpower to Occupational Hit by moving 1. Ensure all workers abide to the traffic rules and regulations
4 the work area for the Bodily injury/Fatality in the plant.
Manpower scaffolding erection Health & Safety machinery
2. Ensure workers use the pedestrian walkway
provided during travelling.
3 Be extra carefull when crossing the road.
A
PPE
EL
1. Ensure material is carried in small quantity to minimize the
weight carried.
S
Manual Loading and Loading and unloading of 1. Keep access and egress routes clear and segregate the
Occupational work area from others and vehicles in access areas.
5 unloading of scaffold scaffold materials use for Health & Safety
materials erection of scaffold 2.
remove any items that may obstruct the work activity
EL
S
Tripping and Slipping Bodily Injury, fracture, EC
hazard disability
1. avoid carrying large material that could obstruct view
ahead.
2. Check for any items that may cause slips, trips and falls
and remove or secure them as required.
3. Maintain good
A housekeeping at work area.
PPE safety shoes
EL
S
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Occupational Poor or bad weather Bodily injuries, property Immediately cease work in hazardous weather conditon such
Health & Safety conditon damage as:
A 1. strong winds that may cause loss of balance.
2. Rain is causing a slippery
work surface.
PPE
EL
Ensure material is carried in small quantity to minimize the
S weight.
EC
Ergonomally hazards bodily injury/back pain 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3.
avoid awkward position to prevent body pain/back pain.
A
Lay Sole board, if required Occupational PPE
Erection / modification of
7 scaffolding place base plates at suitable Health & Safety
location EL
S
EC
1. Educate worker on proper hand placement
Pinch point, sharp 2. Buddy buddy system
edges around the base bodily injury/hand
injury/cuts 3. proper
plate A communication and coordination before lifting tubular pipes.
4. provide an awareness training regarding line of fire and
hand finger safety.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Lay Sole board, if required Occupational
Erection / modification of
7
scaffolding place base plates at suitable Health & Safety
Company location Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Pinch point, sharp bodily injury/hand
edges around the base injury/cuts
plate
Risk Activities/Equipment/Products Aspect / Hazard / Risk
Item Procedure / Job Steps or Services Risk Category Source / Vulnerability Impact / Risk / Threat HOC Control Measures Action Plan Target Date
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
EL
Ensure material is carried in small quantity to minimize the
S weight.
EC
Ergonomally hazards bodily injury/back pain 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
A load is to heavy/large (Buddy Buddy System)
3. avoid awkward
position to prevent body pain/back pain.
PPE
EL
S
EC
1. Educate worker on proper hand placement
Pinch point, sharp 2. Buddy buddy system
pitch the standard at spacing edges around the base bodily injury/hand
injury/cuts 3. proper
Install the lift ledgers of not more than 2.5mapart. plate communication and coordination before lifting tubular pipes.
8
and transoms Secure foot-tie at inner side Occupational
Safety
Health &
of not more that 460mm 4. provide an awareness training regarding
from ground. line of fire and hand finger safety.
A
PPE
EL
S
1. Ensure vertical tubes are not releasd until the foot ties are
securely installed.
2. ensure ratchet
Hit by falling scaffold spanner is secured to the erectors body.
EC
tubes, ratchet spanner Bodily injury/ fatality/
damage to property
and coupling 1. Ensure worker are trained and qualified to erect, dismantle
or modify scaffold.
2. Ensure close
supervision
3. implement a buddy system for assistance to hold
vertical tubes during securing of foot-tie.
A
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
EL
Ensure material is carried in small quantity to minimize the
weight.
S
EC
Occupational Ergonomally hazards bodily injury/back pain
Health & Safety 1. Educate worker of correct manual lifting method.
2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3. avoid awkward
position to prevent body pain/back pain.
A
PPE
EL
S
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Install temporary platform
9 Erect working flatform (at least 500mm wide) and
temporary access ladder
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
EL
Ensure material is carried in small quantity to minimize the
weight.
S
EC
1. Educate worker of correct manual lifting method.
Ergonomically hazards bodily injury/ back
pain/ muscle strain 2. Advice worker to seek help if the
load is to heavy/large (Buddy Buddy System)
3. avoid awkward position to prevent body
pain/back pain.
4. avoid over reaching to
prevent muscle strain
A
PPE
EL
S
EC
1. Educate worker on proper hand placement
Pinch point, sharp 2. Buddy buddy system
edges around the base bodily injury/hand 3. proper
plate injury/cuts
communication and coordination before lifting tubular pipes.
4.
provide an awareness training regarding line of fire and hand
A finger safety.
Collapse of scaffold Serious injury/ fatality / 1. Structural design of scaffold must be review and sign by a
when erected and property damage structuraal engineer.
during dsmantle 2. Scaffolds to be located upon firm and solid
foundations that are capable of withstanding all impose load.
3.
scaffold to be physically tied throughout all satges of erection
and dismantling.
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Fall from height /Fall 1. Secure supporting PTW for working at heights
Occupational from scaffold or
serious injury/ 2. Ensure close supervision
Health & Safety working flatform disability/ fatality 3. Ensure 100% tie-off of full
A
body harness lanyard 4. ensure
3 point of contact while descending and ascending on scaffold
ladder and working flatform.
5. Make sure all workers stayfully within the scaffold at all
times.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
EL
S
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
EL
S
1. Scaffold to be dismantled in accordance with
EC
manufacturers or supplier instruction.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Insrumentation &Control Specialists, Inc. Document ID No. JSEA-ICS-005
Department/s Contractor Revision No
Job Title Erection/Modification and dismantling of scaffolding (Integration Of SWAS Monitoring System Unit 1&2) Effective Date October 3 - 10, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019