Weekly Progress Report - Template
Weekly Progress Report - Template
CLIENT NAME
CLIENT LOGO
Agreement No: XXX/XX/XX/XX/XX
Project Title:
EPC Works for XYZ Project
Location:
Name EPC WORKS FOR XYZ PROJECT
Client:
XYZ Company WEEKLY PROGRESS REPORT
Engineer/Consultant: WPR No.: XX-XX-XX-xxx
XYZ COMPANY
Reporting Period: xx-Dec-xx to xx-Dec-xx
EPC Contractor:
XYZ COMPANY
Agreement Value:
XXX Million US$
CONTRACTOR LOGO
Originator/
Description Date Approved by
Reviewer
TABLE OF CONTENT
1. PROGRESS & EXECUTIVE SUMMARY .............................................................................................. 3
9. ATTACHMENTS: ........................................................................................................................... 32
RMN
RMN 5.0%
RMN RMN
25.5%
29.3% 29.0%
ACT ACT
ACT
70.8% 71.0%
74.5% ACT
95.0%
Explain above table and provide brief interpretation of progress for the week e.g.
The above pie-chart shows that overall project cumulative actual progress is xx% against plan of xx% with a negative variance
of -xx% with respect to baseline plan. The negative variance has increased from last week w.r.t baseline plan by -xx%.
Engineering cumulative actual progress xx% is less than the baseline plan progress (xx%) by -xx% which showed slight
improvement than last week due to less planned progress. Similar to Engineering progress, Procurement cumulative actual
progress xx% is also lagging baseline plan (xx%) by -xx%. Compared to last week, Procurement negative variance has increased
this week by -xx% w.r.t. baseline.
In addition to above, Construction cumulative actual progress xx% is less than baseline plan progress (xx%). The negative
variance has increased from last week by -xx% when compared to baseline plan.
Engineering 10%
Procurement 50%
Construction 40%
2. PROGRESS ANALYSIS
2.1 WEEKLY Baseline/Recovery Plan vs Actual Trend
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your
2.2 Negative Variance Trend w.r.t. Baseline Plan and Recovery Plan
Explain above S-Curve as per progress on your project below; I have given snapshot of few weeks only.
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
3. PROGRAM & COST INFORMATION (If you have multiple projects or program, then use this section)
3.1 PROGRAM TENDER & AWARD & DELIVERY ROADMAP (Actual vs Plan/Forecast)
P
EPC WORKS
F
PROJECT-1
A
P
PROJECT-2 F
A
P
PROJECT-3 F
A
P
PROJECT-4 F
A
P
PROJECT-5 F
A
Issue RFQ to Bidders Receive Technical Bid Letter of Award
Project Start Project Finish
EPC PROGRAM
EPC WORKS
XYZ 72,054,955 4,500,000 76,554,955 50,111,393 77,459,955 905,000
PROJECT-1
EPC PROGRAM
EPC WORKS
27-Jan-16 - 26-Feb-16 30 27-Jan-18 12-Apr-18 - 75
PROJECT-1
1.
2.
3.
4.
5.
6.
7.
5. HSE STATISTICS
EPC WORKS
Sr. No PROJECT HSE STATISTICS
This Week Cumulative
4 1 2 6
Consequence 3 1 7 5 2
2 1 5 3
1 2 2
A B C D E
Probability
Following are major project risks that were identified during workshop conducted on xx-Dec-xx;
Risk Risk
Risk Description (Top Ten) Mitigation Action RAM
Rank No.
NOC Status Activity-1 Activity-2 Activity-3 Activity-4 Activity-5 Activity-6 Activity-7 Total
Total 28 40 40 40 40 40 40 182
Objections 0 0 0
In Progress 1 1 1 3*
No Answer 0
*Following NOCs’ are critical for the project however have not received.
1. Your Text Here Your Text Here
2. Your Text Here Your Text Here
3. Your Text Here Your Text Here
4. Your Text Here Your Text Here
For details, refer ATTACHMENT XX – NOC REGISTER
Detailed Engineering
Procurement Support
Sub-contracting
Engineering 100%
Change above table as per your project Work Breakdown Structure (WBS).
Following are the highlights of Home Office activities during the week;
➢ PROCESS
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ HSE
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ QUALITY
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ PIPELINE
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ MECHANICAL (ROTARY)
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ MECHANICAL (STATIC)
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ MECHANICAL (PACKAGE)
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ INSTRUMENTATION
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
13 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar
Weekly Progress Report - Template 000
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ ELECTRICAL
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ TELECOM
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ OTHER DISCIPLINE
• Add as per your Project.
2. CUMULATIVE DELIVERABLE STATUS SUMMARY (CLASS WISE)
Class - 1
Class - 2
Class - 3
Class - 4
Total
Class - 1
Class - 2
Class - 3
Class - 4
Total
HSE
Instrumentation
Mechanical Package
Mechanical Rotary
Mechanical Static
Pipeline
Piping
Process
Telecom
7. DELIVERABLES RESPONDED DURING THIS WEEK BY COMPANY WITH REVIEW / APPROVAL CODE
Piping
Process
Telecom
Total
TQ
Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act
Equipment
Bulks Materials
Overhead Lines
Total:
Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act
Engineering
Construction
Pre-comm./
Comm.
Others
Total:
Change all above tables as per your project Work Breakdown Structure (WBS).
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Following are the major activities planned for Home Office activities during the next week;
➢ PROCESS
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ MECHANICAL (PACKAGE)
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ INSTRUMENTATION
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ ELECTRICAL
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ TELECOM
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ OTHER DISCIPLINES
• Add as per your Project.
Bulks Materials
Overhead Lines
Procurement 100%
Change above table as per your project Work Breakdown Structure (WBS).
Following are the highlights of Procurement activities during the week;
2. Pre-Order
Equipment (Static/Rotary)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Bulks Materials
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline/ Flow lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Overhead Lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
3. Post-Order
Note: I would suggest segregating activtiies e.g. FAT Complete, Ex-Wors Delivery, Received at Local Port,
Received at Site etc. for each WBS element
Equipment (Static/Rotary)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Bulks Materials
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline/ Flow lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Overhead Lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Overhead Lines
Total
Issue Purchase Order Manufacturing Final acceptance EXW FOB delivery Material Receipt at site
Description Scope
Plan Rec Act Plan Rec Act Plan Rec Act Plan Rec Act Plan Rec Act
Equipment
(Static/Rotary)
Bulks Materials
Pipeline/ Flow lines
Overhead Lines
Total
Change above table as per your project requirments, Work Breakdown Structure (WBS) and Rule of Credit.
Following are the highlights of Procurement activities during the week;
5. CRITICAL EQUIPMENT & MATERIALS (Long Lead Items) STATUS
➢ Pumps
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ Package Equipment
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ ESD Valves
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ DCS System
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ Power Skids
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ Others
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Following major activities are planned for Procurement activities during the next week;
6. Pre-Order
Equipment (Static/Rotary)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Bulks Materials
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline/ Flow lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Overhead Lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
7. Post-Order
Note: I would suggest segregating activtiies e.g. FAT Complete, Ex-Wors Delivery, Received at Local Port,
Received at Site etc. for each WBS element
Equipment (Static/Rotary)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Bulks Materials
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline/ Flow lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Overhead Lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Change above table as per your project Work Breakdown Structure (WBS).
Following are the highlights of Construction activities during the week;
2. General:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Concrete Works M3
Structural Fabrication MT
Structural Erection MT
Equipment Erection MT
A/G Piping -Fabrication ID
A/G Piping - Erection ID
U/G Piping - Laying ID
Cable Laying - Electrical KM
Cable Laying - Instrumentation KM
Cable Laying - Telecom (incl.FOC) KM
Export Line KM
Overheal Lines (132kV) KM
Overheal Lines (33kV) KM
Asphalt Roads KM
Any other -
Change above table and below activities breakdown as per your project scope and WBS.
Following are the highlights of Construction activities during the week;
Pre-fabrication (Piping/Steel) Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Concreting Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Road Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Electrical Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Instrumentation Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Telecom Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
25 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar
Weekly Progress Report - Template 000
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
7. Pre-Commissioning:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
8. Commissioning:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Following major activities for Construction are planned during the next week;
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Concreting Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
26 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar
Weekly Progress Report - Template 000
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Road Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Electrical Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Instrumentation Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Telecom Works:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
10. Pre-Commissioning:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
11. Commissioning:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
2. Monthly Accrual
Provisional Sum
Optional Sum
TOTAL
*Updated on Monthly Basis however, mention for reference from last month.
3. MANAGEMENT OF CHANGE
Impact Assessment
Description of Variation Originator Issue Date Status
Cost Schedule
(*$1,000) (days)
Average Time
MoC Process Performance
(days)
Evaluation N/A
Approval / Rejection N/A
Submitted
Under evaluation
Waiting for approval
Approved
Rejected
5. INSPECTION STATUS
NCR
CAR
Total:
CONTRACTOR to Company
9. ATTACHMENTS:
Following attachments as indicative however change as per your project requirements.