0% found this document useful (0 votes)
355 views

Structure Drawings PDF

This document contains a list of structural drawings for a key plan. It includes the drawing name, scale, revision date if applicable, and any remarks for each drawing. Some of the listed drawings include a site location plan at a scale of 1:500, foundation plan at a scale of 1:100, and floor plans, elevations and sections at scales of 1:100. The list provides an overview of the structural drawings that make up the key plan.

Uploaded by

xyzhyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
355 views

Structure Drawings PDF

This document contains a list of structural drawings for a key plan. It includes the drawing name, scale, revision date if applicable, and any remarks for each drawing. Some of the listed drawings include a site location plan at a scale of 1:500, foundation plan at a scale of 1:100, and floor plans, elevations and sections at scales of 1:100. The list provides an overview of the structural drawings that make up the key plan.

Uploaded by

xyzhyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

KEY PLAN

LIST OF STRUCTURAL DRAWINGS P16 E W

)
ZE
35
90
REV. REV. REV. Site Location

SI
DWG. DWG. DWG. P1 0

T
(P
DATE DATE DATE

O
DWG NAME SCALE REMARKS DWG NAME SCALE REMARKS DWG NAME SCALE REMARKS

TOWER
L

LIMIT
L

PLOT
O

LIMIT
(P
T
SI

0
NO NO. NO NO. NO NO.

10
ZE

25
)
36 TOWER

LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
S000 SERIES (00-09) – GENERAL PROJECT INFORMATION S101 SERIES (101-199) –COLUMNS PLANS DRAWINGS S300 SERIES (300-399) – SLABS LAYOUTS DRAWINGS T

(P
SI
C18

PLOT
LIMIT
TOWER

ZE
LIMIT

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
S200 SERIES (200-299) – FOUNDATION PLANS & DETAILS DRAWINGS DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.

S400 SERIES (400-499) – PROJECT DETAILS & SCHEDULES DRAWINGS 6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
S010 SERIES (10-99) – GENERAL NOTES AND TYPICAL DETAIL DRAWINGS NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

S500 SERIES (500-599) – SMALL BLOCK DRAWINGS KHADEM SAWAYAH RASHED AL MEHAIRI

EMPLOYER & PROJECT MANAGER


S150 – SHORING LAYOUT AND DETAILS

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


Fax: + E119712 6109785/3 e-mail:

CONSULTANT

PROJECT NAME & LOCATION


COMMERCIAL BUILDING FILE NO.

ZONE BANIYAS

SECTOR NO EB2_03 PLOT NO C17 1556

PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)

DRAWING TITLE :

PROJECT DRAWING LIST

DATE 16-09-2018 SCALE

DRAWING NO. S000

N.T.S
N SHEET:

NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL


KEY PLAN
N

E W

GENERAL NOTES :
P16

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. PLOT C17, SECTOR EB2_03
C15

NOTES

2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.


1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.

3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED. 6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE

4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018

5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL 00
REV. NO.
---------
DESCRIPTION
07-05-2018
DATE CHECKED APPROVED

DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION. OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI


6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED & EMPLOYER & PROJECT MANAGER

NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
9. SOIL INVESTIGATION TO BE PERFORMED BY THE CONTRACTOR AS PER THE TENDER DOCUMENTS. Tel:
Fax:
+ 9712 6962222
+ E119712 6109785/3
P.O.Box:
e-mail:
939 Abu Dhabi

10. GEOPHYSICAL INVESTIGATION TO BE DONE AS PER LOCAL AUTHORITIES REQUIREMENTS. CONSULTANT

11. IT IS THE CONTRACTOR’S RESPONSIBILITY TO CHECK THE BEARING CAPACITY AND ITS ABILITY TO SUPPORT THE
STRUCTURE AND THE UNDERGROUND WATER TANK WITHOUT PROJECT NAME & LOCATION
COMMERCIAL BUILDING FILE NO.

ANY SETTLEMENT. IF RE-DESIGN IS REQUIRED, IT IS TO BE DONE BY THE CONTRACTOR WITH CONSULTANT’S ZONE BANIYAS

APPROVAL AT NO EXTRA COST OR TIME. SECTOR NO EB2_03 PLOT NO C17 1556

12. MINIMUM NO. OF BOREHOLES FOR SOIL TEST IS 4 OUT OF WHICH 3 TO A DEPTH OF 25 METERS AND 1 TO A DEPTH OF PROJECT DESCRIPTION

30 METERS BELOW GROUND LEVEL WITH AT LEAST 2 METERS IN THE ROCK STRATA (DEPTH MAY INCREASE DEPENDS UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +
3 TYPICAL FLOORS + ROOF FLOOR

ON THE PRESENCE OF BASEMENT OR NATURE OF THE PLOT) (COMMERCIAL BUILDING)

13. ALL CONCRETE IN CONTACT WITH SOIL AND BELOW THE PLINTH LEVEL SHALL BE SRC OR AS RECOMMENDED BY THE
DRAWING TITLE :

SOIL INVESTIGATION REPORT.


14. ALL PLAIN CEMENT CONCRETE IN CONTACT WITH SOIL TO BE LAID ON A COMPACTED SOIL AND A LAYER OF POLYTHENE
SHEET GAUGE 1000 SHOULD BE APPLIED.
15. DEWATERING TO BE DONE IF REQUIRED, DEPENDING ON THE WATER TABLE LEVEL AND THE SOIL REPORT. DRAWING ABBREVIATIONS AND SYMBOLS

16. FOR GEOPHYSICAL SITE INVESTIGATION, THE CONTRACTOR TO PERFORM THE TEST AS PER TENDER 16-09-2018
DATE SCALE

DOCUMENTS AND LOCAL AUTHORITIES REQUIREMENTS.


DRAWING NO. S002

N SHEET: N.T.S
NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL


KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
B) DESIGN CODES: 4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

EMPLOYER & PROJECT MANAGER

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


Fax: + E119712 6109785/3 e-mail:

CONSULTANT

PROJECT NAME & LOCATION


COMMERCIAL BUILDING FILE NO.

ZONE BANIYAS

SECTOR NO EB2_03 PLOT NO C17 1556

PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)

DRAWING TITLE :

* DESIGN Criteria:
(A) LOADS CONSIDERED FOR DIFFERENT FLOORS. GENERAL NOTES
- MINIMUM BEND DIAMETERS:

DATE 16-09-2018 SCALE

DRAWING NO. S010

N SHEET: N.T.S
NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL


KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
Typical Detail for Parapet Section(Height as per Architectural Drawings) Typical Detail for Parapet Section(Height as per Architectural Drawings)
Scale 1:25 Scale 1:25 01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI



≥ Typical Detail For Continuous Beams
Scale 1:50
TYP. CONNECTION BETWEEN PLANTED COLUMN
AND SLAB
EMPLOYER & PROJECT MANAGER
Scale 1:25

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi

Typical Detail For Cantilever Slab Fax: + E119712 6109785/3 e-mail:


Scale 1:50
CONSULTANT

Typical Detail For Cantilever Beam Typical Detail For Placement of Additional
Scale 1:50 Reinforcement above columns
Scale 1:50

Typical Detail For Simple Beam PROJECT NAME & LOCATION


TYPICAL DETAIL FOR TOP
Scale 1:50 & BOTTOM MESH ENDS
COMMERCIAL BUILDING
AT SLAB EDGES
FILE NO.
Scale 1:25

ZONE BANIYAS

SECTOR NO EB2_03 PLOT NO C17 1556

PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)

DRAWING TITLE :

Typical Detail For Continuous Tie Beams


Scale 1:50

OPENING IN SHEAR WALL


Scale 1:25

Typical Detail For Rft.


Around Slabs Openings
TYPICAL DETAIL DRAWINGS
PERSPECTIVE VIEW OF Scale 1:25

COLUMN-BEAMS CONNECTION

DATE 16-09-2018 SCALE

DRAWING NO. S020

N SHEET: N.T.S
NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

Typical ROOF BEAM/COLUMN


JOINT DETAIL
Scale 1:50
Typical FLOOR BEAM/COLUMN
JOINT DETAIL
Scale 1:50
KEY PLAN
N

P16 E W

S
A* A B C D E F G H I J K L M N O P Q R S T

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
17 01 --------- 26-06-2018
00 --------- 07-05-2018
C4 C4 W9 REV. NO. DESCRIPTION DATE CHECKED APPROVED
W9 W9 W7 C2
16 OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

15 W6
EMPLOYER & PROJECT MANAGER

14

W6

13 W6 W7

12 W6
Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi
Fax: + E119712 6109785/3 e-mail:
11
CONSULTANT

W4
10
PROJECT NAME & LOCATION

9 COMMERCIAL BUILDING FILE NO.


W6 W4
CW W6 ZONE
8 BANIYAS

SECTOR NO EB2_03 PLOT NO C17 1556


7
PROJECT DESCRIPTION

W6 W6 W6 W6
UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +
6
3 TYPICAL FLOORS + ROOF FLOOR
W1 W6
(COMMERCIAL BUILDING)
5
4

DRAWING TITLE :

3 W1

W3
W1 W1 W3 W3 W3
COLUMNS LAYOUT AT GROUND FLOOR

C3 C2

DATE 16-09-2018 SCALE


1

DRAWING NO. S101


1*

SHEET:
1:100
N
NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

1 Columns Layout at Ground Floor


S104 SCALE 1:100
KEY PLAN
N

P16 E W
A* A B C D E F G H I J K L M N O P Q R S T
S

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
17 02 --------- 16-09-2018
01 --------- 26-06-2018
C4 W7 00 --------- 07-05-2018
C4 W9 W9 W9 C2
16 REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

15
W6
EMPLOYER & PROJECT MANAGER

14

W6

13 W6 W7

12 W6

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


11
Fax: + E119712 6109785/3 e-mail:

CONSULTANT

10
W5
9 PROJECT NAME & LOCATION
W6 CW W6 COMMERCIAL BUILDING FILE NO.
8
ZONE BANIYAS

7 SECTOR NO EB2_03 PLOT NO C17 1556

PROJECT DESCRIPTION
W6 W6 W6 W6
6
W6 UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +
5 3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)
4

DRAWING TITLE :
W5
3

W2 W3
W3 W3 W3
COLUMNS LAYOUT AT MEZZANINE FLOOR
C3 C2

1 DATE 16-09-2018 SCALE

1* DRAWING NO. S102

1:100
N SHEET:

NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

1 Columns Layout at Mezz Floor


S104 SCALE 1:100
KEY PLAN
N
A* A B C D E F G H I J K L M N O P Q R S T E W
P16

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
17 LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018

W8 W7 01 --------- 26-06-2018
W8 W9 W9 W9 C2
16 00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

15
W6

EMPLOYER & PROJECT MANAGER

14

W6

13 W6 W7

12 W6

11 Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


Fax: + E119712 6109785/3 e-mail:

CONSULTANT

10
W5
9
W6 CW PROJECT NAME & LOCATION
W6
8 COMMERCIAL BUILDING FILE NO.

ZONE BANIYAS
7
SECTOR NO EB2_03 PLOT NO C17 1556

W6 PROJECT DESCRIPTION
W6 W6 W6
6
W6
UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +
5
3 TYPICAL FLOORS + ROOF FLOOR
4 (COMMERCIAL BUILDING)

W5
DRAWING TITLE :
3

W3 W3 W3
W3
W2

C5 C2 COLUMNS LAYOUT AT TYPICAL FLOORS

1
DATE 16-09-2018 SCALE

1*
DRAWING NO. S103

1:100
N SHEET:

NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

1 Columns Layout at Typical Floors


S104 SCALE 1:100
KEY PLAN
N

A* A B C D E F G H I J K L M N O P Q R S T P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
17 02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
16
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

15
EMPLOYER & PROJECT MANAGER

C1 C1
C1
C1
14

13

12

11 Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


Fax: + E119712 6109785/3 e-mail:

CONSULTANT

C1

10

9 PROJECT NAME & LOCATION


CW
COMMERCIAL BUILDING FILE NO.
8
ZONE BANIYAS

7 SECTOR NO EB2_03 PLOT NO C17 1556

PROJECT DESCRIPTION
C2 C2 C1

6
UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +
5 3 TYPICAL FLOORS + ROOF FLOOR
4 (COMMERCIAL BUILDING)

DRAWING TITLE :
3

COLUMNS LAYOUT AT ROOF FLOOR

1
DATE 16-09-2018 SCALE

1*
DRAWING NO. S104

1:100
N SHEET:

NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

1 Columns Layout at Roof Floor


S104 SCALE 1:100
KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T

A* A B C D E F G H I J K L M N O P Q R S T SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018

17 00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME
16
KHADEM SAWAYAH RASHED AL MEHAIRI

EMPLOYER & PROJECT MANAGER

15

14

13
Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi
12
Fax: + E119712 6109785/3 e-mail:

11 CONSULTANT

PROJECT NAME & LOCATION


10
COMMERCIAL BUILDING FILE NO.

9 ZONE BANIYAS
8
SECTOR NO EB2_03 PLOT NO C17 1556

7 PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
6 (COMMERCIAL BUILDING)
5
4
DRAWING TITLE :

SHORING LAYOUT & DETAILS

DATE 16-09-2018 SCALE

1
DRAWING NO. S150

1* 1:100
N SHEET:

NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL


Temporary Shoring line

1 SHORING LAYOUT AND DETAILS


S150 SCALE 1:100
KEY PLAN
N
A* A B C D E F G H I J K L M N O P Q R S T
P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


SCHEDULE OF FOUNDATION BEAMS NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
REINFORCEMENT 3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.

BOTTOM TOP STIRRUPS 4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
17 NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018

FB1 FB1 FB1 FB1 01 --------- 26-06-2018


FB1 FB1
16 00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

15
CP1

FB1
EMPLOYER & PROJECT MANAGER

FB1
14 900
-0.50

13

12 CP1
RW2
11
CP1 Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi

FB1
Fax: + E119712 6109785/3 e-mail:
FB1

RW2
CONSULTANT

10
RW2
9

B1
RW2 RW PROJECT NAME & LOCATION
8 COMMERCIAL BUILDING FILE NO.

ZONE BANIYAS
7 CP1

FB1
SECTOR NO EB2_03 PLOT NO C17 1556
FB1

RW L
CP1 RW RW2 PROJECT DESCRIPTION
6
L
RW

5 UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
4 (COMMERCIAL BUILDING)
900
-3.45
FB1

RW2 RW
3 DRAWING TITLE :

2
FB1

FOUNDATION LAYOUT&DETAILS
S

1 FB1 FB1
FB1 RW RW RW RW RW
S
DATE 16-09-2018 SCALE

1*
DRAWING NO. S200

1:100
N SHEET:
A = 2.5m b1 = T 12 @ 150 t1 = T 12 @ 150 NORTH POINT

LA
QIB
B = 3.0m b2 = T 16 @ 150 t2 = T 16 @ 150
OF: -
C = 3.5m b3 = T 20 @ 150 t3 = T 20 @ 150
D = 4.0m b4 = T 25 @ 150 FOR MUNICIPALITY APPROVAL

E = 5.0m
F = 6.0m
G= 7.0m
K= 8.0m
L= 12.0m

1 FOUNDATION LAYOUT&DETAILS
S104 SCALE 1:100
KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
A* A B C D E F G H I J K L M N O P Q R S T 3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

17 KHADEM SAWAYAH RASHED AL MEHAIRI

FB1 FB1 FB1 FB1 FB1 FB1


16

EMPLOYER & PROJECT MANAGER

GB1
15
150

FB1
FB1
+0.20
GB2
GB2 GB2 GB2
150
14
+0.20
GB2

13 GB2

12 GB2 Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


RW2 Fax: + E119712 6109785/3 e-mail:
GB1 RW2 GB2
11

FB1
CONSULTANT
150
FB1

+0.20 GB2
GB2

10 GB2 350 (LIFT PIT)


-1.50( TO BE COORDINATED WITH MEP) GB2

FB1
9 PROJECT NAME & LOCATION
RW2 RW2
8 COMMERCIAL BUILDING FILE NO.
GB2
RW GB2 ZONE BANIYAS
150
7

FB1
+0.20
SECTOR NO EB2_03 PLOT NO C17 1556
FB1

GB1
RW RW2
GB1 RW
6 PROJECT DESCRIPTION
GB1 RW

5
4 UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +
3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)
FB1

GB2
RW2
GB2
3
250 RW
2 +0.20
GB1 DRAWING TITLE :
FB1

1 FB1 FB1
FB1 RW RW RW RW RW

1* GROUND FLOOR SLAB

DATE 16-09-2018 SCALE

DRAWING NO. S300

1:100
N SHEET:

NORTH POINT

LA
QIB
OF: -

SCHEDULE OF GROUND BEAMS FOR MUNICIPALITY APPROVAL

REINFORCEMENT
BOTTOM TOP STIRRUPS

1 Ground Floor Slab


S301 SCALE 1:100
KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15
A* A B C D E F G H I J K L M N O P Q R S T
PLOT C17, SECTOR EB2_03
NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
17 REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME
DB2 DB2 DB2 DB2 DB2
16
KHADEM SAWAYAH RASHED AL MEHAIRI

15 EMPLOYER & PROJECT MANAGER

DB2
DB2
14
250
+4.30

13

12

11
Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi

DB2
DB2 Fax: + E119712 6109785/3 e-mail:

CONSULTANT
10
PC

DB3
9
8

DB4 DB4
PROJECT NAME & LOCATION
7
COMMERCIAL BUILDING FILE NO.

DB2
DB2

ZONE BANIYAS
CP1
6
CP1
SECTOR NO EB2_03 PLOT NO C17 1556
5
4
PROJECT DESCRIPTION
DB3

PC
UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +
3 3 TYPICAL FLOORS + ROOF FLOOR

DB2
(COMMERCIAL BUILDING)
2
DB1

DRAWING TITLE :
PC

1 DB2 DB2
DB2 DB3 DB2 DB2

1*

MEZZANINE FLOOR SLAB

DATE 16-09-2018 SCALE

DRAWING NO. S301

1:100
N SHEET:

SCHEDULE OF BEAMS NORTH POINT

LA
QIB
REINFORCEMENT OF: -
BOTTOM TOP STIRRUPS
FOR MUNICIPALITY APPROVAL

A = 2.5m b1 = T 12 @ 200 t1 = T 12 @ 200


B = 3.0m b2 = T 14 @ 200 t2 = T 16 @ 200
C = 3.5m t3 = T 20 @ 200
D = 4.0m t4 = T 25 @ 200
E = 5.0m
F = 6.0m

1 Mezzanine Floor Slab G = 7.0m


H = 8.0m
S302 SCALE 1:100
KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15
A* A B C D E F G H I J K L M N O P Q R S T
PLOT C17, SECTOR EB2_03
NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
17 REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME
16
CDB2 CP1
PC DB6
KHADEM SAWAYAH RASHED AL MEHAIRI

15 EMPLOYER & PROJECT MANAGER

DB2
14
250
+7.60

13

12

11
Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi

DB2
Fax: + E119712 6109785/3 e-mail:

CONSULTANT
10

9
8
CP1
DB4 DB4
PROJECT NAME & LOCATION
7
COMMERCIAL BUILDING

DB2
FILE NO.

ZONE BANIYAS
CP1
6
CP1
SECTOR NO EB2_03 PLOT NO C17 1556
5
4
PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3
3 TYPICAL FLOORS + ROOF FLOOR

DB2
(COMMERCIAL BUILDING)
2

DRAWING TITLE :

PC CDB1 DB5
1

1*

FIRST FLOOR SLAB

DATE 16-09-2018 SCALE

DRAWING NO. S302

1:100
N SHEET:

SCHEDULE OF BEAMS NORTH POINT

LA
QIB
REINFORCEMENT OF: -
BOTTOM TOP STIRRUPS
FOR MUNICIPALITY APPROVAL

A = 2.5m b1 = T 12 @ 200 t1 = T 12 @ 200


B = 3.0m b2 = T 14 @ 200 t2 = T 16 @ 200
C = 3.5m t3 = T 20 @ 200
D = 4.0m t4 = T 25 @ 200
E = 5.0m
F = 6.0m

1 First Floor Slab G = 7.0m


H = 8.0m
S303 SCALE 1:100
KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15
A* A B C D E F G H I J K L M N O P Q R S T PLOT C17, SECTOR EB2_03
NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
DB7 REV. NO. DESCRIPTION DATE CHECKED APPROVED
17

CDB4

CDB3
OWNER NAME

16
CP1 KHADEM SAWAYAH RASHED AL MEHAIRI

EMPLOYER & PROJECT MANAGER


15

DB7

DB2
14
250
+AS PER ARCH

13
CDB3

12

11
Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi
DB7

DB2
Fax: + E119712 6109785/3 e-mail:

CONSULTANT
10

9
8
CDB3
DB4 DB4
PROJECT NAME & LOCATION
7 COMMERCIAL BUILDING

DB2
FILE NO.

ZONE BANIYAS
CP1
6
CP1
DB7

SECTOR NO EB2_03 PLOT NO C17 1556


5
4 PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 3 TYPICAL FLOORS + ROOF FLOOR
CDB3

DB2
(COMMERCIAL BUILDING)
2
DB7

DRAWING TITLE :

1*

TYPICAL FLOOR SLABS

DATE 16-09-2018 SCALE

DRAWING NO. S303


SCHEDULE OF BEAMS
REINFORCEMENT 1:100
SHEET:
BOTTOM TOP STIRRUPS N
NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

A = 2.5m b1 = T 12 @ 200 t1 = T 12 @ 200


B = 3.0m b2 = T 14 @ 200 t2 = T 16 @ 200
C = 3.5m t3 = T 20 @ 200
D = 4.0m t4 = T 25 @ 200
E = 5.0m
F = 6.0m

1 Typical Floor Slabs G = 7.0m


H = 8.0m
S304 SCALE 1:100
KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

A* A B C D E F G H I J K L M N O P Q R S T C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
17
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME
16
CP1
KHADEM SAWAYAH RASHED AL MEHAIRI

15 EMPLOYER & PROJECT MANAGER


DB7

DB2
PC PC PC
14
PC
300
+18.40

13
CDB3

12

11

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi

DB2
Fax: + E119712 6109785/3 e-mail:

10 CONSULTANT
DB7

9
8
CDB3
DB4 DB4

7 PROJECT NAME & LOCATION

DB2
COMMERCIAL BUILDING FILE NO.

CP1 PC ZONE BANIYAS


PC CP1 PC
6
DB7

5 SECTOR NO EB2_03 PLOT NO C17 1556


4
PROJECT DESCRIPTION

3 CDB3
UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +
3 TYPICAL FLOORS + ROOF FLOOR

DB2
2 (COMMERCIAL BUILDING)
DB7

DRAWING TITLE :
CP1 CP1 CP1

1*

ROOF FLOOR SLAB

DATE 16-09-2018 SCALE

DRAWING NO. S304


SCHEDULE OF BEAMS
REINFORCEMENT 1:100
SHEET:
BOTTOM TOP STIRRUPS N
NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

A = 2.5m b1 = T 12 @ 200 t1 = T 12 @ 200


B = 3.0m b2 = T 14 @ 200 t2 = T 16 @ 200
C = 3.5m t3 = T 20 @ 200
D = 4.0m t4 = T 25 @ 200
E = 5.0m
F = 6.0m
G = 7.0m

1 Roof Floor Slab H = 8.0m

S306 SCALE 1:100


KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
A* A B C D E F G H I J K L M N O P Q R S T C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME
17
KHADEM SAWAYAH RASHED AL MEHAIRI
16

EMPLOYER & PROJECT MANAGER

DB1 DB2 DB2

15

DB1
DB1
14
CDB1 CDB1

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


13 Fax: + E119712 6109785/3 e-mail:

DB1

DB1
12 CONSULTANT

CDB1 DB1
11

+22.75
PROJECT NAME & LOCATION
200 COMMERCIAL BUILDING FILE NO.

DB2
+21.75
DB1 DB1 ZONE BANIYAS

DB2
10

9 SECTOR NO EB2_03 PLOT NO C17 1556

8 PROJECT DESCRIPTION

DB2 DB2

7 UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)

5 DRAWING TITLE :
4

3
TOP ROOF FLOOR SLAB
2

DATE 16-09-2018 SCALE

DRAWING NO. S305

1 1:100
N SHEET:

1* NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

SCHEDULE OF BEAMS
REINFORCEMENT
BOTTOM TOP STIRRUPS

1 Top Roof Floor Slab


S307 SCALE 1:100
KEY PLAN
N

NOTE : NO OF STEPS TO BE AS PER ARCH DWGS. P16 E

S
W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.

250
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

EMPLOYER & PROJECT MANAGER

R.C.C

250
T16@15CM C/C TOP AND BOT
25 CM THICK
T16@15CM C/C TOP AND BOT

T16@15CM C/C TOP AND BOT


-1.00 F.F.L.

-2.60 F.F.L.

T16@15CM C/C TOP AND BOT Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi
Fax: + E119712 6109785/3 e-mail:

CONSULTANT

R.C.C

250
PROJECT NAME & LOCATION
COMMERCIAL BUILDING FILE NO.

ZONE BANIYAS

1 SECTOR NO EB2_03 PLOT NO C17 1556


SCALE: 1:50
PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)

250
DRAWING TITLE :

TYPICAL STAIR DETAILS (2FLIGHTS STAIR)

DATE 16-09-2018 SCALE

DRAWING NO. S400

1:100
N SHEET:

NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

Typical Stair Detail ( 2 flights stair )


Dowels from Raft Foundation
KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

EMPLOYER & PROJECT MANAGER

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


Fax: + E119712 6109785/3 e-mail:

CONSULTANT

PROJECT NAME & LOCATION


COMMERCIAL BUILDING FILE NO.

ZONE BANIYAS

SECTOR NO EB2_03 PLOT NO C17 1556

PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)

DRAWING TITLE :

(CORE WALL - CW)

DATE 16-09-2018 SCALE

DRAWING NO. S401


(CORE WALL - CW) 1:100
SCALE : 1/25 N SHEET:

NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL


KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

COLUMNS' DETAILS PLOT C17, SECTOR EB2_03


C15

NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.

LEVELS
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.

AS PER LAYOUTS NOTES 5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.

MARKS 7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
COLUMN (C1) OWNER NAME

SCALE : 1/25
KHADEM SAWAYAH RASHED AL MEHAIRI

EMPLOYER & PROJECT MANAGER

COLUMN (C2)
SCALE : 1/25

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


Fax: + E119712 6109785/3 e-mail:

CONSULTANT

COLUMN (C3) PROJECT NAME & LOCATION


COMMERCIAL BUILDING FILE NO.
SCALE : 1/25
ZONE BANIYAS

SECTOR NO EB2_03 PLOT NO C17 1556

PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)

DRAWING TITLE :
COLUMN (C4)
SCALE : 1/25

COLUMNS DETAILS

DATE 16-09-2018 SCALE

COLUMN (C5) DRAWING NO. S402

SCALE : 1/25 1:25


N SHEET:

NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL


KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

EMPLOYER & PROJECT MANAGER

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


Fax: + E119712 6109785/3 e-mail:

CONSULTANT

PROJECT NAME & LOCATION


COMMERCIAL BUILDING FILE NO.

ZONE BANIYAS

SECTOR NO EB2_03 PLOT NO C17 1556

PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)

DRAWING TITLE :

SHEAR WALL DETAILS-1

DATE 16-09-2018 SCALE

DRAWING NO. S403

1:100
N SHEET:

NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

1 Shear Wall Details-1


S104 SCALE 1:100
KEY PLAN
N

P16 E W

)
ZE
35
90
Site Location

SI
P1 0

T
(P

O
TOWER

LO
LIMIT

PLOT
LIMIT
(P
T
SI

0
10
ZE

25
)
36
TOWER
LIMIT
PLOT
LIMIT

C17

)
ZE
00
TOWER

LIMIT
PLOT
LIMIT

SI
(P

T
LO

LO
T

(P
SI
C18

PLOT
LIMIT
TOWER
LIMIT

ZE

0
00
)
P18

25
C19

C15

PLOT C17, SECTOR EB2_03


NOTES
1. THESE DRAWINGS WILL NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE STATED.
4. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY / CONCRETE UNLESS OTHERWISE NOTED.
5. FOR DIMENSIONS & LOCATIONS OF STRUCTURAL MEMBERS/ELEMENTS, REFER THE RELEVANT STRUCTURAL
DRAWINGS. DISCREPANCIES, IF ANY, ARE TO BE BROUGHT TO THE NOTICE OF THE ENGINEER PRIOR TO EXECUTION.
6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS OF THE SAME & OTHER DISCIPLINES.
7. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT DETAILS & MATERIAL DESCRIPTIONS ARE TO BE REVIEWED &
NOTES APPEARING ON ANY ONE DRAWING ARE TO BE APPLIED TO ALL RELATED DRAWINGS & DETAILS.
8. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR & WALL SLEEVES & SHAFTS / CUT-OUTS IN CONCRETE
SLABS WITH M.E.P., STRUCTURAL & ARCHITECTURAL DRAWINGS & ANY DISCREPANCY SHALL BE BROUGHT TO THE
NOTICE OF ENGINEER PRIOR TO EXECUTION.
NOTE: FOR ALL SLAB THICKNESS & STAIRCASE
LANDING REFER TO STRUCTURAL DRAWINGS
02 --------- 16-09-2018
01 --------- 26-06-2018
00 --------- 07-05-2018
REV. NO. DESCRIPTION DATE CHECKED APPROVED
OWNER NAME

KHADEM SAWAYAH RASHED AL MEHAIRI

EMPLOYER & PROJECT MANAGER

Tel: + 9712 6962222 P.O.Box: 939 Abu Dhabi


Fax: + E119712 6109785/3 e-mail:

CONSULTANT

PROJECT NAME & LOCATION


COMMERCIAL BUILDING FILE NO.

ZONE BANIYAS

SECTOR NO EB2_03 PLOT NO C17 1556

PROJECT DESCRIPTION

UNDERGROUND PUMP ROOM + GROUND + MEZZANINE +


3 TYPICAL FLOORS + ROOF FLOOR
(COMMERCIAL BUILDING)

DRAWING TITLE :

Shear Wall Details-2

DATE 16-09-2018 SCALE

DRAWING NO. S404

SHEET:
1:100
N
NORTH POINT

LA
QIB
OF: -

FOR MUNICIPALITY APPROVAL

1 Shear Wall Details-2


S104 SCALE 1:100