How To Check Possible Causes If MRP Does Not Create Any Proposals
How To Check Possible Causes If MRP Does Not Create Any Proposals
any proposals
The MRP sometimes does not create any proposals, e.g. planned order, purchase requisition, schedule lines, even
though there is shortage for requirements. The root causes are not so clear.
Please create the planning file entry in MD20 or make some changes of MRP related object in order to set the flag.
Running the transaction MDAB can automatically detect the missing planning file entries and create them but this
does not set the NETCH indicators for the existing planning file entries.
Normally the planning file entry will be created automatically while the material is created or set the flag
automatically when user make changes of MRP related.
Input the plant and MRP group, then click the button 'Safety Stock', then the screen below is displayed.
If there is a value in the field 'Share SStk' as above, this means that the percentage of the safety stock can be
used to cover the requirement.
e.g. there is a requirement of safety stock 100, and the 'Share SStk' has the value 100 in the OPPR, then the
quantity 100 * 100% = 100 will be used to cover its requirement. Since this can cover the safety stock itself no
proposals are needed.
In this case, please check if the MRP group is maintained for the material, if yes, then go to the customization
below to check if the PIRs lie in the period of Adjustment.
SPRO > Production > Production Planning > Demand Management > Planned Independnet Requirements >
Maintain consumption mode and period of adjustment.
Double clikc the line for the plant and MRP goup, the screen below is displayed.
The 'Adjustment: Planned Ind. Reqmts' value 1 means that the period is calculated forward from today and the
field 'Adjustment Period: PIRs' is the period by working days.
E.g. Today is 29.09.2011, plus 7 working days forward it goes to 10.10.2011. Since the PIRs lie before this date
they are not included in the MRP calculation and no proposals can be created for them.
There is dependent requirements (Order Reservations in this case) with quantity 100 in the screen below, but no
proposal is created.
After checking, it is turned out that the value 1 'Materials for dependent requirements are not planned' in the field
'MRP dep.requirements' of MRP 4 view of the masterial master as below.
Resetting the the field can create the proposals by MRP.
In the example above, sales order 14144 is displayed but is not considered in MRP (No quantity is reflected in
column 'Available Qty'.
It happens because the field 'No MRP' has value 1 'Requirement not planned, but displayed' in customization
transaction OVZG as above for the requirement class of the sales document.
If that is blank, the sales document can be planned by MRP. If that has value 2, the sales document doesn't
appear in transaction MD04.
To get the requirement class of sales document, check requirement type in field BEDAE of table VBAP, go to
customization transaction OVZH as following to find the requirement class by requirement type.
Then, the class, e.g. 030 in this example, can be checked in transaction OVZG.
In addition, the sales order is not considered in MRP if the schedule line category which doesn't allow MRP is set
in the order even though field 'No MRP' is set to consider it in transaction OVZG for requirement class. In screen
shot below, CP is the one allows MRP, CN doesn't.