Inspection Checklist For Acmv Services Project

The document is an inspection checklist for air conditioning and mechanical ventilation (ACMV) services with sections to check ductwork and pipework. It lists 13 items to inspect for ductwork including using approved materials, proper installation, sizes, joints, supports, insulation, fire rating, acoustic treatment, splitters, dampers, vents, leakage tests and balancing tests. It also lists 12 items to check for pipework such as approved materials, installation, sizes, joints, supports, insulation, accessories, painting, pressure tests and balancing tests. The checklist is to be signed by the engineer and client's representative to verify completion.

Uploaded by

Kannan Kamal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
170 views

Inspection Checklist For Acmv Services Project

The document is an inspection checklist for air conditioning and mechanical ventilation (ACMV) services with sections to check ductwork and pipework. It lists 13 items to inspect for ductwork including using approved materials, proper installation, sizes, joints, supports, insulation, fire rating, acoustic treatment, splitters, dampers, vents, leakage tests and balancing tests. It also lists 12 items to check for pipework such as approved materials, installation, sizes, joints, supports, insulation, accessories, painting, pressure tests and balancing tests. The checklist is to be signed by the engineer and client's representative to verify completion.

Uploaded by

Kannan Kamal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Page 1 of 3

INSPECTION CHECKLIST FOR ACMV SERVICES

PROJECT :
Location : Conformance
to Specs./Stds
Start of Inspection Tick Cross Non-conformance Corrective Signature
Date : for for (with identity of Action / of Checker
Time : Yes/ No / Systems / Element/s) Taken & Date
End of Inspection OK! Not OK?
Date : OK! (Y/N)
Time :
Duct Work
Approved material (G.I.
1
sheet & insulation)
2 Install as per plan
3 Sufficient height
4 Correct sizes & gauges
5 Proper joint & seams
6 Type of support
Adequate support /
7
bracket
8 Proper insulation
9 method
Proper fire-rating (if
applicable)
10 Proper acoustic
treatment (if applicable)
Splitter, dampers, vents
11
provided
12 Leakage test
13 Balancing test
Pipe Work
1 Approved material
2 Install as per plan
3 Sufficient height/correct
level
4 Correct sizes
5 Proper joint
6 Type of support
Adequate support /
7
bracket
8 Proper insulation
9 Proper accessories
10 Painting
11 Hydraulic pressure test
12 Balancing test
Checked by : Date :
Name & Signature of Engineer / Foreman
Verified by : Date :
Name & Signature of Client's Representative