Art District MEP Observations
Art District MEP Observations
Electrical Works:
Page 1 of 3
23. Lighting shall be proposed at Staircase and lift shafts locations and this will feed the
supply from emergency DB.
24. In drawing Ladder type cable tray already proposed from shaft to DB at Terrace
location. The same shall be proposed from DB to outdoor units for cable Laying.
25. No details regarding lightning arrestor system and Earthing shall be proposed
separately.
26. No details regarding external lighting and power supply details. Outdoor type feeder
pillar recommended for external light power supply.
27. Emergency lighting arrangement needs to be provided for the complete building, lift
and stair areas.
1. Quantities of LED Monitors and location details not available in the drawing.
2. Master Controller proposed at basement service room location. Detailed
specification required for the same.
3. Storage details not provided in drawing.
4. Boom Barrier shall be auto function with 3-6 second opening.
5. Network switch shall be installed at separate free standing rack.
HVAC Works:
1. Legends not provided in fire protection schematic drawings. And detailed schematic
required like Distribution flow, symbol abbreviations etc….
2. Priming tank capacity details are mismatched. (In the schematic mentioned the
capacity of 3000 Ltr. but in Pump room layout drawing stated as 2000L Ltr.capacity).
3. In the drawing the Proposed Fire house cabinet at all floor FHC Shafts but not shown
in the first and second floor.
Page 2 of 3
Plumbing System
General Points:
1) Earlier Solar power panel proposed in DBR but Drawings are not provided.
2) Fire alarm system proposed in DBR but Details are not given.
3) As per my earlier suggestion/comments, please make provision for LV services like
telephone points and Internet Points. Drawings are required.
4) Need to propose a provision to cover shafts void at terrace location to protect
services room, equipment etc.. from rain.
5) GRIHA 3 Star Compliance statement all MEP works to be submitted
6) All MEP Works should comply with GRIHA 3 Star, NBC and other guidelines as per
RFP/Contract
Page 3 of 3