Various Forms 7300
Various Forms 7300
Location:
Concrete Strength:
Schedule Date: Actual Date:
Target Time: Actual Time:
Estimated Vol: Actual Vol:
INSPECTED /WITNESSED/CONFIRMED/APPROVED
Work Items
LEAD MAN PROJECT ENGINEER QC ENGINEER
Line/Grade/Elev.
Form/Rebar/Water
Embedded Items
Electrical
Mechanical
Safety
Others
RECOMMENDING APPROVAL
PROJECT MANAGER
CLIENT'S APPROVAL
APPROVAL AFTER INSPECTION/TESTING/SURVEY
REMARKS/COMMENTS
- APPROVED
- REJECTED
DATE:
PROJECT NAME: DATE:
LOCATION: 2nd Floor Area REF.NO. 4800139514
INSPECTION REQUEST
Activity:
Sir,
Please be informed that the above referenced activity will be commencing on:
DATE:
LOCATION:
Therefore, we are requesting for a joint inspection for the above on:
DATE:
LOCATION:
Requested by:
CLIENT'S APPROVAL
APPROVAL AFTER INSPECTION
REMARKS/COMMENTS
- APPROVED
- REJECTED
DESIGNATION
DATE:
REBAR CUTTING LIST Structure: Concrete Pedestal / Footing
Project Name MG 7300 N2 GAS PLANT PROJECT Prepared by: D.MANIPOL Revision 0 Doc. No. RCL - 001
Ref Dwg No. S-2 Approved by: JF.CORTEZ Status for approval Date: 3/17/2020
b
a
250 1050 150 12 1850 16 5 148.00
c c
F1
b
a
250 1250 150 12 2050 16 2 65.60
c c
F2
b 1250 16 1250 16 2 40.00
b
a 250 1650 150 12 2450 16 9 352.80
c c
F3
b 1650 16 1650 16 9 237.60
b
a 250 1650 150 12 2450 16 10 392.00
c c
F4
b 1650 16 1650 16 10 264.00
b
300 1650 20 1950 12 5 117.00
CP1
c
a 500 500 75 12 2150 14 5 150.50
b
c
a
500 170 75 12 1490 14 5 104.30
b
c
a 600 625 75 12 2600 14 8 291.20
b
CP2
b
400 1650 25 2050 16 6 196.80
c
a 600 690 75 12 2730 14 6 229.32
CP3 b
CP3
CP4
c
a 600 600 75 12 2550 14 3 107.10
b
CP5
c
a 690 625 75 12 2780 14 4 155.68
b
Project Name MG 7300 N2 GAS PLANT PROJECT Prepared by: D.MANIPOL Revision 0 Doc. No. RCL - 001
Ref Dwg No. S-2 Approved by: JF.CORTEZ Status for approval Date: 3/17/2020
b
a
250 1050 150 12 1850 16 5 148.00
c c
F1
b
a
250 1250 150 12 2050 16 2 65.60
c c
F2
b 1250 16 1250 16 2 40.00
b
a 250 1650 150 12 2450 16 9 352.80
c c
F3
b 1650 16 1650 16 9 237.60
b
a 250 2250 150 12 3050 16 10 488.00
c c
F4
b 2250 16 2250 16 10 360.00
b
300 1650 20 1950 12 5 117.00
CP1
c
a 500 500 75 12 2150 14 5 150.50
b
c
a
500 170 75 12 1490 14 5 104.30
b
c
a 600 625 75 12 2600 14 8 291.20
b
CP2
b
400 1650 25 2050 16 6 196.80
c
a 600 690 75 12 2730 14 6 229.32
CP3 b
CP3
CP4
c
a 600 600 75 12 2550 14 3 107.10
b
CP5
c
a 690 625 75 12 2780 14 4 155.68
b
c
a 350 300 75 12 1450 430 1 623.5
b
FTB1
b
a 350 75 12 850 430 1 365.5
c
GB1 a 320 220 75 12 1230 370 1 455.1
b
c
GB2 a 320 220 75 12 1230 90 1 110.7
b
Project Name MG 7300 N2 GAS PLANT PROJECT Prepared by: D.MANIPOL Revision 0 Doc. No. RCL - 002
Ref Dwg No. S-11, S-12 Approved by: JF.CORTEZ Status for approval Date: 3/17/2020
b
b
a b a 450 1750 16 200 2650 10 1 26.50
a a
aa b
b
b 450 1750 16 200 2650 10 1 26.50
a a a
V11
a b a 450 1750 16 200 2650 10 1 26.50
b
450 1800 16 200 2700 10 1 27.00
a a
PROJECT ENGINEER
CLIENT'S APPROVAL
APPROVAL AFTER INSPECTION/TESTING/SURVEY
- APPROVED
- REJECTED
DATE:
DATE:
REF.NO.
RCL - 04 -001
LIST
Bar Length to Quantity Waste Cut per Bar
be Used (Lengths) Length
10500 6.213017751479 600
Noted by:
PROJECT MANAGER
ING/SURVEY
REMARKS/COMMENTS
PROJECT NAME: FABRICATION & INSTALLATION OF PLATFORM DATE:
LOCATION: STORAGE TANK PLATFORM REF.NO. STP-001
PUNCH LIST
The following items shall be corrected to comply with the contract documents
Received by:
____________________________________
SIGNATURE OVER PRINTED NAME
PROJECT NAME: MG 7300 Gas Plant Project DATE:
LOCATION: CPIP Batino REF.NO.
REQUEST FOR INSPECTION
Name of Customer: Taiyo Nippon Sanso Philippines Inc.
Attention:
Activity:
Sir,
Please be informed that the above referenced activity will be commencing on:
DATE:
LOCATION:
Therefore, we are requesting for a joint inspection for the above on:
DATE:
LOCATION:
Requested by:
CLIENT'S APPROVAL
APPROVAL AFTER INSPECTION/TESTING/SURVEY
REMARKS/COMMENTS
- APPROVED
- REJECTED
DATE:
PROJECT NAME: DATE:
LOCATION: REF.NO. 4800139514
SITE INSTRUCTION
Activity:
DESIGNATION
DATE:
Length
Dia (mm) Qty (pcs) Unit price Amount Delivery Date
(m)
12 10.5 100 280 28,000.00 4/26/2017
16 10.5 100 498 49,800.00 4/26/2017
20 10.5 200 778 155,600.00 4/26/2017
25 10.5 160 1215 194,400.00 4/26/2017
45,500.00
F1
F2
F3
F4
F5
cold box 8.5 6.1 0.075 1 3.88875
F1 1.7 1.7 0.075 1 0.21675
F2 1.9 1.9 0.075 1 0.27075
F3 2.1 2.1 0.075 7 2.31525
F4 2.3 2.3 0.075 7 2.77725
F5 2.4 2.4 0.075 2 0.864
F6 2.7 2.7 0.075 2 1.0935
20 11.42625
13.7115
TRANSMITTAL SHEET
PROJECT : MG 14000 N2 Gas Plant Project TS NO. : 17-001-TNSPI
Jake Cortez
TAICHEM REPRESENTATIVE Signature over Printed Name
Date/Time