The document is a request for inspection of concrete pouring activities at a gas plant project in CPIP Batino. It provides details of the location, scheduled and actual dates, estimated and actual volumes, and signatures for approval or rejection of the pouring. Signatures are required from the lead man, project engineer, QC engineer, project manager, and client.

Uploaded by

Jake Cortez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

Various Forms 7300

The document is a request for inspection of concrete pouring activities at a gas plant project in CPIP Batino. It provides details of the location, scheduled and actual dates, estimated and actual volumes, and signatures for approval or rejection of the pouring. Signatures are required from the lead man, project engineer, QC engineer, project manager, and client.

Uploaded by

Jake Cortez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 19

PROJECT NAME: MG7300 N2 GAS PLANT PROJECT DATE:

LOCATION: CPIP BATINO REF.NO.


CONCRETE POURING REQUEST
Activity/Structure:

Location:
Concrete Strength:
Schedule Date: Actual Date:
Target Time: Actual Time:
Estimated Vol: Actual Vol:

INSPECTED /WITNESSED/CONFIRMED/APPROVED
Work Items
LEAD MAN PROJECT ENGINEER QC ENGINEER
Line/Grade/Elev.
Form/Rebar/Water
Embedded Items
Electrical
Mechanical
Safety
Others
RECOMMENDING APPROVAL

PROJECT MANAGER
CLIENT'S APPROVAL
APPROVAL AFTER INSPECTION/TESTING/SURVEY
REMARKS/COMMENTS

- APPROVED

- REJECTED

NAME & SIGNATURE:

DATE:
PROJECT NAME: DATE:
LOCATION: 2nd Floor Area REF.NO. 4800139514

INSPECTION REQUEST
Activity:

Sir,
Please be informed that the above referenced activity will be commencing on:
DATE:
LOCATION:

Therefore, we are requesting for a joint inspection for the above on:
DATE:
LOCATION:

Requested by:

PROJECT ENGINEER PROJECT MANAGER

CLIENT'S APPROVAL
APPROVAL AFTER INSPECTION
REMARKS/COMMENTS

- APPROVED

- REJECTED

INSPECTED & CHECKED BY:

DESIGNATION
DATE:
REBAR CUTTING LIST Structure: Concrete Pedestal / Footing

Project Name MG 7300 N2 GAS PLANT PROJECT Prepared by: D.MANIPOL Revision 0 Doc. No. RCL - 001

Ref Dwg No. S-2 Approved by: JF.CORTEZ Status for approval Date: 3/17/2020

Length of Bar (m)


Cutting
Bar No. Bar Shapes a (mm) b (mm) c (mm) Dia (mm) Spacing (mm) Length qty No. of
sets 10 12 16 20 25
(mm)

b
a
250 1050 150 12 1850 16 5 148.00
c c
F1

b 1050 16 1050 16 5 84.00

b
a
250 1250 150 12 2050 16 2 65.60
c c
F2
b 1250 16 1250 16 2 40.00

b
a 250 1650 150 12 2450 16 9 352.80
c c
F3
b 1650 16 1650 16 9 237.60

b
a 250 1650 150 12 2450 16 10 392.00
c c
F4
b 1650 16 1650 16 10 264.00

b
300 1650 20 1950 12 5 117.00

CP1
c
a 500 500 75 12 2150 14 5 150.50
b

c
a
500 170 75 12 1490 14 5 104.30
b

b 400 1650 25 2050 16 8 262.40

c
a 600 625 75 12 2600 14 8 291.20
b
CP2

b 300 600 75 12 1950 14 8 218.40

b 625 150 75 12 1700 14 8 190.40

b
400 1650 25 2050 16 6 196.80

c
a 600 690 75 12 2730 14 6 229.32
CP3 b
CP3

b 170 600 75 12 1690 14 6 141.96

b 690 150 75 12 1830 14 6 153.72

400 1650 25 2050 16 3 98.40

CP4

c
a 600 600 75 12 2550 14 3 107.10
b

b 150 600 75 12 1650 14 3 69.30

b 600 150 75 12 1650 14 3 69.30

400 1650 25 2050 16 4 131.20

CP5

c
a 690 625 75 12 2780 14 4 155.68
b

b 155 690 75 12 1840 14 4 103.04

b 690 155 75 12 1840 14 4 103.04

TOTAL LENGTH (M) 1832.46 254.8 1584 117 688.8

REBAR WEIGHT IN KG/M 0.62 0.89 1.578 2.47 3.854

TOTAL REINFORCEMENT WEIGHT IN KGS 6,806.07


REBAR CUTTING LIST Structure: Concrete Pedestal / Footing

Project Name MG 7300 N2 GAS PLANT PROJECT Prepared by: D.MANIPOL Revision 0 Doc. No. RCL - 001

Ref Dwg No. S-2 Approved by: JF.CORTEZ Status for approval Date: 3/17/2020

Length of Bar (m)


Cutting
Bar No. Bar Shapes a (mm) b (mm) c (mm) Dia (mm) Spacing (mm) Length qty No. of
sets 10 12 16 20 25
(mm)

b
a
250 1050 150 12 1850 16 5 148.00
c c
F1

b 1050 16 1050 16 5 84.00

b
a
250 1250 150 12 2050 16 2 65.60
c c
F2
b 1250 16 1250 16 2 40.00

b
a 250 1650 150 12 2450 16 9 352.80
c c
F3
b 1650 16 1650 16 9 237.60

b
a 250 2250 150 12 3050 16 10 488.00
c c
F4
b 2250 16 2250 16 10 360.00

b
300 1650 20 1950 12 5 117.00

CP1
c
a 500 500 75 12 2150 14 5 150.50
b

c
a
500 170 75 12 1490 14 5 104.30
b

b 400 1650 25 2050 16 8 262.40

c
a 600 625 75 12 2600 14 8 291.20
b
CP2

b 300 600 75 12 1950 14 8 218.40

b 625 150 75 12 1700 14 8 190.40

b
400 1650 25 2050 16 6 196.80

c
a 600 690 75 12 2730 14 6 229.32
CP3 b
CP3

b 170 600 75 12 1690 14 6 141.96

b 690 150 75 12 1830 14 6 153.72

400 1650 25 2050 16 3 98.40

CP4

c
a 600 600 75 12 2550 14 3 107.10
b

b 150 600 75 12 1650 14 3 69.30

b 600 150 75 12 1650 14 3 69.30

400 1650 25 2050 16 4 131.20

CP5

c
a 690 625 75 12 2780 14 4 155.68
b

b 155 690 75 12 1840 14 4 103.04

b 690 155 75 12 1840 14 4 103.04

c
a 350 300 75 12 1450 430 1 623.5
b

FTB1
b
a 350 75 12 850 430 1 365.5

c
GB1 a 320 220 75 12 1230 370 1 455.1
b

c
GB2 a 320 220 75 12 1230 90 1 110.7
b

TOTAL LENGTH (M) 1470.7 1670.96 721.6 117 688.8

REBAR WEIGHT IN KG/M 0.62 0.89 1.578 2.47 3.854


TOTAL REINFORCEMENT WEIGHT IN KGS 6,481.30
REBAR CUTTING LIST Structure: Machine Foundation

Project Name MG 7300 N2 GAS PLANT PROJECT Prepared by: D.MANIPOL Revision 0 Doc. No. RCL - 002

Ref Dwg No. S-11, S-12 Approved by: JF.CORTEZ Status for approval Date: 3/17/2020

Length of Bar (m)


Cutting
Bar No. Bar Shapes a (mm) b (mm) c (mm) Dia (mm) Spacing (mm) Length qty No. of
sets 10 12 16 20 25
(mm)

b
b
a b a 450 1750 16 200 2650 10 1 26.50
a a
aa b
b
b 450 1750 16 200 2650 10 1 26.50
a a a
V11
a b a 450 1750 16 200 2650 10 1 26.50

a b a 450 1750 16 200 2650 10 1 26.50

b
450 1800 16 200 2700 10 1 27.00
a a

b 450 2350 16 200 3250 10 1 32.50


a a
M41
a b a 450 1800 16 200 2700 10 1 27.00

a b a 450 2350 16 200 3250 10 1 32.50

TOTAL LENGTH (M) 0 0 1510.496 274.4 585.6

REBAR WEIGHT IN KG/M 0.62 0.89 1.578 2.47 3.854

TOTAL REINFORCEMENT WEIGHT IN KGS 5,318.23


PROJECT NAME: MG 14000 GAS PLANT PROJECT

LOCATION: BATINO, CALAMBA, LAGUNA

REBAR CUTTING LIST


Bar size Cut Length
Item QTY Location / Structure Remarks
(mm) (mm)
1 1 16 1690 F1/Footing
Prepared by:

PROJECT ENGINEER

CLIENT'S APPROVAL
APPROVAL AFTER INSPECTION/TESTING/SURVEY

- APPROVED

- REJECTED

NAME & SIGNATURE:

DATE:
DATE:

REF.NO.
RCL - 04 -001

LIST
Bar Length to Quantity Waste Cut per Bar
be Used (Lengths) Length
10500 6.213017751479 600
Noted by:

PROJECT MANAGER

ING/SURVEY
REMARKS/COMMENTS
PROJECT NAME: FABRICATION & INSTALLATION OF PLATFORM DATE:
LOCATION: STORAGE TANK PLATFORM REF.NO. STP-001

PUNCH LIST
The following items shall be corrected to comply with the contract documents

TYPE OF INSPECTION: INITIAL FINAL

NO. ITEM COMPLETION DUE SIGNATURE DATE REMARKS


DATE
1 Fabrication of additional safety railings 10/11/2014 done
at 3rd layer
2 Full welding of stiffeners connected to angle 10/12/2014 done
bars supports
3 Full welding of stiffeners connected to beams 10/13/2014 on going
4 Full welding of platform joists 10/13/2014
5 Painting of c-channel (landing) at 1st layer 10/11/2014 done
6 Cleaning of VIP line affected during painting 10/13/2014 on -going
works

Prepared by: Noted by:


____________________________________ ____________________________________
SIGNATURE OVER PRINTED NAME SIGNATURE OVER PRINTED NAME

Received by:
____________________________________
SIGNATURE OVER PRINTED NAME
PROJECT NAME: MG 7300 Gas Plant Project DATE:
LOCATION: CPIP Batino REF.NO.
REQUEST FOR INSPECTION
Name of Customer: Taiyo Nippon Sanso Philippines Inc.
Attention:

Activity:

Sir,
Please be informed that the above referenced activity will be commencing on:
DATE:
LOCATION:

Therefore, we are requesting for a joint inspection for the above on:
DATE:
LOCATION:

Requested by:

SITE ENGINEER PROJECT MANAGER

CLIENT'S APPROVAL
APPROVAL AFTER INSPECTION/TESTING/SURVEY
REMARKS/COMMENTS

- APPROVED

- REJECTED

NAME & SIGNATURE:

DATE:
PROJECT NAME: DATE:
LOCATION: REF.NO. 4800139514

SITE INSTRUCTION

Activity:

INSTRUCTED AND APPROVED BY:

DESIGNATION
DATE:
Length
Dia (mm) Qty (pcs) Unit price Amount Delivery Date
(m)
12 10.5 100 280 28,000.00 4/26/2017
16 10.5 100 498 49,800.00 4/26/2017
20 10.5 200 778 155,600.00 4/26/2017
25 10.5 160 1215 194,400.00 4/26/2017
45,500.00

F1
F2
F3
F4
F5
cold box 8.5 6.1 0.075 1 3.88875
F1 1.7 1.7 0.075 1 0.21675
F2 1.9 1.9 0.075 1 0.27075
F3 2.1 2.1 0.075 7 2.31525
F4 2.3 2.3 0.075 7 2.77725
F5 2.4 2.4 0.075 2 0.864
F6 2.7 2.7 0.075 2 1.0935
20 11.42625
13.7115

F1 1.3 1.3 0.4 1 0.676


F2 1.5 1.5 0.4 1 0.9 0.9 1
F3 1.7 1.7 0.4 6 6.936 4.624 4
F4 1.9 1.9 0.4 7 10.108 2.888 2
F5 2 2 0.4 2 3.2 3.2 1
F6 2.3 2.3 0.4 2 4.232 4.232 2
19 26.052 15.844 10
Deliver:
Pick-up:
Email x

TRANSMITTAL SHEET
PROJECT : MG 14000 N2 Gas Plant Project TS NO. : 17-001-TNSPI

TO : Taiyo Nippon Sanso Philippines Inc. DATE : 05-May-17

ATTN : Avin Lafasne

We transmit herewith the following:

QTY Unit Date DESCRIPTION Action Code


1 pages 5-May-17 REBAR CUTTING LIST E
1 pages 5-May-17 COLD BOX SHOP DRAWING - REBAR DETAILING E

ACTION A Action indicated on item transmitted. D For signature.


CODE B For Submission E See REMARKS below.
C For your information.
Remarks:
FOR APPROVAL

Transmitted by: Received by:

Jake Cortez
TAICHEM REPRESENTATIVE Signature over Printed Name
Date/Time