Data Requirements For Electrical Load Calculation

The document provides data requirements for calculating electrical loads. It requests information on HVAC equipment capacities and motor ratings, fire fighting pump motor ratings, IT/data center load requirements, and miscellaneous equipment loads. Ratings are needed in terms of tonnage, BTU, LRA, amps, horsepower, and kilowatts. The data will be used to calculate total plant running loads, peak loads, power factors, and cable details for the electrical design.

Uploaded by

Asad Khan
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
340 views

Data Requirements For Electrical Load Calculation

The document provides data requirements for calculating electrical loads. It requests information on HVAC equipment capacities and motor ratings, fire fighting pump motor ratings, IT/data center load requirements, and miscellaneous equipment loads. Ratings are needed in terms of tonnage, BTU, LRA, amps, horsepower, and kilowatts. The data will be used to calculate total plant running loads, peak loads, power factors, and cable details for the electrical design.

Uploaded by

Asad Khan
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

DATA REQUIREMENTS FOR ELECTRICAL LOAD CALCULATION

HVAC

1: Total capacity of centeralised chillers system in Tonnage / LRA / BTU / AMPS?

2: Estimated ratings of centralised AHU system motors in HP / KW?

3: Estimated ratings of chilled water pumps in HP / KW?

4: Total capacity of split, crack, windows, FCU and package units (if any) in Tonnage / BTU / LRA / AMPS?

5: Estimated ratings of sum pump and water pumps (if any) in HP / Kw?

6: Total capacity of boiler (if any) ?

FIRE FIGHTING

1: Estimated ratings of fire fighting motor pumps in HP / KW?

IT & DATA CENTER EQUIPMENTS

1: Total AC load requirements in AMPS / KW?

2: Total DC load requirements in AMPS / KW?

3: Ratings of UPS, Inverter and Rectifiers system if required?


LOAD CALCULATION

S?

nnage / BTU / LRA / AMPS?


EQUIPMENT
MOTOR &

RESTARTING
MOTOR

ESSENTIAL

ESSENTIAL
NON-MOTOR
Capacity in Ton RATING RATING
EQUIPMENT
DESCRIPTION

PANEL
NO. A B
A B

VITAL

NON-
kW B kW B
A B
1 Outdoor Process Area Lighting 13.20 13.20
2 Telemetry Bldg. Outdoor Lighting 0.60 0.60
3 Telemetry Bldg. Indoor Lighting 2.12 2.12
4 Telemetry Bldg. Exit and Emergency Lighting 0.12 0.12
5 Telemetry Bldg. Indoor Socket Outlet 2.00 2.00
6 Outdoor Process Area Socket Outlet 0.18 0.18
7 Telecom Cabinet Power Supply Unit 0.80 0.80
8 Power Supply of Batt. Rm Exhaust Fan Contol Pnl 0.50 0.50
9 Telecom Cabinet Cubicle Lighting 0.10 0.10
10 RMU Space Heater 0.20 0.20
11 24 Volts DC UPS Space Heater 0.30 0.30
12 110 Volts DC UPS Space Heater 0.30 0.30

Total Plant Running Load18


(TPRL)KW 7 KVAR kW² + kvar²
(Est. X% SumC + Y% Sum
X = 100 % Y = 30 %
(Existing)
Total Plant Peak Load (TPPL)
18 KW 7 KVAR kW² + kvar²
(Est. X% SumC + Y% Su X = 100 % Y = 30 % Z = 10 %
(Existing)
NOTES: KVAR= KW * tan( cos inverse PF)

REFERENCE:
2176-4417 SINGLE LINE
2176-4001 ELECTRICAL

B Re-issued for Construction 02.03.08

A Approved for Construction 10.01.08

REV. DESCRIPTION DATE


EFFICIENCY POWER KW=A/D CONSUMED LOAD
LOAD FACTOR (=A/B) at load FACTOR
factor C at load CONTINUOUS (Sum C) INTERMITTENT AND SPARES (S
factor C
B IN DEC C IN DEC. D kW kvar E kW
B DES D
ACT. D COS PHI DES. ACT. DES. ACT. DES. ACT.
C C D B phi E_kW E_kvar F_kW
1.00 1.00 0.95 13.20 4.34
1.00 1.00 0.95 0.60 0.20
1.00 1.00 0.95 2.12 0.70
1.00 1.00 0.95
1.00 1.00 0.85 2.00
1.00 1.00 0.85 0.18
1.00 1.00 0.85 0.80 0.50
1.00 1.00 0.85 0.50 0.31
1.00 1.00 0.85 0.10 0.06
1.00 1.00 0.85 0.20
1.00 1.00 0.85 0.30
1.00 1.00 0.85 0.30

19.39
TOTAL 17.32 6.10 2.98
(carried forward to sheet -1/4)
19 kVA
DES. 18 4
kVA = kW² + kvar²
ACT.

Main Contractor :
FERNAS
CONSTRUCTION COMPANY
P.O. Box 32398, Doha, QATAR

TITLE

EPIC OF CONSOLIDATED GAS SUPP


PIPING

JLI AB EI

JLI AB EI
THIS IS AN EXCEL SHEET AND MUST NOT BE ALTERED MANUALLY
APPD DWG NO.
DWN CHK APPD (FERNAS) APPD (QP) 2436-4107
CABLE DETAILS

MEASURED
ONSUMED LOAD kvar=kW*tg phi

CURRENT
P=PVC
RMITTENT AND SPARES (SumI) STAND-BY (SumS) X=XLPE OR EPR
kvar F kW kvar G RATING=SITE RATING
DES. ACT. DES. ACT. DES. ACT. NO. P/X SQ.MM
F_kvar G_kW G_kvar

0.12 0.04
1.24
0.11

0.12
0.19
0.19

1.85 0.12 0.04 Power factor without compensation (cos phi) :

Power factor with compensation (cos phi) :


4 0 required capacitor rating [=kW (tg phi - tg phi)] :

Engineering Consultant:
PENSPEN International LTD.
P.O. Box 1207, Doha, Qatar

PENSPEN PROJECT No. 60334

ATED GAS SUPPLY PROJECTS WITHIN RAS LAFFAN AND MESAIEED AREAS STATION A21 IN
LOAD LIST
(EXISTING DISTRIBUTION BOARD A21

OT BE ALTERED MANUALLY ORIG. SHEET SIZE: A3 EXCEL FILE:

2436-4107 SHT 04
REMARKS

RATING

Calculated Value
Calculated Value
Calculated Value
Calculated Value
Calculated Value
Calculated Value
Calculated Value
Calculated Value
Assumed Value
Assumed Value
Assumed Value
Assumed Value

0.

0.
kvar
QP CONTRACT No. GTC 07/106/ED

S STATION A21 INTERCONNECTING


LIST
ION BOARD A21-DB-002)

EXCEL FILE: REV.

OF 05 B
001