0% found this document useful (0 votes)
79 views1 page

Mel 03 - 08D2 - Right

This template check report is for an elevator project with the SAJ number and elevator number listed. It details measurements taken of the elevator entrance and hall buttons/call stations that were all within 10 mm of the specified tolerances. The entrance and all buttons/call stations were found to be compliant and approved by the inspecting and checking engineers.

Uploaded by

Umer Farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views1 page

Mel 03 - 08D2 - Right

This template check report is for an elevator project with the SAJ number and elevator number listed. It details measurements taken of the elevator entrance and hall buttons/call stations that were all within 10 mm of the specified tolerances. The entrance and all buttons/call stations were found to be compliant and approved by the inspecting and checking engineers.

Uploaded by

Umer Farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MITSUBISHI ELECTRIC SAUDI LTD.

MEL 03 – 08D2

TEMPLATE CHECK REPORT – D2


Project Name: SAJ No.: Elevator No.:

10 mm.
10 mm. 10 mm.

C
CWT

10 mm.

A1
B1A
=
=
B1
B1B
C ENTRANCE
B2A = B2B
C2A = C2B
CR1A = CR1B
=

Inspected by Checked / Approved by

Date Date
Version 1.0 / Revision Date: 10 Sep 05