0% found this document useful (0 votes)
164 views1 page

Checked, Approved and in Good Working Order Checked, Found Faulty, Notified Supervisor Not Applicable To This Item

This document contains a checklist for the start of shift inspection of a luffing tower crane. It lists 33 items to check including electrical power cords, ground fault circuit interrupters, controls, safety switches, indicators, brakes, the load block and hook, tracks, and housekeeping. Operators are required to initial each day to confirm the inspections were completed, and the supervisor and operator must sign weekly to verify all inspections were performed. Any faults found during inspections must be noted in the remarks section and notified to the supervisor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
164 views1 page

Checked, Approved and in Good Working Order Checked, Found Faulty, Notified Supervisor Not Applicable To This Item

This document contains a checklist for the start of shift inspection of a luffing tower crane. It lists 33 items to check including electrical power cords, ground fault circuit interrupters, controls, safety switches, indicators, brakes, the load block and hook, tracks, and housekeeping. Operators are required to initial each day to confirm the inspections were completed, and the supervisor and operator must sign weekly to verify all inspections were performed. Any faults found during inspections must be noted in the remarks section and notified to the supervisor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LUFFING TOWER CRANE “START OF SHIFT INSPECTION”

This checklist is a minimum standard. Manufacturer/supplier may require more.


Lessee: ________________________________________ Week of: ________________________ Year: _______________

Project: ______________________________________________ Crane Owner: ____________________________________________

Site Address: ___________________________________________________________________________________________________

Crane Make: ________________________ Model: ____________________ Serial #: ________________________________________

; Checked, approved and in good working order ⊠ Checked, found faulty, notified supervisor
(details required under remarks) ⊟ Not applicable to this item
# Luffing Tower Crane Operator Sun Mon Tue Wed Thu Fri Sat
1 Electrical power cords – main feed – junction box/splice
2 Ground fault circuit interrupter (GFCI)
3 ON/OFF switch (main disconnect)
4 Crane base inspection
5 Inspect walkways, handrails, guards, and ladders
6 Inspect structure, pins, keepers, and mast bolts
7 Ensure all tower wedges or tie backs are in place and tight
8 Ensure all doors, panels, and covers are in place and weather-tight
9 Operators controls are functioning adequately
10 Load moment hoist limit
11 Load moment luffing limit
12 Maximum load (line pull)
13 Luffing up switch(s)
14 Luffing down switch(s)
15 Luffing up and down deceleration switch
16 Boom angle indicator
17 Counterweight safety switch
18 Hoist up deceleration limit
19 Hoist upper limit
20 Anti 2 block switch (hoist up and boom down)
21 Hoist down limit or slack line
22 Ensure all audio/visual indicators are functioning properly
23 Anemometer
24 Hoist brake is functioning
25 Slewing brake is functioning
26 Luffing brake
27 Visually inspect load block and hook
28 Travel brake to rail where applicable
29 Rail travel forward and reverse
30 Inspect tracks for loose connections, proper drainage, subsidence and
bogie wear on travelling cranes, rail clamps, and end stops
31 Housekeeping:
concrete debris, rebar dowels, signage lights, access/egress, etc.
32 Supervisor notified of defects or faults

33 Operator to initial daily

Remarks:_____________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________

Weekly Supervisor and Operator signatures indicating inspections have been completed

Operator’s Signature: __________________________ Operator’s Name:_________________________ Certificate No. _______________


PRINT
Supervisor’s Signature:__________________________________ Supervisor’s Name: __________________________________________
PRINT