Jacket Installation Flowchart

The document outlines the steps for installing a jacket structure. It involves multiple transportation spreads to mobilize the jacket, piles, and conductors to the site. The jacket is then offloaded from a cargo barge and installed on the seabed using a lift vessel. Piles are installed on the jacket using a lift vessel. Conductors are then attached to the piles, completing the installation. The transportation spreads are then demobilized.

Uploaded by

Nath Yau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
900 views1 page

Jacket Installation Flowchart

The document outlines the steps for installing a jacket structure. It involves multiple transportation spreads to mobilize the jacket, piles, and conductors to the site. The jacket is then offloaded from a cargo barge and installed on the seabed using a lift vessel. Piles are installed on the jacket using a lift vessel. Conductors are then attached to the piles, completing the installation. The transportation spreads are then demobilized.

Uploaded by

Nath Yau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Jacket Installation

Installation Spread Transportation Spread A Transportation Spread B Transportation Spread C


BOKALIFT Jacket Piles & Transition Pieces Conductors

A
Transit to site & Dynamic Transportation Spread Transportation Spread Transportation Spread
Positioning Trails Mobilization Mobilization Mobilization

Pre-installation Survey B Load-Out & Sea fastening of Load-Out & Sea fastening of Load-Out & Sea fastening of
C Jacket on Cargo Barge Piles on Cargo Barge Conductors on Cargo Barge

Transit to Site Transit to Site Transit to Site

Cargo Barge Berthing B B


CB Berthing & Personnel
alongside Installation
Transfer on CB C
Vessel C

Jacket Sea fastening Cutting


& Rigging Connection

Jacket Horizontal Lift,


Jacket Offloading from
Upending & Setting down
Cargo Barge
on seabed

Cargo Barge Release &


Cargo Barge Unberthing
Personnel Recovery

Cargo Barge Berthing


Piles Sea fastening Cutting
alongside Installation
& Transfer to Bokalift Deck
Vessel
Transit to Port
Piles Installation Piles Offloading from Cargo
Barge to Installation Vessel
Demobilization of
Deck
Transportation Spread

Cargo Barge Release &


Cargo Barge Unberthing
Personnel Recovery

D
Conductors Piles Sea
Jacket Levelling, Cargo Barge
fastening Cutting &
Crown Shims Welding Unberthing alongside
Transfer on Bokalift
& Pile final cut-off Installation Vessel
Deck
Transit to Port
Conductors Piles
Transition Piece Conductors Piles Offloading from Cargo
Installation Installation Barge
Demobilization of
Transportation Spread
Cargo Barge Release & Cargo Barge
Personnel Recovery Unberthing

Jacket Legs/Piles Grouting E Transit to Port

Post-installation Survey Demobilization of


Transportation Spread

Move to next location

Completed