Jacket Installation Flowchart
Jacket Installation Flowchart
A
Transit to site & Dynamic Transportation Spread Transportation Spread Transportation Spread
Positioning Trails Mobilization Mobilization Mobilization
Pre-installation Survey B Load-Out & Sea fastening of Load-Out & Sea fastening of Load-Out & Sea fastening of
C Jacket on Cargo Barge Piles on Cargo Barge Conductors on Cargo Barge
D
Conductors Piles Sea
Jacket Levelling, Cargo Barge
fastening Cutting &
Crown Shims Welding Unberthing alongside
Transfer on Bokalift
& Pile final cut-off Installation Vessel
Deck
Transit to Port
Conductors Piles
Transition Piece Conductors Piles Offloading from Cargo
Installation Installation Barge
Demobilization of
Transportation Spread
Cargo Barge Release & Cargo Barge
Personnel Recovery Unberthing
Completed