0% found this document useful (0 votes)
126 views

Cross Section of Road

The document outlines the typical cross-section of the proposed stage strengthening of an existing pavement from 0 to 49 km of NH-2B in West Bengal. It shows the existing layers including a 150mm bituminous layer, 250mm WMM/WBM layer, and 433mm base course and sub-base course. It proposes adding a 200mm hard shoulder, 40mm bituminous concrete layer, and 50mm thick DBM layer with specified slopes. The cross-section varies from 0-27km with a 9m width and from 27-49km with a 7m width.

Uploaded by

Ollie Bhatt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
126 views

Cross Section of Road

The document outlines the typical cross-section of the proposed stage strengthening of an existing pavement from 0 to 49 km of NH-2B in West Bengal. It shows the existing layers including a 150mm bituminous layer, 250mm WMM/WBM layer, and 433mm base course and sub-base course. It proposes adding a 200mm hard shoulder, 40mm bituminous concrete layer, and 50mm thick DBM layer with specified slopes. The cross-section varies from 0-27km with a 9m width and from 27-49km with a 7m width.

Uploaded by

Ollie Bhatt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1.50 m To 2.00 m 9.00 m 1.50 m To 2.

00 m

Proposed Hard Shoulder 200 mm tk Proposed Bituminous concrete 40 mm Tk Proposed 50 mm Tk DBM


2.50% 2.50%
3% 3% Proposed Hard Shoulder 200 mm tk
Existing bituminous 150 mm (av)
Existing WMM/WBM Layer (250 mm av)
Existing Base Course 433.00 mm (av)
Existing Sub Base Course

FROM CHAINAGE 0.00 KMP TO 27.00 KMP

TYPICAL CROSS-SECTION OF PROPOSED STAGE STRENGTHENING OF THE EXISTING PAVEMENT


FROM 0.00 KMP TO 49.00 KMP OF NH- 2B UNDER N. H DIVISION NO:-III OF N.H.C.-II DURING THE
YEAR 2019-20 IN THE DISTRICT OF PURBA BARDHAMAN & BIRBHUM ,WEST BENGAL .
1.50 m To 2.00 m 7.00 m 1.50 m To 2.00 m

Proposed Hard Shoulder 200 mm tk Proposed Bituminous concrete 40 mm Tk Proposed 50 mm Tk DBM


2.50% 2.50%
3% 3% Proposed Hard Shoulder 200 mm tk
Existing bituminous 150 mm (av)
Existing WMM/WBM Layer 250 mm (av)
Existing Base Course 433.00 mm (av)
Existing Sub Base Course

FROM CHAINAGE 27.00 KMP TO 49.00 KMP

TYPICAL CROSS-SECTION OF PROPOSED STAGE STRENGTHENING OF THE EXISTING PAVEMENT


FROM 0.00 KMP TO 49.00 KMP OF NH- 2B UNDER N. H DIVISION NO:-III OF N.H.C.-II DURING THE
YEAR 2019-20 IN THE DISTRICT OF PURBA BARDHAMAN & BIRBHUM ,WEST BENGAL .

You might also like