Presentation of Kawasaki FGD and SCR System
Presentation of Kawasaki FGD and SCR System
Equivalent(MW)
30000
25000
Limestone-
20000
gypsum process
15000
10000
5000
Magnesium-
0 gypsum process
'73∼'77 ∼'82 ∼'87 ∼'92 ∼'97 ∼'02 ∼'07 ∼Now
Kawasaki FGD Technology applies to one of
the largest coal fired power plants in the world
Unit 2 (700MW)
in 1991
Advantages
1) Absorber height lowered
2) Easy maintenance achieved
Features of Kawasaki FGD Technology
2. Kawasaki Spiral Spray Nozzle
Specification Advantages
Type : Spiral 1) High SO2 and dust removal performance
Material: Ceramics 2) High flow rate and low spray pressure
3) Less clogging due to large throat diameter
4) High durability to erosion and corrosion
Advantages of Kawasaki FGD Technology
With applying Kawasaki Compact Absorber and
Kawasaki Spiral Spray Nozzle, Kawasaki achieves;
1. Superior Performance
Kawasaki’s spiral water curtain spray
nozzle achieves superior SO2 and dust
removal efficiency.
2. High Reliability
Kawasaki has achieved the highest
level of successful operational
reliability.
4. Easy Maintenance
Simple absorber design and mist
eliminator located outside absorber
make maintenance work easier.
Kawasaki FGD / Wet Limestone-Gypsum Process
Main Equipment
Boost Up Fan (BUF) Circulation Pump
Boiler Plant
Waste
Incineration
Plant
Gas Turbine
Power Plant
Diesel
Power Plant
Kawasaki will continue to refine its
technology and supply FGD and SCR Plants
all over the world to keep our earth clean.
Opatvice Power Plant No. 1 - 6 Dingzhou Power Station Hekinan Thermal Power No.4&5
Location: Pardubice, Czech Republic Location: Dingzhou Hebei, China Location: Hekinan Aichi, Japan
Fuel: Lignite Coal Fuel: Bituminous Coal Fuel: Bituminous Coal
Capacity: 330MW Capacity: 600MW Capacity: 1.000MW
Commercial Operation Year: 1997 Commercial Operation Year:2004, 2005 Commercial Operation Year:2001, 2002
Saudi / IWSP Project Unit No.1, 2, 3 Yangzhou Power Plant No. 5 Anan Thermal Power Station No. 3
Location: Saudi / Rabigh Location: Yangzhou Jiangsu, China Location: Anan Tokushima, Japan
Fuel: Heavy Oil Fuel: Bituminous Coal Fuel: Oil
Boiler Capacity: 330MWx3 Capacity: 200 MW Capacity: 450MW
Commercial Operation: Oct. 2008 Commercial Operation Year: 2003 Commercial Operation Year:1998