Data Iiird Stage: E/Dia of R/Main BHP
Data Iiird Stage: E/Dia of R/Main BHP
S.No. Pipe Velocity Res. Static First stage of flow = 0.09660 mld 2nd stage of
Size Ist 2nd head Head Friction Total KW req. Cost of Annual Capatalis- Total Friction Other Total KW req.
stage stage head head i/c 100% pumps energy ed energy Capatalis- head losss head i/c 100%
flow flow loss standbye Charges charges ed cost loss standbye
(mm) (mps) (mps) (m) (m) (m) (m) (KW) Ths Rs. (1000 Rs.) (1000 Rs.) (1000 Rs.) (m) (m) (m) (KW)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 65 0.505 0.601 3.0 405.00 16.65 424.65 23.61 106.25 193.55 1607.27 1713.51 22.93 2.29 433.22 28.63
2 80 0.334 0.397 3.0 405.00 6.06 414.06 23.02 103.59 188.71 1567.10 1670.69 8.34 0.83 417.17 27.57
3 100 0.214 0.254 3.0 405.00 2.04 410.04 22.80 102.60 186.91 1552.13 1654.73 2.81 0.28 411.09 27.17
4 125 0.137 0.162 3.0 405.00 0.69 408.69 22.73 102.29 186.33 1547.36 1649.65 0.95 0.10 409.04 27.03
5 150 0.095 0.113 3.0 405.00 0.28 408.28 22.70 102.15 186.09 1545.32 1647.47 0.39 0.04 408.43 26.99
DATA :-
1 Design pumping rate = 1.68 lps
2 Pumping hours = 16 hrs DESIGN OF PU
3 Length of rising main = 1800 m Suction : Delevery:
4 No. of working pump sets required = 1 sets 1 Friction Losses in sucn.pipe = 0.000 m 1 Velocity in delevery pipe
5 Dia of rising main = 65 mm 2 Velocity in Suction pipe = 0.053 m/s 2 Friction losses in delry. pipe
6 Static delevery lift (HD.Pt.-PSL) = 405.00 m 3 Velocity Head V^2/2g = 0.000 m 3 Velocity Head V2/2g
7 Static sucn. Lift (PSL-LWL) = 0.00 m 4 Entrance Losses = 0.000 m 4 Losses due to sluice Valve
8 Detail of system :- Suction Delevery 5 Losses due to sluice Valve = 0.000 m 5 Losses due to reflux valve
a) Dia of pipe = 200 mm 50 mm 6 Losses due to foot valve = 0.000 m 6 Losses due to Bend
b) Length of pipe = 6 m 6 m 7 Losses due to Bend = 0.000 m 7 Losses due to expander
c) No. of L.R. bends = 0 Nos. 1 Nos. 8 Losses due to expender = 0.000 m 8 Total losses
d) Foot valve = 1 Nos. 0 Nos. 9 Static Suction lift = 0.000 m NPSHA:-
e) Sluce valve = 0 Nos. 1 Nos. 10 Total suction lift = 0.001 m Losses in NPSH due to V. Pressure
f) Reflux valve = 0 Nos. 1 Nos. Losses in NPSH due to Atm. Press.
g)Unequal T = 1 Nos. 0 Nos. Static suction lift
I) Expender(increaser) = 1 Nos. 1 Nos. Total loss of NPSH
10 Altitude of Pump house = 1015 m.above MSL NPSHA
11 Normal water temprature = 20 degree C
nd Dansa Tehsil Rampur, Distt. Shimla (HP)
= 30 years
= 22608 lpd
Persons Student Hospital HOTEL R/HOUSE Pilgrim Employee Govt.Res.
70 10 340 180 180 10 45 70
2011 = 1251 0 0 0 0 0 0 0
2019 = 1390 0 0 0 0 0 0 0
= 1015.00 m.above MSL
= 20 degree C
Suction Delevery
= 6 mtr 6 mtr
= 0 No 1 No
= 1 No 0 No
= 0 No 1 No
= 0 No 1 No
= 1 No 0 No
= 1 No 1 No
= 200 mm 50 mm
80 100 125 150 200
MENT
PIPE RATE
100.94 klpd Dia Rate
78.332 klpd 20 mm 164.56
119.21 klpd 25 mm 231.80
96.602 klpd 32 mm 249.30
GMS TUBES (Medium)
300 mm 3459.30
350 mm 4428.70
400 mm 5352.50
450 mm 6376.10
500 mm 7771.30
600 mm 9470.10
2nd stage of flow = 0.114802 mld Cost of pipes Total present Econ.
KW req. Cost of Annual Capatalis- Total capat. Cost/ Total cost worth of all Dia of
100% pumps energy ed energy cost of pump Rmt of 1800m investments R/main
standbye Charges charges & energy (Rs.) pipe length
(1000 Rs.) (1000 Rs.) (1000 Rs.) (1000 Rs.) (1000 Rs.) (1000 Rs.) (mm)
17 18 19 20 21 22 23 24 25
28.63 128.84 238.59 1981.29 620.67 499.70 899.46 3233.65 65
27.57 124.07 229.76 1907.94 597.69 619.60 1115.28 3383.67 0
27.17 122.27 226.42 1880.25 589.02 893.60 1608.48 3852.23 0
27.03 121.64 225.25 1870.56 585.99 1121.60 2018.88 4254.51 0
26.99 121.46 224.92 1867.80 585.12 1337.30 2407.14 4639.73 0
The Economical dia of pumping main is = = 65 mm
DESIGN OF PUMPING MACHINERY
Rising Main:
= 0.856 mps 1 Velocity in R.Main = 0.506 m/s
= 0.000 m 2 Velocity head(V^2/2g) = 0.01 m
= 0.037 m 3 Friction losses in R.Main = 16.65 m
= 0.019 m 4 Exit losses = 0.01 m
= 0.019 m 5 Rasidual head = 3.00 m
= 0.008 m 6 Static head = 405.00 m
= 0.037 m 7 Total delivery head = 424.66 m
= 0.083 m 8 Total head = 424.74 m
9 Total BHP @ 60% eff.+ 10 % = 17.44 HP = 17.00 HP
due to V. Pressure = 0.215 m (say)
due to Atm. Press. = 1.218 m Provide Pumping Machinery of 90.00 HP as per manufacturing Range
= 0.00 m
= 1.433 m Use 1 working group of 90.00 HP
= 8.587 m and provide 1 sets to act as stand bye
Discharge 1.68 lps(each) T.Head 424.74 Mts.
Executive Engineer
IPH Division, Rampur
CLASSIFICATION OF PIPE LINE (RISING MAIN)
Name of Work :- Providing LWSS to PC/NC Hab. Deothi & Dansa Group of Villages in GP Deothi and Dansa Tehsil Rampur, Distt. Shim
IIIrd STAGE
DATA:-
Max. (design )discharge = 22.61 Kld GMS Tubes( IS:1239-1979)
Dia of Pipe line (internal) = 65 mm Outer Dia of pipeline = 139.70 mm
RD of End (delivery)Pt. = 1800.00 m Wall thickness) = GI (H) GI (M)
RL of End (delivery Pt.) = 1420.00 m 4.85 mm 4.05 mm
RL of Lower End = 1015.00 m Mill Tolerance = 10.00 %
Co-eff.of pipe friction , 'C' = 100 Fibre Stress,S= 1/3x320 = 106.67 Mpa
Corrosion allowance (thk) = 1.65 mm
Avr. Pipe thk. (Assumed) = 4.05 mm (for water Hammer effect)
Mod.of elasticity of pipe = 2.10E+10 Kg/m2 Joint Efficiency, JE = 0.85
Wave velocity, C = 1324.11 m/sec
<-------------- DATA ------------------>
R.L. of Tl. Water Hammer
Residual head)
Pressure
Tol. Frictional
Working
Pipe Line (name)
Lower Length
(i/c 3.0 m
From To
1.5 x (6 +8)
Losses
Point of Pipe
(6 +7 +8)
1.5 x (8)
(1st) (2nd Pt) Design Pr.
(1st Pt) line (for P= Max.
losses) (11,12,13)
2/3 x (14)
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
1 2 3 4 5 6 7 8 11 12 13 14 15
1 0 120 1015 120 0.0356 10.6435 408.00 612.05 612.00 418.679 612.05 408.04
2 120 520 1016.93 400 0.119 10.6435 406.07 609.29 609.11 416.836153 609.29 406.19
3 520 920 1018.85 400 0.1186 10.6435 404.15 606.40 606.22 414.910153 606.40 404.27
4 920 1320 1020.78 400 0.1186 10.6435 402.22 603.51 603.33 412.984153 603.51 402.34
5 1320 1720 1022.7 400 0.1186 10.6435 400.30 600.62 600.44 411.058153 600.62 400.41
6 1720 2120 1024.63 400 0.1186 10.6435 398.37 597.73 597.56 409.132153 597.73 398.49
7 2120 2520 1026.56 400 0.1186 10.6435 396.44 594.84 594.67 407.206153 594.84 396.56
8 2520 2920 1028.48 400 0.1186 10.6435 394.52 591.95 591.78 405.280153 591.95 394.64
9 2920 3320 1030.41 400 0.1186 10.6435 392.59 589.07 588.89 403.354153 589.07 392.71
10 3320 3720 1032.33 400 0.1186 10.6435 390.67 586.18 586.00 401.428153 586.18 390.78
11 3720 4120 1034.26 400 0.1186 10.6435 388.74 583.29 583.11 399.502153 583.29 388.86
12 4120 4520 1036.19 400 0.1186 10.6435 386.81 580.40 580.22 397.576153 580.40 386.93
13 4520 4920 1038.11 400 0.1186 10.6435 384.89 577.51 577.33 395.650153 577.51 385.01
14 4920 5320 1040.04 400 0.1186 10.6435 382.96 574.62 574.44 393.724153 574.62 383.08
15 5320 5720 1041.96 400 0.1186 10.6435 381.04 571.73 571.55 391.798153 571.73 381.15
16 5720 6120 1043.89 400 0.1186 10.6435 379.11 568.84 568.67 389.872153 568.84 379.23
17 6120 6520 1045.82 400 0.1186 10.6435 377.18 565.95 565.78 387.946153 565.95 377.30
18 6520 6920 1047.74 400 0.1186 10.6435 375.26 563.06 562.89 386.020153 563.06 375.38
Wall thk.(Barlow Wall Thk i/c tolerance & Recommended Pipe Flange Table Pipe to be provided
Min. Wall thk.