Data Iiird Stage: E/Dia of R/Main BHP

This document provides details for designing a water supply system to provide water to villages in Deothi and Dansa Tehsil, Shimla district, Himachal Pradesh. It includes key system parameters like length of rising main, pump shaft level, population data from census years, water demand projections, discharge rates, pumping hours and energy requirements. Calculations are shown to determine the optimal pipe diameter to design a cost-effective system that can meet the water demands for the first 15 years and beyond.

Uploaded by

shaman chauhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views8 pages

Data Iiird Stage: E/Dia of R/Main BHP

This document provides details for designing a water supply system to provide water to villages in Deothi and Dansa Tehsil, Shimla district, Himachal Pradesh. It includes key system parameters like length of rising main, pump shaft level, population data from census years, water demand projections, discharge rates, pumping hours and energy requirements. Calculations are shown to determine the optimal pipe diameter to design a cost-effective system that can meet the water demands for the first 15 years and beyond.

Uploaded by

shaman chauhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Name of Work :- Providing LWSS to PC/NC Hab.

Deothi & Dansa Group of Villages in GP Deothi and Dansa Tehsil Ra

IIIrd STAGE 19 Life of rising main


DATA
1 Length of rising main = 1800 m 20 Water not to be lifted
2 RL of highest discharge point = 1420.00 m
3 RL of pump shaft level = 1015.00 m 21 Water requirement per capita @
4 LWL in sump well = 1015.00 m 22 Population as per Census of 2011
5 Pumping hour at the end of 1st 15 years = 16 hrs. 23 Present population in 2019
6 No.of working pumps = 1 Nos. 24 Altitude of Pump house
7 Construction period = 3 years 25 Normal water temprature
8 Rate of population increase = 1.25 % 26 Detail of system :-
9 Value of 'C' = 100 a) Length of pipe
10 Cost of pumping unit/Kw = 4500 /- b) No. of L.R. bends
11 Energy charges/unit = 3.10 /- c) Foot valve
12 Interest rate = 8.50 % d) Sluice valve
13 Combined efficiency of P/machinary = 60 % e) Reflux valve
14 Percentage of stand bye Pump sets = 100 % f) Unequal T
15 Life of pumping machinery = 15 years g) Expander(enlarger)
16 Residual head = 3.00 m h) dia of suction/ delivery
17 Census year = 2011 year 27 Trial dia of Rising main
18 Present Year = 2019 year
E/Dia Of R/main
BHP

ECONOMICAL DIA STATEMENT


Name of Work :- Providing LWSS to PC/NC Hab. Deothi & Dansa Group of Villages in GP Deothi and Dansa Tehsil Rampur, Distt. Shimla (HP)
IIIrd STAGE
DATA :- CALCULATIONS:-
Length of rising main = 1800.00 m Initial water requirement = 100940 lpd = 100.94
RL of highest discharge point = 1420.00 m Initial net water requirement Q1 = 78332 lpd = 78.332
RL of pump shaft level = 1015.00 m Intermidiate water requirement = 119210 lpd = 119.21
LWL in sump well = 1015.00 m Intermidiate net water requirement Q2 = 96602 lpd = 96.602
Pumping hour at the end of 1st 15 years = 16 hrs. Ultimate water requirement = 137410 lpd = 137.41
No.of working pump set providing = 1 Nos. Ultimate net water requirement Q3 = 114802 lpd = 114.802
Construction period = 3 years Ist 15 years 2nd 15
Rate of population increase = 1.25 % Discharge at installation = 0.078332 mld 0.09660
Value of 'C' = 100 Discharge at the end of 15 years = 0.096602 mld 0.11480
Cost of pumping unit/Kw = 4500 /- Average discharge during 15 years = 0.087467 mld 0.10570
Energy charges/unit = 3.10 /- Avg. hours of pumping during 15 years = 14.49 hrs. 14.73
interest rate = 8.5 % Average annual energy charges = 16395.44 /- 16667
Combined efficiency of P/machinary = 60 % Pumping rate (design discharge) = 144.903 klpd 172.20
Percentage of stand bye Pump sets = 100 %
Life of pumping machinery = 15 years
Life of rising main = 30 years
Water available from Gravity source = 22608 lpd
Persons Student Hospital HOTEL R/HOUSE Pilgrim Employee Govt.Res.
Water requirement per capita @ 70 10 340 180 180 10 45 70
Population as per Census of 2011 = 1251 0 0 0 0 0 0 0
Present population in Year of 2019 = 1390 0 0 0 0 0 0 0
Initial Pop.after Const.period 2022 = 1442 0 0 0 0 0 0 0
Intermideate population after 15 yrs. 2037 = 1703 0 0 0 0 0 0 0
Ultimate population after 30 yrs. 2052 = 1963 0 0 0 0 0 0 0

S.No. Pipe Velocity Res. Static First stage of flow = 0.09660 mld 2nd stage of
Size Ist 2nd head Head Friction Total KW req. Cost of Annual Capatalis- Total Friction Other Total KW req.
stage stage head head i/c 100% pumps energy ed energy Capatalis- head losss head i/c 100%
flow flow loss standbye Charges charges ed cost loss standbye
(mm) (mps) (mps) (m) (m) (m) (m) (KW) Ths Rs. (1000 Rs.) (1000 Rs.) (1000 Rs.) (m) (m) (m) (KW)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 65 0.505 0.601 3.0 405.00 16.65 424.65 23.61 106.25 193.55 1607.27 1713.51 22.93 2.29 433.22 28.63
2 80 0.334 0.397 3.0 405.00 6.06 414.06 23.02 103.59 188.71 1567.10 1670.69 8.34 0.83 417.17 27.57
3 100 0.214 0.254 3.0 405.00 2.04 410.04 22.80 102.60 186.91 1552.13 1654.73 2.81 0.28 411.09 27.17
4 125 0.137 0.162 3.0 405.00 0.69 408.69 22.73 102.29 186.33 1547.36 1649.65 0.95 0.10 409.04 27.03
5 150 0.095 0.113 3.0 405.00 0.28 408.28 22.70 102.15 186.09 1545.32 1647.47 0.39 0.04 408.43 26.99
DATA :-
1 Design pumping rate = 1.68 lps
2 Pumping hours = 16 hrs DESIGN OF PU
3 Length of rising main = 1800 m Suction : Delevery:
4 No. of working pump sets required = 1 sets 1 Friction Losses in sucn.pipe = 0.000 m 1 Velocity in delevery pipe
5 Dia of rising main = 65 mm 2 Velocity in Suction pipe = 0.053 m/s 2 Friction losses in delry. pipe
6 Static delevery lift (HD.Pt.-PSL) = 405.00 m 3 Velocity Head V^2/2g = 0.000 m 3 Velocity Head V2/2g
7 Static sucn. Lift (PSL-LWL) = 0.00 m 4 Entrance Losses = 0.000 m 4 Losses due to sluice Valve
8 Detail of system :- Suction Delevery 5 Losses due to sluice Valve = 0.000 m 5 Losses due to reflux valve
a) Dia of pipe = 200 mm 50 mm 6 Losses due to foot valve = 0.000 m 6 Losses due to Bend
b) Length of pipe = 6 m 6 m 7 Losses due to Bend = 0.000 m 7 Losses due to expander
c) No. of L.R. bends = 0 Nos. 1 Nos. 8 Losses due to expender = 0.000 m 8 Total losses
d) Foot valve = 1 Nos. 0 Nos. 9 Static Suction lift = 0.000 m NPSHA:-
e) Sluce valve = 0 Nos. 1 Nos. 10 Total suction lift = 0.001 m Losses in NPSH due to V. Pressure
f) Reflux valve = 0 Nos. 1 Nos. Losses in NPSH due to Atm. Press.
g)Unequal T = 1 Nos. 0 Nos. Static suction lift
I) Expender(increaser) = 1 Nos. 1 Nos. Total loss of NPSH
10 Altitude of Pump house = 1015 m.above MSL NPSHA
11 Normal water temprature = 20 degree C
nd Dansa Tehsil Rampur, Distt. Shimla (HP)

= 30 years

= 22608 lpd
Persons Student Hospital HOTEL R/HOUSE Pilgrim Employee Govt.Res.
70 10 340 180 180 10 45 70
2011 = 1251 0 0 0 0 0 0 0
2019 = 1390 0 0 0 0 0 0 0
= 1015.00 m.above MSL
= 20 degree C
Suction Delevery
= 6 mtr 6 mtr
= 0 No 1 No
= 1 No 0 No
= 0 No 1 No
= 0 No 1 No
= 1 No 0 No
= 1 No 1 No
= 200 mm 50 mm
80 100 125 150 200

E/Dia Of R/main = 65 Head = 424.74 Velocity = 0.60 lps


=1 x 90.00 HP Discharge = 1.68

MENT

PIPE RATE
100.94 klpd Dia Rate
78.332 klpd 20 mm 164.56
119.21 klpd 25 mm 231.80
96.602 klpd 32 mm 249.30
GMS TUBES (Medium)

137.41 klpd 40 mm 288.10


114.802 klpd 50 mm 386.50
2nd 15 years 65 mm 499.70
0.096602 mld 80 mm 619.60
0.114802 mld 100 mm 893.60
0.105702 mld 125 mm 1121.60
14.73 hrs 150 mm 1337.30
16667 /- 200 mm 2022.40
172.203 klpd 250 mm 2631.00
MSERW PIPE(IS:1978-82)

300 mm 3459.30
350 mm 4428.70
400 mm 5352.50
450 mm 6376.10
500 mm 7771.30
600 mm 9470.10

2nd stage of flow = 0.114802 mld Cost of pipes Total present Econ.
KW req. Cost of Annual Capatalis- Total capat. Cost/ Total cost worth of all Dia of
100% pumps energy ed energy cost of pump Rmt of 1800m investments R/main
standbye Charges charges & energy (Rs.) pipe length
(1000 Rs.) (1000 Rs.) (1000 Rs.) (1000 Rs.) (1000 Rs.) (1000 Rs.) (mm)
17 18 19 20 21 22 23 24 25
28.63 128.84 238.59 1981.29 620.67 499.70 899.46 3233.65 65
27.57 124.07 229.76 1907.94 597.69 619.60 1115.28 3383.67 0
27.17 122.27 226.42 1880.25 589.02 893.60 1608.48 3852.23 0
27.03 121.64 225.25 1870.56 585.99 1121.60 2018.88 4254.51 0
26.99 121.46 224.92 1867.80 585.12 1337.30 2407.14 4639.73 0
The Economical dia of pumping main is = = 65 mm
DESIGN OF PUMPING MACHINERY
Rising Main:
= 0.856 mps 1 Velocity in R.Main = 0.506 m/s
= 0.000 m 2 Velocity head(V^2/2g) = 0.01 m
= 0.037 m 3 Friction losses in R.Main = 16.65 m
= 0.019 m 4 Exit losses = 0.01 m
= 0.019 m 5 Rasidual head = 3.00 m
= 0.008 m 6 Static head = 405.00 m
= 0.037 m 7 Total delivery head = 424.66 m
= 0.083 m 8 Total head = 424.74 m
9 Total BHP @ 60% eff.+ 10 % = 17.44 HP = 17.00 HP
due to V. Pressure = 0.215 m (say)
due to Atm. Press. = 1.218 m Provide Pumping Machinery of 90.00 HP as per manufacturing Range
= 0.00 m
= 1.433 m Use 1 working group of 90.00 HP
= 8.587 m and provide 1 sets to act as stand bye
Discharge 1.68 lps(each) T.Head 424.74 Mts.

Executive Engineer
IPH Division, Rampur
CLASSIFICATION OF PIPE LINE (RISING MAIN)
Name of Work :- Providing LWSS to PC/NC Hab. Deothi & Dansa Group of Villages in GP Deothi and Dansa Tehsil Rampur, Distt. Shim
IIIrd STAGE
DATA:-
Max. (design )discharge = 22.61 Kld GMS Tubes( IS:1239-1979)
Dia of Pipe line (internal) = 65 mm Outer Dia of pipeline = 139.70 mm
RD of End (delivery)Pt. = 1800.00 m Wall thickness) = GI (H) GI (M)
RL of End (delivery Pt.) = 1420.00 m 4.85 mm 4.05 mm
RL of Lower End = 1015.00 m Mill Tolerance = 10.00 %
Co-eff.of pipe friction , 'C' = 100 Fibre Stress,S= 1/3x320 = 106.67 Mpa
Corrosion allowance (thk) = 1.65 mm
Avr. Pipe thk. (Assumed) = 4.05 mm (for water Hammer effect)
Mod.of elasticity of pipe = 2.10E+10 Kg/m2 Joint Efficiency, JE = 0.85
Wave velocity, C = 1324.11 m/sec
<-------------- DATA ------------------>
R.L. of Tl. Water Hammer

Max Static head


R.D. Field Test Pr. (Design Pr.)

Residual head)

Pressure
Tol. Frictional

Working
Pipe Line (name)

Lower Length

(i/c 3.0 m
From To

1.5 x (6 +8)
Losses

Point of Pipe

(6 +7 +8)
1.5 x (8)
(1st) (2nd Pt) Design Pr.
(1st Pt) line (for P= Max.
losses) (11,12,13)
2/3 x (14)

(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
1 2 3 4 5 6 7 8 11 12 13 14 15
1 0 120 1015 120 0.0356 10.6435 408.00 612.05 612.00 418.679 612.05 408.04
2 120 520 1016.93 400 0.119 10.6435 406.07 609.29 609.11 416.836153 609.29 406.19
3 520 920 1018.85 400 0.1186 10.6435 404.15 606.40 606.22 414.910153 606.40 404.27
4 920 1320 1020.78 400 0.1186 10.6435 402.22 603.51 603.33 412.984153 603.51 402.34
5 1320 1720 1022.7 400 0.1186 10.6435 400.30 600.62 600.44 411.058153 600.62 400.41
6 1720 2120 1024.63 400 0.1186 10.6435 398.37 597.73 597.56 409.132153 597.73 398.49
7 2120 2520 1026.56 400 0.1186 10.6435 396.44 594.84 594.67 407.206153 594.84 396.56
8 2520 2920 1028.48 400 0.1186 10.6435 394.52 591.95 591.78 405.280153 591.95 394.64
9 2920 3320 1030.41 400 0.1186 10.6435 392.59 589.07 588.89 403.354153 589.07 392.71
10 3320 3720 1032.33 400 0.1186 10.6435 390.67 586.18 586.00 401.428153 586.18 390.78
11 3720 4120 1034.26 400 0.1186 10.6435 388.74 583.29 583.11 399.502153 583.29 388.86
12 4120 4520 1036.19 400 0.1186 10.6435 386.81 580.40 580.22 397.576153 580.40 386.93
13 4520 4920 1038.11 400 0.1186 10.6435 384.89 577.51 577.33 395.650153 577.51 385.01
14 4920 5320 1040.04 400 0.1186 10.6435 382.96 574.62 574.44 393.724153 574.62 383.08
15 5320 5720 1041.96 400 0.1186 10.6435 381.04 571.73 571.55 391.798153 571.73 381.15
16 5720 6120 1043.89 400 0.1186 10.6435 379.11 568.84 568.67 389.872153 568.84 379.23
17 6120 6520 1045.82 400 0.1186 10.6435 377.18 565.95 565.78 387.946153 565.95 377.30
18 6520 6920 1047.74 400 0.1186 10.6435 375.26 563.06 562.89 386.020153 563.06 375.38

PREPARED BY Er.V.K.BANSAL (AAE -D)


SING MAIN)
Dansa Tehsil Rampur, Distt. Shimla (HP)

MSERW Pipe IS:3589-2001


Outer dia of Pipe ( Fe 330 ) = 139.70 mm Grade Yield.Str.(Mpa)
Yeild strength = 195 Mpa 320 195
S = 60% Yeild Str. = 117 Mpa 410 235
Min. thk. Of Pipe wall = 4.00 mm
Mill Tolerance = 10.0 %
MSERW Pipe IS:1978-82 Grade Fibre Stress
Outer Dia of pipeline = 139.70 mm 170 102
Fibre Stress (Yst 240) Standard "S" = 145 Mpa 210 124
Mill tolerance = 12.50 % 240 145

Wall thk.(Barlow Wall Thk i/c tolerance & Recommended Pipe Flange Table Pipe to be provided
Min. Wall thk.

equ) t =P.D corroson allowan. (IS:6392)


Wall thk. Type and Class of Pipe Line
/(2.S.JE) Refer
Working Pr.in
IS: IS: IS: (15)
1239 3589 1978 From RD To RD
IS: IS: IS:
1239 3589 1978 (mm) Use
(mm) (mm) (mm) (mm)
16 17 18 19 20 21 22 23 24 25 26
4.72 4.30 3.47 6.84 6.38 5.55 4.00 4.80 MSERW Pipe (IS:1978) 34 34 0 to 120
4.69 4.28 3.45 6.81 6.36 5.53 4.00 4.80 MSERW Pipe (IS:1978) 34 34 120 to 520
4.67 4.26 3.44 6.79 6.34 5.52 4.00 4.80 MSERW Pipe (IS:1978) 34 34 520 to 920
4.65 4.24 3.42 6.76 6.31 5.50 4.00 4.80 MSERW Pipe (IS:1978) 34 34 920 to 1320
4.63 4.22 3.40 6.74 6.29 5.48 4.00 4.40 MSERW Pipe (IS:1978) 34 34 1320 to 1720
4.60 4.20 3.39 6.72 6.27 5.46 4.00 4.40 MSERW Pipe (IS:1978) 28 28 1720 to 2120
4.58 4.18 3.37 6.69 6.25 5.44 4.00 4.40 MSERW Pipe (IS:1978) 28 28 2120 to 2520
4.56 4.16 3.35 6.67 6.22 5.42 4.00 4.40 MSERW Pipe (IS:1978) 28 28 2520 to 2920
4.54 4.14 3.34 6.64 6.20 5.41 4.00 4.40 MSERW Pipe (IS:1978) 28 28 2920 to 3320
4.52 4.12 3.32 6.62 6.18 5.39 4.00 4.40 MSERW Pipe (IS:1978) 28 28 3320 to 3720
4.49 4.10 3.31 6.59 6.16 5.37 4.00 4.40 MSERW Pipe (IS:1978) 28 28 3720 to 4120
4.47 4.08 3.29 6.57 6.13 5.35 4.00 4.00 MSERW Pipe (IS:1978) 28 28 4120 to 4520
4.45 4.06 3.27 6.54 6.11 5.33 4.00 4.00 MSERW Pipe (IS:1978) 28 28 4520 to 4920
4.43 4.04 3.26 6.52 6.09 5.31 4.00 4.00 MSERW Pipe (IS:1978) 28 28 4920 to 5320
4.40 4.02 3.24 6.49 6.07 5.30 4.00 4.00 MSERW Pipe (IS:1978) 28 28 5320 to 5720
4.38 4.00 3.22 6.47 6.04 5.28 4.00 4.00 MSERW Pipe (IS:1978) 28 28 5720 to 6120
4.36 3.98 3.21 6.45 6.02 5.26 4.00 4.00 MSERW Pipe (IS:1978) 28 28 6120 to 6520
4.34 3.95 3.19 6.42 6.00 5.24 4.00 4.00 MSERW Pipe (IS:1978) 28 28 6520 to 6920

PREPARED BY Er.V.K.BANSAL (AAE -D)