0% found this document useful (0 votes)
63 views

Material Inspection Form

This document summarizes inspection records for material, foundation, sandblasting/derusting, painting, welder qualification, geometric dimensions, hydrostatic testing, nozzle/manhole fitting, and painting of a tank. The records include information such as material names, batch numbers, manufacturer dates, foundation details, locations, quantities, dimensions, test results, and more. Signatures from contractor and owner representatives are included on each form.

Uploaded by

King王
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views

Material Inspection Form

This document summarizes inspection records for material, foundation, sandblasting/derusting, painting, welder qualification, geometric dimensions, hydrostatic testing, nozzle/manhole fitting, and painting of a tank. The records include information such as material names, batch numbers, manufacturer dates, foundation details, locations, quantities, dimensions, test results, and more. Signatures from contractor and owner representatives are included on each form.

Uploaded by

King王
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 9

Material Inspection Form

Project Title: COMPANT


Contract No.: No.:MWP-C-QU-MA-000X
Type and Manufacture
Sno. Material Name specification Batch No./ serial number date Unit Qty Remark
1
2
3
4
5
6
7
8
9
10

Contractor Representative: Owner’s Representative:

Date: Date:
Tank foundation handover record

Contract No.: No.:MWP -C-QU-MA-000X

Tank No.

Diameter of tank foundation

Slope of top surface

Sketch map:

Contractor inspector: Owner’s Representative:

Contractor Engineer:

Date:
Date:

Sandblasting/Derusting Records for Plates


Contract No.: No.:MWP -C-QU-MA-000X
Tank No.:

No. Location Material Unit Qty Remark

1 PCS

2 PCS

3 PCS

4 PCS

5 PCS

6 PCS

7 PCS

8 PCS

9 PCS

Contractor inspector: Owner’s Representative:

Contractor Engineer:

Date:
Date:
Painting Records for Plates
Tank No. : Weather: No.:MWP-C-QU-MA-000X

Location Plate No. Aver. DFT Remark


Paint Start Time End Time
(μm)

Contractor inspector: Owner’s Representative:

Contractor Engineer:

Date:
Date:
Welder qualification test record
Contract No.: No.:MWP-C-QU-MA-000X

No. Name Passport No. Welder No Position Result

 
1
 

 
2
 

 
3
 

 
4
 

Contractor inspector: Owner’s Representative:

Contractor Engineer:

Date:
Date:
Inspection record of geometric dimension of tank
Contract No.: No.:MWP-C-QU-MA-000X
Tank No. Shell No

Local Flatness of Local Flatness of horizontal


Sno. Plate No. Plumbness Diameter
vertical seams seams

10

11

Contractor inspector: Owner’s Representative:

Contractor Engineer:

Date:
Date:
Tank Hydrostatic Test Inspection Report

Contract No.: No.:MWP-C-QU-MA-000X

Tank No. Testing date


Description :

Start Date Completed Date Final Holding Time Test Medium

Conclusion:

Remarks:

Contractor inspector: Owner’s Representative:

Contractor Engineer:

Date: Date:
Nozzle/Manhole Fitting Up Records

Contract No.: Tank No.: Ref.Drawing No.: No.:MWP-C-QU-MA-000X

No. Name Location Height Diameter Reinforce plate size Joint gap Date Remark

Contractor inspector: Owner’s Representative:

Contractor Engineer:
Date:
Date:
Construction Record for Painting of Tank
Contract No.: No.:MWP-C-QU-MA-000X

Tank No.: Position:

Surface state

Temperature Relative humidity

Paint:

Start time: End time:

Inspection time

Min DFT Max DFT


(μm) (μm)

Aver. DFT(μm)

Result

Contractor inspector: Owner’s Representative:

Contractor Engineer:

Date: Date: