Material Inspection Form
Material Inspection Form
Date: Date:
Tank foundation handover record
Tank No.
Sketch map:
Contractor Engineer:
Date:
Date:
1 PCS
2 PCS
3 PCS
4 PCS
5 PCS
6 PCS
7 PCS
8 PCS
9 PCS
Contractor Engineer:
Date:
Date:
Painting Records for Plates
Tank No. : Weather: No.:MWP-C-QU-MA-000X
Contractor Engineer:
Date:
Date:
Welder qualification test record
Contract No.: No.:MWP-C-QU-MA-000X
1
2
3
4
Contractor Engineer:
Date:
Date:
Inspection record of geometric dimension of tank
Contract No.: No.:MWP-C-QU-MA-000X
Tank No. Shell No
10
11
Contractor Engineer:
Date:
Date:
Tank Hydrostatic Test Inspection Report
Conclusion:
Remarks:
Contractor Engineer:
Date: Date:
Nozzle/Manhole Fitting Up Records
No. Name Location Height Diameter Reinforce plate size Joint gap Date Remark
Contractor Engineer:
Date:
Date:
Construction Record for Painting of Tank
Contract No.: No.:MWP-C-QU-MA-000X
Surface state
Paint:
Inspection time
Aver. DFT(μm)
Result
Contractor Engineer:
Date: Date: