0% found this document useful (0 votes)
209 views

BOQ MOT Format2

This document is a bill of quantities for the THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT project. It outlines the estimated costs for various items of work broken into parts including general requirements, earthworks and utilities, base layers, asphalt works, and structural works. The total estimated cost for all work is over $25 million USD with the largest estimated costs coming from structural excavation, reinforced concrete, and rebar.

Uploaded by

jethro chan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
209 views

BOQ MOT Format2

This document is a bill of quantities for the THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT project. It outlines the estimated costs for various items of work broken into parts including general requirements, earthworks and utilities, base layers, asphalt works, and structural works. The total estimated cost for all work is over $25 million USD with the largest estimated costs coming from structural excavation, reinforced concrete, and rebar.

Uploaded by

jethro chan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 35

BILL OF QUANTITIES

Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

Part 1 - General

10902 Supervision staff compound (temporary) L.S. 2,900,000.00 1.00 2,900,000.00

10903 Project Laboratory L.S. 500,000.00 1.00 500,000.00

10904 Computers and Survey Equipment L.S. 450,000.00 1.00 450,000.00

TOTAL AMOUNT (PART - 1) = 3,850,000.00

Part 2 - Earthworks and Utilities

20101 Clearing and Grubbing m² 20 0.00 0.00

20301 Roadway Excavation m³ 18 5,060.00 84,790.00 89,850.00 1,617,300.00

20501 Embankment m³ 11 49,485.00 5,260.00 54,745.00 602,195.00

20601 Subgrade m³ 22 0.00 0.00

2090101 Structural Excavation (Bridge) m³ 25 16,688.00 495,507.00 512,195.00 12,804,875.00

2090102 Structural Excavation (Others) m³ 25 0.00 0.00

201101 Rem. & Relocation of Underground Utility, Water line 300mm. L.m. 700 0.00 0.00

201102 Rem. & Relocation of Underground Utility, Water line 200mm. L.m. 2,700 0.00 0.00

201103 Rem. & Relocation of Existing 13.8 Kva, 1-core, 300mm² L.m. 600 0.00 0.00

201104 Rem. & Relocation of Existing Telephone lines L.m. 350 0.00 0.00

TOTAL AMOUNT (PART - 2) = 15,024,370.00

483714060.xls 07/14/2020 Page1 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

Part 3 - Base Layers

3030102 Aggregate Base Course m³ 45 0.00 0.00

TOTAL AMOUNT (PART - 3) = 0.00

Part 4 - Asphalt Works

4020102 Bituminous Prime Coat m² 1.50 0.00 0.00

4050113 Bit. Base Course with Polymer Modified PG 76-10 m³ 190 0.00 0.00

4050313 Bit. Wearing Course with Polymer Modified PG 76-10 m³ 230 0.00 0.00

TOTAL AMOUNT (PART - 4) = 0.00

Part 5 - Structural Works

50201 R.S.B. Grade 60 Tons 3,320 5,690.00 23,003.00 28,693.00 95,260,760.00

5030107 Reinf. Conc. 360/20 for Bridge Deck (Top Slab) m³ 680 383.00 20,842.00 21,225.00 14,433,000.00

5030205a Reinf. Conc. 270/20 for Foundation (Base Slab) m³ 650 3,015.00 86,165.00 89,180.00 57,967,000.00

5030205b Reinf. Conc. 270/20 for Approach slab m³ 570 170.00 2,500.00 2,670.00 1,521,900.00

5030207 Reinf. Conc. 360/20, Piers pile cap, R.C. buffers, cross heads m³ 930 6,584.00 6,584.00 6,123,120.00

5030305 Reinforced Concrete270/20, for Box Culvert m³ 680 0.00 0.00

5030405 Reinforced Concrete270/20, for Ret. Wall m³ 800 53,989.00 53,989.00 43,191,200.00

483714060.xls 07/14/2020 Page2 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

50302010 Cyclopean Concrete m³ 360 0.00 0.00

50307 Reinforced Concrete270/20 for pier cladding m³ 2,000 0.00 0.00

5030809a Pot Bearing Fixed 1000 Tons No 22,000 0.00 0.00

5030809b Pot Bearing Fixed 1180 Tons No 24,000 6.00 6.00 144,000.00

5031003 Pot Bearing, Sliding Guided 400 Tons No 17,000 0.00 0.00

5031004 Pot Bearing, Sliding Guided 500 Tons No 21,000 0.00 0.00

5031005 Pot Bearing, Sliding Guided 600 Tons No 22,000 0.00 0.00

5031009a Pot Bearing, Sliding Guided 1000 Tons No 31,000 0.00 0.00

5031009b Pot Bearing, Sliding Guided 1180 Tons No 36,000 25.00 25.00 900,000.00

5030901 Pot Bearing, Free Sliding 250 Tons No 8,000 0.00 0.00

5030902 Pot Bearing, Free Sliding 300 Tons No 10,000 0.00 0.00

5030904 Pot Bearing, Free Sliding 500 Tons No 16,000 0.00 0.00

5030905 Pot Bearing, Free Sliding 600 Tons No 17,000 0.00 0.00

5030906 Pot Bearing, Free Sliding 700 Tons No 17,000 19.00 19.00 323,000.00

5031101a Longitudinal Buffers Bearing 25 Tons No 700 0.00 0.00

5031101b Transversal Buffers Bearing 50 Tons No 750 0.00 0.00

5031106a Elastomeric Bearing (Non-Sliding) 225 Tons No 2,800 96.00 96.00 268,800.00

483714060.xls 07/14/2020 Page3 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

5031106b Elastomeric Bearing (Sliding) 225 Tons No. 4,100 0.00 0.00

5031402 Expansion Joints (50 mm range) L.m. 1,800 272.00 272.00 489,600.00

5031403 Expansion Joints (100 mm range) L.m. 3,500 106.00 106.00 371,000.00

50401 Prestressing steel Tons 15,000 718.00 718.00 10,770,000.00

50402a Precast Concrete slab, 360/20 m³ 980 0.00 0.00

50402b Precast Prestressed Conrete 400/20 (GIRDERS) m³ 1,200 978.00 978.00 1,173,600.00

50403 Cast in place Prestressed Conrete 360/20, Box Girder m³ 850 13,286.00 13,286.00 11,293,100.00

5050306a Steel Bridge railing (wadi hanifa) L.m. 600 0.00 0.00

5050306b Steel Bridge railing L.m. 400 0.00 0.00

5060103 Concrete Piles 1.0m. F L.m. 1,500 5,568.00 5,568.00 8,352,000.00

5060104 Concrete Piles 1.2m. F for Interchanges & Wadi Bridges L.m. 1,700 0.00 0.00

506010401 Concrete Piles 1.2m. F for Mahadiyah only L.m. 1,700 0.00 0.00

5061901a Working Pile Load Test No. 420,000 1.00 1.00 420,000.00

5061901b Pile Load Test No. 450,000 1.00 1.00 450,000.00

5061904 Pile Integrity Testing (Sonic tests) No. 200 0.00 0.00

51001a Bridge Parapets, concrete 360/20 L.m. 320 0.00 0.00

51001b Bridge Parapets L.m. 340 4,710.00 4,590.00 9,300.00 3,162,000.00

483714060.xls 07/14/2020 Page4 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS TUNNEL QUANTITY AMOUNT REMARKS
BRIDGE

51101 Heavy Duty Gulley Grates & Frames No. 2,000 0.00 0.00

51102 Permeable Backing m² 60 0.00 0.00

51103a Granular Backfill (behind backwall & wing wall) m³ 40 157,807.00 157,807.00 6,312,280.00

51103b Loose Granular Backfill above Wadi Mahadiyah Bridge Foundation m³ 30 0.00 0.00

51104a Bridge Deck drainage System F150 mm L.m. 160 0.00 0.00

51104b Bridge Deck drainage System F75 mm. L.m. 100 0.00 0.00

51105 High Density Styrofoam m³ 580 0.00 0.00

5120101a Water Proofing Membrane (Foundation & Deck Slab) m² 30 27,076.00 151,650.00 178,726.00 5,361,780.00

5120101b Water Proofing Membrane for Pumping Station m² 60 0.00 0.00

5120101c Bituminous paint 2-layers for buried surface m² 8 0.00 0.00

TOTAL AMOUNT (PART - 5) = 268,288,140.00

Part 6 - Incidental Works

6011401 Single face New Jersey Barrier L.m. 300 0.00 0.00

6011403 Single face New Jersey Barrier protection L.m. 400 0.00 0.00

60121 Steel Safety Railing (pedestrian fence) L.m. 150 0.00 0.00

60201 Precast Curb Stone L.m. 45 0.00 0.00

483714060.xls 07/14/2020 Page5 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

6020101 Precast Edge Curb L.m. 40 0.00 0.00

6030204 Manhole Type `A' (upto 3.50m.) No 7,500 0.00 0.00

6030205 Manhole Type `B' (3.50 to 7.0m.) No 15,000 0.00 0.00

6030206 Manhole Type `C' (above 7.0m.) No 25,000 0.00 0.00

60303 Inlet No 2,000 0.00 0.00

6030501 Adjustment of elevation of M.H. cover & drainage grate No 1,000 0.00 0.00

60513 uPVC pipe F300mm. L.m. 300 0.00 0.00

60525 Reinf. Concrete pipe F300mm. L.m. 400 0.00 0.00

60526 Reinf. Concrete pipe F400mm. L.m. 550 0.00 0.00

60527 Reinf. Concrete pipe F500mm. L.m. 700 0.00 0.00

60528 Reinf. Concrete pipe F600mm. L.m. 800 0.00 0.00

60530 Reinf. Concrete pipe F900mm. L.m. 1,400 0.00 0.00

60531 Reinf. Concrete pipe F1000mm. L.m. 1,500 0.00 0.00

60532 Reinf. Concrete pipe F1200mm. L.m. 1,900 0.00 0.00

6053301 Reinf. Concrete pipe F700mm. L.m. 900 0.00 0.00

6053302 Reinf. Concrete pipe F800mm. L.m. 1,000 0.00 0.00

6053303 Reinf. Concrete pipe F1100mm. L.m. 1,700 0.00 0.00

483714060.xls 07/14/2020 Page6 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

6060205 Grouted stone RIPRAP m³ 150 0.00 0.00

6060206a RIPRAP TYPE C, (D50=0.30m.) m³ 70 0.00 0.00

6060206b LOOSE RIPRAP TYPE C, (D50=0.60m.) m³ 70 0.00 0.00

60605 R.C. slope protection m² 90 0.00 0.00

6070101 Concrete Ditch Lining ( wire mesh) m² 100 0.00 0.00

6070102 Grouted Stone Ditch Lining m² 150 0.00 0.00

6070301 Concrete Embankment Slope drain (chute) L.m. 700 0.00 0.00

60806 Reinf. Concrete pipe culvert (precast) F1000mm. L.m. 800 0.00 0.00

61003 Diversion Dike m³ 25 0.00 0.00

61202 Concrete Tiles m² 48 0.00 0.00

61420 Reinforced Shot crete 60mm. Depth m² 70 0.00 0.00

6200101 Split Spoon sampling, 0-20m. Length L.m. 250 0.00 0.00

6200102 Split Spoon sampling, 20-40m. Length L.m. 300 0.00 0.00

62003 Rock core drilling, NX cores 53mm. Dia. Double barrel L.m. 450 0.00 0.00

TOTAL AMOUNT (PART - 6) = 0.00

483714060.xls 07/14/2020 Page7 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

Part 7 - Electrical Works

70401 13.8 kva Intake Switching station incl. all accessories No. 750,000 0.00 0.00

70501 13,800/400 V (100) kVA Electrical Sub-station No. 110,000 0.00 0.00

70503 13,800/400 V (200) kVA Electrical Sub-station No. 120,000 0.00 0.00

70602 13.8 MV Cable Single Armored 3x(1x95)mm2, PVC/XLPE L.m. 150 0.00 0.00

70807 Distrubution panel No. 45,000 0.00 0.00

70703 Low Voltage Cable 4x16mm2 pvc/pvc L.m. 25 0.00 0.00

70704 Low Voltage Cable 4x25mm2 pvc/pvc L.m. 30 0.00 0.00

70707 Low Voltage Cable 1x6mm2 pvc/pvc L.m. 5 0.00 0.00

70708 Low Voltage Cable 3x10mm2 pvc/pvc L.m. 15 0.00 0.00

70709a L. V. Cable 4x10mm2 High temperature rubber insulated L.m. 60 0.00 0.00

70709b L. V. Cable 1x6mm2 High temperature rubber insulated L.m. 30 0.00 0.00

70710 Low Voltage Cable 3x6mm2 pvc/pvc L.m. 10 0.00 0.00

70712 Low Voltage Cable 1x16mm2 pvc/pvc L.m. 8 0.00 0.00

70713 Low Voltage Cable 3x16mm2 pvc/pvc L.m. 20 0.00 0.00

70913 30m. Highmast carrying 4 luminaires No. 52,000 0.00 0.00

70914 35m. Highmast carrying 4 luminaires No. 56,000 0.00 0.00

483714060.xls 07/14/2020 Page8 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

70916 31m. Highmast carrying 4 luminaires No. 51,000 0.00 0.00

70917 32m. Highmast carrying 4 luminaires No. 52,000 0.00 0.00

70918 33m. Highmast carrying 4 luminaires No. 53,000 0.00 0.00

70919 34m. Highmast carrying 4 luminaires No. 54,000 0.00 0.00

70920 30-35 m. Highmast Relocation No. 15,000 0.00 0.00

71006 14m. Lighting columns, Double Arm No. 3,000 0.00 0.00

71009 14m. Lighting columns, Single Arm No. 3,000 0.00 0.00

71103 Street lighting luminaires,IP 54, 400W No. 1,000 0.00 0.00

71104 Street lighting luminaires,IP 54, 1000W No. 2,000 0.00 0.00

71105 Street lighting luminaires,IP 54, 600W No. 1,000 0.00 0.00

71302 Gantry Sign Lighting Luminaires,IP 54, 1x250w Metal Halide SET 12,000 0.00 0.00

71402 Underbridge Lighting IP 54, 150W HPS No. 1,100 0.00 0.00

71503 Underbridge Lighting IP 65, daytime, 1x250W HPS No. 1,400 0.00 0.00

71506 Underbridge Lighting IP 65, daytime, 2x400W HPS No. 2,500 0.00 0.00

71601 Earthing for Highmast No. 300 0.00 0.00

71602 Earthing for Sub-Station No. 300 0.00 0.00

71604 Earthing for Columns & Amenity Lighting No. 300 0.00 0.00

483714060.xls 07/14/2020 Page9 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

71605 Earthing for Gantry Sign No. 300 0.00 0.00

71606 Earthing for Cantilever Sign No. 300 0.00 0.00

71903 Upvc duct 1x100 mm.F L.m. 28 0.00 0.00

71904 Upvc duct 1x150 mm.F L.m. 40 0.00 0.00

71909 Upvc duct 3x150 mm.F L.m. 160 0.00 0.00

71915 Drawpit D-18 (900x900mm) No. 2,500 0.00 0.00

71916 Drawpit D-4 (900x1800mm) No. 6,200 0.00 0.00

71928 Drawpit (250x400mm) No. 500 0.00 0.00

71949 Lighting Column Foundation (14 m.) No. 2,600 0.00 0.00

71954 Highmast Foundation (30/35 m.) No. 12,000 0.00 0.00

71956 Steel template for 14m. Lighting Column No. 1,000 0.00 0.00

71964 Break-away support coupling assembly for 14m. L.C. No. 13,000 0.00 0.00

71990 Sub-Station Foundation No. 2,500 0.00 0.00

72001 Signal Controller 4-phase No. 70,000 0.00 0.00

72005 Signal Controller 3-phase No. 70,000 0.00 0.00

72010 Traffic Signal Head, 3x100, Type D No. 1,600 0.00 0.00

72012 Traffic Signal Head, 3x100, Type B No. 6,000 0.00 0.00

483714060.xls 07/14/2020 Page10 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS TUNNEL QUANTITY AMOUNT REMARKS
BRIDGE

72013 Traffic Signal Head, 3x100, Type A No. 5,000 0.00 0.00

72014 Traffic Signal Head, 1x210, Type M No. 2,000 0.00 0.00

72015 Traffic Signal Head, 2x210, Type E No. 2,200 0.00 0.00

72024 Pedestrian Traffic Signal Push Button No. 1,100 0.00 0.00

72025 Traffic Signal Support, cantilever No. 6,500 0.00 0.00

72027 Traffic Signal Support, Short bracket No. 2,100 0.00 0.00

72029 Traffic sensor No. 250 0.00 0.00

72030 Microwave vehicle motion Detector camera No. 9,000 0.00 0.00

TOTAL AMOUNT (PART - 7) = 0.00

Part 8 - landscaping & Irrigation

8-228 Irrigation pipe F150mm. L.m. 300 0.00 0.00

8-227 Irrigation pipe F100mm. L.m. 260 0.00 0.00

8-225 Irrigation pipe F50mm. L.m. 200 0.00 0.00

0.00

TOTAL AMOUNT (PART - 8) = 0.00

483714060.xls 07/14/2020 Page11 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH


RAMPS WITH TOTAL EST.
NO. DESCR IPTION UNIT COST OVERPASS TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

Part 9 - Road Signs & Markings

9030301 White Paint Ordinary m² 16 0.00

9030302 Yellow Paint Ordinary m² 16 0.00

90304 Special Paints m² 20 0.00

9030701 Road Studs Type `A' No 20 0.00

90308 Ceramics Road Studs No 7 0.00

9050101 Aluminum Sheets for Road Signs m² 550 0.00

9050201 Aluminum Sheets for Gantry Signs m² 550 0.00

9050302 Breakaway Sign Posts, Double (IPE) Kgs 20 0.00

9050303 Breakaway Sign Posts, Triple (IPE) Kgs 22 0.00

90504 Breakaway Sign Posts, Single No 400 0.00

9050501 Cantilever signs Tons 22,000 0.00

9050502 Gantry Signs Tons 21,000 0.00

TOTAL AMOUNT (PART - 9) = 0.00

483714060.xls 07/14/2020 Page12 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH RAMPS WITH TOTAL EST.


NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

Part 10 - NEW ITEMS


1 Thrust Bore (Rock Excavation) m3 0.00 15,600.00

2 Excavation Ancillaries ( Disposal of Excavated Materials ) m3 17,820.00 449,800.00

3 Trimming and Preparation of Excavated Surfaces m2 17,517.00 114,312.00

4 Filling Ancillaries (Trimming and Preparation of filled surfaces) m2 18,261.00 23,526.00

5 GeoTextile membrane m2 0.00 26,219.00

6 Blinding concrete m3 817.00 6,052.00

7 Formworks for Tunnel m2 0.00 89,961.00

8 Formworks for Overpass Bridge m2 55,120.00 -

9 Access Opening Under Bridge Deck Nos. 60.00 -

10 Construction joints to Tunnel L.m. 0.00 7,160.00

11 Expansion joints to Tunnel L.m. 0.00 5,358.00

12 Water Stop and External Water Bars L.m. 210.00 12,518.00

13 Finishing of Top surfaces m2 17,638.00 13,200.00

14 Finishing of Formed surfaces m2 35,237.00 49,610.00

15 Epoxy Paint to Structures Exposed surfaces m2 33,051.00 49,610.00

16 Metal works for stairways & landing Nos. 0.00 26.00

17 Metal works for Ladders Nos. 0.00 26.00

TOTAL AMOUNT (NEW ITEMS) = 0.00

483714060.xls 07/14/2020 Page13 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client : MINISTRY OF TRANSPORT
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT RAMPS WITH


RAMPS WITH TOTAL EST.
NO. DESCR IPTION UNIT COST OVERPASS
TUNNEL QUANTITY
AMOUNT REMARKS
BRIDGE

TOTAL AMOUNT (PART - 1) = 3,850,000.00

TOTAL AMOUNT (PART - 2) = 15,024,370.00

TOTAL AMOUNT (PART - 3) = 0.00

TOTAL AMOUNT (PART - 4) = 0.00

TOTAL AMOUNT (PART - 5) = 268,288,140.00

TOTAL AMOUNT (PART - 6) = 0.00

TOTAL AMOUNT (PART - 7) = 0.00

TOTAL AMOUNT (PART - 8) = 0.00

TOTAL AMOUNT (PART - 9) = 0.00

GRAND TOTAL AMOUNT = 287,162,510.00

LESS TOTAL AMOUNT = 287,162,510.00

TOTAL AMOUNT (NEW ITEMS) = 0.00

NET TOTAL AMOUNT = 287,162,510.00

483714060.xls 07/14/2020 Page14 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

Part 1 - General

10902 Supervision staff compound (temporary) L.S. 2,900,000.00 1 90% 10% 100% 2,900,000.000

10903 Project Laboratory L.S. 500,000.00 1 90% 10% 100% 500,000.000

10904 Computers and Survey Equipment L.S. 450,000.00 1 90% 10% 100% 450,000.000

TOTAL AMOUNT (PART - 1) = 3,850,000.000

Part 2 - Earthworks and Utilities

20101 Clearing and Grubbing m² 20 245,685.00 245,680.000 -39,219.212 206,460.788 4,129,215.760

20301 Roadway Excavation m³ 18 2,649,390.00 2,649,390.000 270,299.905 2,919,689.905 52,554,418.290 O.R. = 2,919,594.198 m³

20501 Embankment m³ 11 5,448,540.00 5,176,113.000 493,201.085 5,669,314.085 62,362,454.935 O.R. = 5,669,314.085 m³

20601 Subgrade m³ 22 280,290.00 139,258.000 111,698.647 250,956.647 5,521,046.234

2090101 Structural Excavation (Bridge) m³ 25 189,100.00 179,645.000 -21,955.774 157,689.226 3,942,230.650

2090102 Structural Excavation (Others) m³ 25 56,183.00 56,183.000 3,944.650 60,127.650 1,503,191.250 O.R. = 60,127.65 m³

201101 Rem. & Relocation of Underground Utility, Water line 300mm. L.m. 700 0.00 - - 0 -

201102 Rem. & Relocation of Underground Utility, Water line 200mm. L.m. 2,700 0.00 - - 0 -

201103 Rem. & Relocation of Existing 13.8 Kva, 1-core, 300mm² L.m. 600 8,903.00 2,489.240 7,020.524 9,509.764 5,705,858.400 O.R. = 9,509.764 L.m.

201104 Rem. & Relocation of Existing Telephone lines L.m. 350 180.00 175.700 - 175.700 61,495.000

TOTAL AMOUNT (PART - 2) = 135,779,910.519

483714060.xls 07/14/2020 Page1 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

Part 3 - Base Layers

3030102 Aggregate Base Course m³ 45 167,930.00 79,378.000 66,162.489 145,540.489 6,549,322.01

TOTAL AMOUNT (PART - 3) = 6,549,322.005

Part 4 - Asphalt Works

4020102 Bituminous Prime Coat m² 1.50 844,440.04 392,737.00 450,988.17 843,725.165 1,265,587.748

4050113 Bit. Base Course with Polymer Modified PG 76-10 m³ 190 60,425.00 29,359.00 31,216.97 60,575.973 11,509,434.870 O.R. = 60,575.973 m³

4050313 Bit. Wearing Course with Polymer Modified PG 76-10 m³ 230 50,110.00 6,720.00 46,709.07 53,429.066 12,288,685.180 O.R. = 53,429.066 m³

TOTAL AMOUNT (PART - 4) = 25,063,707.798

Part 5 - Structural Works

50201 R.S.B. Grade 60 Tons 3,320 49,365.00 48,643.000 726.375 49,369.375 163,906,325.000 O.R. = 49,369.375 Tons

5030107 Struct'l. Conc. 360/20 for Bridge Superstructure (DECK) m³ 680 21,012.00 18,433.000 2,598.193 21,031.193 14,301,211.240 O.R. = 21,031.1933 m³

5030205a Reinf. Conc. 270/20 for Abutment and Foundation m³ 650 8,486.00 8,486.000 462.883 8,948.883 5,816,773.950 O.R. = 8,948.883 m³

5030205b Reinf. Conc. 270/20 for Approach slab, Sidewalk m³ 570 2,465.00 1,785.000 656.712 2,441.712 1,391,775.840

5030207 Reinf. Conc. 360/20, Piers pile cap, R.C. buffers, cross heads m³ 930 152,762.00 152,500.000 865.399 153,365.399 142,629,821.070 O.R. = 153,365.399 m³

5030305 Reinforced Concrete270/20, for Box Culvert m³ 680 17,802.00 17,446.000 -35.857 17,410.143 11,838,897.240

5030405 Reinforced Concrete270/20, for Ret. Wall m³ 800 821.00 396.000 743.510 1,139.510 911,608.000 O.R. = 1,139.510 m³

483714060.xls 07/14/2020 Page2 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

50302010 Cyclopean Concrete m³ 360 1,346.00 1,345.000 32.536 1,377.536 495,912.960 O.R. = 1377.536 m³

50307 Reinforced Concrete270/20 for pier cladding m³ 2,000 245.00 245.000 18.476 263.476 526,952.000 O.R. = 263.476 m³

5030809a Pot Bearing Fixed 1000 Tons No 22,000 6 6 - 6 132,000.000

5030809b Pot Bearing Fixed 1180 Tons No 24,000 6 6 - 6 144,000.000

5031003 Pot Bearing, Sliding Guided 400 Tons No 17,000 4 4 - 4 68,000.000

5031004 Pot Bearing, Sliding Guided 500 Tons No 21,000 10 10 - 10 210,000.000

5031005 Pot Bearing, Sliding Guided 600 Tons No 22,000 12 12 - 12 264,000.000

5031009a Pot Bearing, Sliding Guided 1000 Tons No 31,000 28 28 - 28 868,000.000

5031009b Pot Bearing, Sliding Guided 1180 Tons No 36,000 16 16 - 16 576,000.000

5030901 Pot Bearing, Free Sliding 250 Tons No 8,000 3 3 - 3 24,000.000

5030902 Pot Bearing, Free Sliding 300 Tons No 10,000 6 6 - 6 60,000.000

5030904 Pot Bearing, Free Sliding 500 Tons No 16,000 48 48 - 48 768,000.000

5030905 Pot Bearing, Free Sliding 600 Tons No 17,000 36 36 - 36 612,000.000

5030906 Pot Bearing, Free Sliding 700 Tons No 17,000 10 10 - 10 170,000.000

5031101a Longitudinal Buffers Bearing 25 Tons No 700 1,387 1,387 - 1,387 970,900.000

5031101b Transversal Buffers Bearing 50 Tons No 750 804 804 - 804 603,000.000

5031106a Elastomeric Bearing (Non-Sliding) 225 Tons No 2,800 1,182 1,182 - 1,182 3,309,600.000

483714060.xls 07/14/2020 Page3 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

5031106b Elastomeric Bearing (Sliding) 225 Tons No. 4,100 296 296 - 296 1,213,600.000

5031402 Expansion Joints (50 mm range) L.m. 1,800 1,020.00 - 1,004.788 1,004.788 1,808,618.400

5031403 Expansion Joints (100 mm range) L.m. 3,500 772.00 - 771.777 771.777 2,701,219.500

50401 Prestressing steel Tons 15,000 2,802.00 2,778.00 22.018 2,800.018 42,000,270.000

50402a Precast Concrete slab, 360/20 m³ 980 1,440.00 1,377.00 62.605 1,439.605 1,410,812.900

50402b Precast Prestressed Conrete 400/20 (GIRDERS) m³ 1,200 38,491.00 38,376.00 -174.19 38,201.814 45,842,176.800

50403 Cast in place Prestressed Conrete 360/20, voided slab m³ 850 26,419.00 26,418.00 148.517 26,566.517 22,581,539.450 O.R. = 26,566.517 m³

5050306a Steel Bridge railing (wadi hanifa) L.m. 600 2,070.00 - 1,366.829 1,366.829 820,097.400

5050306b Steel Bridge railing L.m. 400 4,496.00 - 4,430.816 4,430.816 1,772,326.400

5060103 Concrete Piles 1.0m. F L.m. 1,500 874.00 874.00 -328.718 545.282 817,923.000

5060104 Concrete Piles 1.2m. F for Interchanges & Wadi Bridges L.m. 1,700 20,918.00 20,918.00 -331.392 20,586.608 34,997,233.600

506010401 Concrete Piles 1.2m. F for Mahadiyah only L.m. 1,700 11,238.00 11,237.80 - 11,237.800 19,104,260.000

5061901a Working Pile Load Test No. 420,000 0 - - 0 -

5061901b Pile Load Test No. 450,000 1 1.00 - 1 450,000.000

5061904 Pile Integrity Testing (Sonic tests) No. 200 1,879 1,879.00 10.000 1,889 377,800.000 O.R. = 1,889 Nos

51001a Bridge Parapets, concrete 360/20 L.m. 320 13,090 11,400.00 1,453.111 12,853.111 4,112,995.520

51001b Bridge Parapets L.m. 340 1,350.00 1,100.00 248.734 1,348.734 458,569.560

483714060.xls 07/14/2020 Page4 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

51101 Heavy Duty Gulley Grates & Frames No. 2,000 106 - 106 106 212,000.000

51102 Permeable Backing m² 60 2,942.00 2,795.00 35.082 2,830.082 169,804.920

51103a Granular Backfill (behind backwall & wing wall) m³ 40 7,714.00 7,714.00 87.057 7,801.057 312,042.280 O.R. = 7,801.057 m²

51103b Loose Granular Backfill above Wadi Mahadiyah Bridge Foundat m³ 30 35,912.00 35,912.00 279.550 36,191.550 1,085,746.500 O.R. = 36,191.550 m³

51104a Bridge Deck drainage System F150 mm L.m. 160 5,100.00 - - 0 -

51104b Bridge Deck drainage System F75 mm. L.m. 100 573.00 - - 0 -

51105 High Density Styrofoam m³ 580 6,367.00 5,914.00 -23.414 5,890.586 3,416,539.880

5120101a Water Proofing Membrane (Foundation & Deck Slab) m² 30 134,790.00 63,564.00 65,479.53 129,043.526 3,871,305.780

5120101b Water Proofing Membrane for Pumping Station m² 60 0.00 - - 0 -

5120101c Bituminous paint 2-layers for buried surface m² 8 70,807.00 52,357.00 25,894.86 78,251.863 626,014.904 O.R. = 78,251.863 m²

TOTAL AMOUNT (PART - 5) = 540,761,674.094

Part 6 - Incidental Works

6011401 Single face New Jersey Barrier L.m. 300 39,847 32,538.00 9,517.842 42,055.842 12,616,752.600 O.R. = 42,055.842 L.m.

6011403 Single face New Jersey Barrier protection L.m. 400 270 - 510.260 510.260 204,104.000 O.R. = 510.26 L.m.

60121 Steel Safety Railing (pedestrian fence) L.m. 150 4,450 - 3,608.916 3,608.916 541,337.400

60201 Precast Curb Stone L.m. 45 49,180 17,162.00 38,823.107 55,985.107 2,519,329.815 O.R. = 55,985.107 L.m.

483714060.xls 07/14/2020 Page5 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

6020101 Precast Edge Curb L.m. 40 25,294 14,241.00 24,209.222 38,450.222 1,538,008.880 O.R. = 38,450.222 L.m.

6030204 Manhole Type `A' (upto 3.50m.) No 7,500 402 330 74 404 3,030,000.000 O.R. = 404 Nos

6030205 Manhole Type `B' (3.50 to 7.0m.) No 15,000 59 38 20 58 870,000.000

6030206 Manhole Type `C' (above 7.0m.) No 25,000 9 8 - 8 200,000.000

60303 Inlet No 2,000 726 380 409 789 1,578,000.000 O.R. = 789 Nos

6030501 Adjustment of elevation of M.H. cover & drainage grate No 1,000 10 0 - 0 -

60513 uPVC pipe F300mm. L.m. 300 4,530 3,086.00 5,410.984 8,496.984 2,549,095.200 O.R. = 8,496.984 L.m.

60525 Reinf. Concrete pipe F300mm. L.m. 400 5,325 1,936.00 -417 1,519.188 607,675.200

60526 Reinf. Concrete pipe F400mm. L.m. 550 5,286 4,735.00 477.918 5,212.918 2,867,104.900

60527 Reinf. Concrete pipe F500mm. L.m. 700 5,435 4,960.00 452.000 5,412.000 3,788,400.000

60528 Reinf. Concrete pipe F600mm. L.m. 800 3,903 3,435.00 904.510 4,339.510 3,471,608.000 O.R. = 4,339.510 L.m.

60530 Reinf. Concrete pipe F900mm. L.m. 1,400 384 364.00 55.582 419.582 587,414.800 O.R. = 419.582 L.m.

60531 Reinf. Concrete pipe F1000mm. L.m. 1,500 2,983 1,928.00 1,097.635 3,025.635 4,538,452.500 O.R. = 3,025.635 L.m.

60532 Reinf. Concrete pipe F1200mm. L.m. 1,900 1,065 532.00 35.508 567.508 1,078,265.200

6053301 Reinf. Concrete pipe F700mm. L.m. 900 2,970.00 2,820.00 202.987 3,022.987 2,720,688.300 O.R. = 3,022.987 L.m.

6053302 Reinf. Concrete pipe F800mm. L.m. 1,000 2,191.00 1,604.00 315.000 1,919.000 1,919,000.000

6053303 Reinf. Concrete pipe F1100mm. L.m. 1,700 48.00 - 19.295 19.295 32,801.500

483714060.xls 07/14/2020 Page6 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

6060205 Grouted stone RIPRAP m³ 150 910.00 - 192.391 192.391 28,858.650

6060206a RIPRAP TYPE C, (D50=0.30m.) m³ 70 80.00 - - 0 0.000

6060206b LOOSE RIPRAP TYPE C, (D50=0.60m.) m³ 70 1,500.00 1,156.00 237.947 1,393.947 97,576.290

60605 R.C. slope protection m² 90 10,000.00 6,705.00 3,031.827 9,736.827 876,314.430

6070101 Concrete Ditch Lining ( wire mesh) m² 100 7,200.00 1,706.00 -1,706.000 0.000 0.000

6070102 Grouted Stone Ditch Lining m² 150 200.00 - - 0 -

6070301 Concrete Embankment Slope drain (chute) L.m. 700 380.00 - - 0 -

60806 Reinf. Concrete pipe culvert (precast) F1000mm. L.m. 800 170.00 36.53 97.938 134.468 107,574.400

61003 Diversion Dike m³ 25 150.00 - - 0.000 -

61202 Concrete Tiles m² 48 94,705.00 31,391.00 64,784.636 96,175.636 4,616,430.528 O.R. = 96,175.636 m²

61420 Reinforced Shot crete 60mm. Depth m² 70 1,000.00 - - 0 -

6200101 Split Spoon sampling, 0-20m. Length L.m. 250 0.00 0 - 0 -

6200102 Split Spoon sampling, 20-40m. Length L.m. 300 0.00 0 - 0 -

62003 Rock core drilling, NX cores 53mm. Dia. Double barrel L.m. 450 0.00 0 - 0 -

TOTAL AMOUNT (PART - 6) = 52,984,792.593

Part 7 - Electrical Works

70401 13.8 kva Intake Switching station incl. all accessories No. 750,000 1 - 1 1 750,000.000

483714060.xls 07/14/2020 Page7 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

70501 13,800/400 V (100) kVA Electrical Sub-station No. 110,000 6 3 3 6 660,000.000

70503 13,800/400 V (200) kVA Electrical Sub-station No. 120,000 8 7 1 8 960,000.000

70602 13.8 MV Cable Single Armored 3x(1x95)mm2, PVC/XLPE L.m. 150 12,280 2,039.00 10,439.817 12,478.817 1,871,822.550 O.R. = 12,478.817 L.m.

70807 Distrubution panel No. 45,000 5 4 3 7 315,000.000 O.R. = 7 Nos

70703 Low Voltage Cable 4x16mm2 pvc/pvc L.m. 25 11,600 4,650.00 10,698.533 15,348.533 383,713.325 O.R. = 15,348.533 L.m.

70704 Low Voltage Cable 4x25mm2 pvc/pvc L.m. 30 30,070 12,879 18,711.464 31,590.464 947,713.920 O.R. = 31,590.464 L.m.

70707 Low Voltage Cable 1x6mm2 pvc/pvc L.m. 5 11,600 4,650.00 10,698.533 15,348.533 76,742.665 O.R. = 15,348.533 L.m.

70708 Low Voltage Cable 3x10mm2 pvc/pvc L.m. 15 8,000 4,827.00 512- 4,315.267 64,729.005

70709a L. V. Cable 4x10mm2 High temperature rubber insulated L.m. 60 2,200 1,483.00 405.749 1,888.749 113,324.940

70709b L. V. Cable 1x6mm2 High temperature rubber insulated L.m. 30 2,200 1,483.00 405.749 1,888.749 56,662.470

70710 Low Voltage Cable 3x6mm2 pvc/pvc L.m. 10 23,000 9,727 8,118.433 17,845.433 178,454.330

70712 Low Voltage Cable 1x16mm2 pvc/pvc L.m. 8 30,070 12,879 18,711.464 31,590.464 252,723.712 O.R. = 31,590.464 L.m.

70713 Low Voltage Cable 3x16mm2 pvc/pvc L.m. 20 2,150 - 2,340.693 2,340.693 46,813.860 O.R. = 2,340.693 L.m.

70913 30m. Highmast carrying 4 luminaires No. 52,000 124 91 24 115 5,980,000.000

70914 35m. Highmast carrying 4 luminaires No. 56,000 23 23 - 23 1,288,000.000

70916 31m. Highmast carrying 4 luminaires No. 51,000 7 6 1 7 357,000.000

70917 32m. Highmast carrying 4 luminaires No. 52,000 9 8 1 9 468,000.000

483714060.xls 07/14/2020 Page8 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

70918 33m. Highmast carrying 4 luminaires No. 53,000 15 14 1 15 795,000.000

70919 34m. Highmast carrying 4 luminaires No. 54,000 11 11 - 11 594,000.000

70920 30-35 m. Highmast Relocation No. 15,000 4 3 - 3 45,000.000

71006 14m. Lighting columns, Double Arm No. 3,000 29 2 16 18 54,000.000

71009 14m. Lighting columns, Single Arm No. 3,000 116 88 26 114 342,000.000

71103 Street lighting luminaires,IP 54, 400W No. 1,000 78 - 56 56 56,000.000

71104 Street lighting luminaires,IP 54, 1000W No. 2,000 756 580 140 720 1,440,000.000

71105 Street lighting luminaires,IP 54, 600W No. 1,000 96 61 33 94 94,000.000

71302 Gantry Sign Lighting Luminaires,IP 54, 1x250w Metal Halide SET 12,000 18 - 19 19 228,000.000

71402 Underbridge Lighting IP 54, 150W HPS No. 1,100 348 348 12 360 396,000.000 O.R. = 360 Nos

71503 Underbridge Lighting IP 65, daytime, 1x250W HPS No. 1,400 16 - - 0 -

71506 Underbridge Lighting IP 65, daytime, 2x400W HPS No. 2,500 204 204 12 216 540,000.000 O.R. = 216 Nos

71601 Earthing for Highmast No. 300 189 - 183 183 54,900.000

71602 Earthing for Sub-Station No. 300 14 - 14 14 4,200.000

71604 Earthing for Columns & Amenity Lighting No. 300 26 - 11 11 3,300.000

71605 Earthing for Gantry Sign No. 300 14 - 14 14 4,200.000

71606 Earthing for Cantilever Sign No. 300 4 - 5 5 1,500.000 O.R. = 5 Nos

483714060.xls 07/14/2020 Page9 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

71903 Upvc duct 1x100 mm.F L.m. 28 8,460.00 1,958.00 4,949.644 6,907.644 193,414.032

71904 Upvc duct 1x150 mm.F L.m. 40 35,350.00 17,651.00 15,541.759 33,192.759 1,327,710.360

71909 Upvc duct 3x150 mm.F L.m. 160 1,800.00 1,193.00 2,200.490 3,393.490 542,958.400 O.R. = 3,393.490 L.m.

71915 Drawpit D-18 (900x900mm) No. 2,500 342 89 271 360 900,000.000 O.R. = 360 Nos

71916 Drawpit D-4 (900x1800mm) No. 6,200 69 22 49 71 440,200.000 O.R. = 71 Nos

71928 Drawpit (250x400mm) No. 500 96 - 112 112 56,000.000 O.R. = 112 Nos

71949 Lighting Column Foundation (14 m.) No. 2,600 49 - 38 38 98,800.000

71954 Highmast Foundation (30/35 m.) No. 12,000 166 139 18 157 1,884,000.000

71956 Steel template for 14m. Lighting Column No. 1,000 96 94 - 94 94,000.000

71964 Break-away support coupling assembly for 14m. L.C. No. 13,000 0 - - 0 -

71990 Sub-Station Foundation No. 2,500 14 9 5 14 35,000.000

72001 Signal Controller 4-phase No. 70,000 6 - 5 5 350,000.000

72005 Signal Controller 3-phase No. 70,000 3 - 4 4 280,000.000 O.R. = 4 Nos

72010 Traffic Signal Head, 3x100, Type D No. 1,600 65 - 64 64 102,400.000

72012 Traffic Signal Head, 3x100, Type B No. 6,000 28 - 28 28 168,000.000

72013 Traffic Signal Head, 3x100, Type A No. 5,000 65 - 64 64 320,000.000

72014 Traffic Signal Head, 1x210, Type M No. 2,000 58 - 60 60 120,000.000 O.R. = 60 Nos

483714060.xls 07/14/2020 Page10 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

72015 Traffic Signal Head, 2x210, Type E No. 2,200 80 - 118 118 259,600.000 O.R. = 118 Nos

72024 Pedestrian Traffic Signal Push Button No. 1,100 79 - 80 80 88,000.000 O.R. = 80 Nos

72025 Traffic Signal Support, cantilever No. 6,500 28 - 28 28 182,000.000

72027 Traffic Signal Support, Short bracket No. 2,100 108 - 114 114 239,400.000 O.R. = 114 Nos

72029 Traffic sensor No. 250 72 - 64 64 16,000.000

72030 Microwave vehicle motion Detector camera No. 9,000 65 - 64 64 576,000.000

TOTAL AMOUNT (PART - 7) = 27,696,283.569

Part 8 - landscaping & Irrigation

8-228 Irrigation pipe F150mm. L.m. 300 550.00 - 182.051 182.051 54,615.300

8-227 Irrigation pipe F100mm. L.m. 260 150.00 150.00 999.583 1,149.583 298,891.580 O.R. = 1,149.5830 L.m.

8-225 Irrigation pipe F50mm. L.m. 200 50.00 - - 0 -

TOTAL AMOUNT (PART - 8) = 353,506.880

Part 9 - Road Signs & Markings

9030301 White Paint Ordinary m² 16 500 - 84.357 84.357 1,349.712

9030302 Yellow Paint Ordinary m² 16 500 - 83.855 83.855 1,341.680

483714060.xls 07/14/2020 Page11 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

90304 Special Paints m² 20 1,000 - 994.496 994.496 19,889.920

9030701 Road Studs Type `A' No 20 14,510 - 17,629 17,629 352,580.000 O.R. = 17,629 Nos

90308 Ceramics Road Studs No 7 0 - - 0 0.000

9050101 Aluminum Sheets for Road Signs m² 550 8.368 - 634.578 634.578 349,017.900 O.R. = 634.578 m²

9050201 Aluminum Sheets for Gantry Signs m² 550 0 - 1,016.100 1,016.100 558,855.000 O.R. = 1,016.10 m²

9050302 Breakaway Sign Posts, Double (IPE) Kgs 20 20,000 200.000 1,838.656 2,038.656 40,773.120

9050303 Breakaway Sign Posts, Triple (IPE) Kgs 22 10,000 72.000 15,456.399 15,528.399 341,624.778 O.R. = 15,528.399 Kgs

90504 Breakaway Sign Posts, Single No 400 365 - 300 300 120,000.000

9050501 Cantilever signs Tons 22,000 24 - 23.869 23.869 525,118.000

9050502 Gantry Signs Tons 21,000 135 - 135.496 135.496 2,845,416.000 O.R. = 135.496 Tons

TOTAL AMOUNT (PART - 9) = 5,155,966.110

Part 10 - NEW ITEMS

20102 Removal of Palm Trees No 109 514.00 514.000 - 514 56,026.000

201101a Relocation of F150mm. Waterline (Ductile pipe) L.m. 713 1,004.00 1,003.000 0.830 1,003.830 715,730.790

20214 Removal and Relocation of 12m. Lighting Column No 12,100 20 - - 0 0.000

20301a Special Rock excavation under Bridges m³ 66 120,200 116,594.000 -155.690 116,438.310 7,684,928.460

20301b Low charge blasting near Houses and Electrical Transmission Li m³ 40 1,408,200 1,282,198.000 116,553.000 1,398,751.000 55,950,040.000

483714060.xls 07/14/2020 Page12 of 35 FM:PJ-003. REV.0


FM:PJ:003
FINAL CERTIFICATE
NAME OF PROJECT : RIYADH RING ROAD NORTH-WEST LEG CLIENT : MINISTRY OF TRANSPORT
CONTRACTOR : SHIBH AL-JAZIRA CONTRACTING CO. LTD. CONSULTANT : DAR AL-HANDASAH (Shair & Partners)
Covering the month of : RAMADAN 1431H Certificate No. : FINAL CERTIFICATE
ITEM UNIT Revised ACCOMPLISHMENT
DESCR IPTION UNIT
BOQ
AMOUNT REMARKS
NO. COST LAST MONTH THIS MONTH TO DATE

20501a Borrow fill in Interchange-4 Ramps m³ 37 1,454,000.00 1,446,730.000 25,057.000 1,471,787.000 54,456,119.000 O.R. = 1,471,787.00 m³

51301a Painting of structures m² 20 46,619.45 - 41,176.663 41,176.663 823,533.260

80101 Supply and Spreading of Agricultural Soil m³ 95 28,000.00 - - 0 -

60604 Gabions m² 180 0.00 - - 0 -

TOTAL AMOUNT (NEW ITEMS) = 119,686,377.510

TOTAL AMOUNT (PART - 1) = 3,850,000.000


TOTAL AMOUNT (PART - 2) = 135,779,910.519
TOTAL AMOUNT (PART - 3) = 6,549,322.005
TOTAL AMOUNT (PART - 4) = 25,063,707.798
TOTAL AMOUNT (PART - 5) = 540,761,674.094
TOTAL AMOUNT (PART - 6) = 52,984,792.593
TOTAL AMOUNT (PART - 7) = 27,696,283.569
TOTAL AMOUNT (PART - 8) = 353,506.880
TOTAL AMOUNT (PART - 9) = 5,155,966.110
100.00% GRAND TOTAL AMOUNT = 798,195,163.568
DEDUCTIONS (2.983445%) 23,813,713.698
LESS TOTAL AMOUNT = 774,381,449.870
TOTAL AMOUNT (NEW ITEMS) = 119,686,377.510
NET TOTAL AMOUNT = 894,067,827.380
AS OF MC # 44 = -804,827,816.240
NET TOTAL AMOUNT THIS MONTH = 89,240,011.139

483714060.xls 07/14/2020 Page13 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client :
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT
NO. DESCR IPTION UNIT COST EST. QUANTITY AMOUNT (SAR.) REMARKS

Part 1 - General

10902 Supervision staff compound (temporary) L.S. 2,900,000.00 1 2,900,000.00

10903 Project Laboratory L.S. 500,000.00 1 500,000.00

10904 Computers and Survey Equipment L.S. 450,000.00 1 450,000.00

TOTAL AMOUNT (PART - 1) = 3,850,000.00

Part 2 - Earthworks and Utilities

20101 Clearing and Grubbing m² 1.00 1.00 1.00

20301 Roadway Excavation m³ 1.00 1.00 1.00

20501 Embankment m³ 1.00 1.00 1.00

20601 Subgrade m³ 1.00 1.00 1.00

2090101 Structural Excavation (Bridge) m³ 1.00 1.00 1.00

2090102 Structural Excavation (Other Structures) m³ 1.00 1.00 1.00

TOTAL AMOUNT (PART - 2) = 6.00

Part 3 - Base Layers

3030102 Aggregate Base Course m³ 1.00 1.00 1.00

TOTAL AMOUNT (PART - 3) = 1.00

483714060.xls 07/14/2020 Page1 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client :
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT
NO. DESCR IPTION UNIT COST EST. QUANTITY AMOUNT (SAR.) REMARKS

Part 4 - Asphalt Works

4020102 Bituminous Prime Coat m² 1.00 1.00 1.00

4050113 Bit. Base Course with Polymer Modified PG 76-10 m³ 1.00 1.00 1.00

4050313 Bit. Wearing Course with Polymer Modified PG 76-10 m³ 1.00 1.00 1.00

TOTAL AMOUNT (PART - 4) = 3.00

Part 5 - Structural Works

50201 R.S.B. Grade 60 Tons 1.00 1.00 1.00

5030107 Reinf. Conc. 360/20 for Superstructure m³ 1.00 1.00 1.00

5030205a Reinf. Conc. 270/20 for Substructure m³ 1.00 1.00 1.00

5030205b Reinf. Conc. 270/20 for Approach slab m³ 1.00 1.00 1.00

5030207 Reinf. Conc. 360/20, (Piers & Pile cap) m³ 1.00 1.00 1.00

50308 Pot Bearing Fixed No 1.00 1.00 1.00

50309 Pot Bearing, Free Sliding No 1.00 1.00 1.00

50310 Pot Bearing, Sliding Guided No 1.00 1.00 1.00

50311 Elastomeric Bearing No. 1.00 1.00 1.00

5031402 Expansion Joints (50-100 mm range) L.m. 1.00 1.00 1.00

483714060.xls 07/14/2020 Page2 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client :
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT
NO. DESCR IPTION UNIT COST EST. QUANTITY AMOUNT (SAR.) REMARKS

5031403 Expansion Joints (100-200 mm range) L.m. 1.00 1.00 1.00

50401 Prestressing steel Tons 1.00 1.00 1.00

50402 Precast Prestressed Conrete 400/20 (Girders) m³ 1.00 1.00 1.00

50403 Cast in place Prestressed Conrete 360/20, Box Girder m³ 1.00 1.00 1.00

5060103 Concrete Piles 1.0m. F L.m. 1.00 1.00 1.00

5061901a Working Pile Load Test No. 1.00 1.00 1.00

5061901b Pile Load Test No. 1.00 1.00 1.00

51001 Bridge Parapets L.m. 1.00 1.00 1.00

51101 Heavy Duty Gulley Grates & Frames No. 1.00 1.00 1.00

51103 Granular Backfill m³ 1.00 1.00 1.00

51104a Bridge Deck drainage System F150 mm L.m. 1.00 1.00 1.00

5120101a Water Proofing Membrane (Foundation & Deck Slab) m² 1.00 1.00 1.00

5120101b Water Proofing Membrane for Pumping Station m² 1.00 1.00 1.00

TOTAL AMOUNT (PART - 5) = 23.00

483714060.xls 07/14/2020 Page3 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client :
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT
NO. DESCR IPTION UNIT COST EST. QUANTITY AMOUNT (SAR.) REMARKS

Part 6 - Drainage Works

60201 Precast Curb Stone L.m. 1.00 1.00 1.00

6020101 Precast Edge Curb L.m. 1.00 1.00 1.00

6030204 Manhole Type `A' (upto 3.50m.) No 1.00 1.00 1.00

60303 Inlet No 1.00 1.00 1.00

60513 uPVC pipe F300mm. L.m. 1.00 1.00 1.00

60525 Reinf. Concrete pipe F300mm. L.m. 1.00 1.00 1.00

60526 Reinf. Concrete pipe F400mm. L.m. 1.00 1.00 1.00

60527 Reinf. Concrete pipe F500mm. L.m. 1.00 1.00 1.00

61202 Concrete Tiles m² 1.00 1.00 1.00

TOTAL AMOUNT (PART - 6) = 9.00

483714060.xls 07/14/2020 Page4 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client :
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT
NO. DESCR IPTION UNIT COST EST. QUANTITY AMOUNT (SAR.) REMARKS

Part 7 - Electrical Works

70503 13,800/400 V (200) kVA Electrical Sub-station No. 1.00 1.00 1.00

70807 Distrubution panel No. 1.00 1.00 1.00

70704 Low Voltage Cable 4x25mm2 pvc/pvc L.m. 1.00 1.00 1.00

71302 Gantry Sign Lighting Luminaires,IP 54, 1x250w Metal Halide SET 1.00 1.00 1.00

71602 Earthing for Sub-Station No. 1.00 1.00 1.00

71604 Earthing for Columns & Amenity Lighting No. 1.00 1.00 1.00

71605 Earthing for Gantry Sign No. 1.00 1.00 1.00

71606 Earthing for Cantilever Sign No. 1.00 1.00 1.00

71904 Upvc duct 1x150 mm.F L.m. 1.00 1.00 1.00

71949 Lighting Column Foundation No. 1.00 1.00 1.00

71990 Sub-Station Foundation No. 1.00 1.00 1.00

TOTAL AMOUNT (PART - 7) = 11.00

483714060.xls 07/14/2020 Page5 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client :
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT
NO. DESCR IPTION UNIT COST EST. QUANTITY AMOUNT (SAR.) REMARKS

Part 8 -Landscaping

- Soft Landscaping Works L.S. 1.00 1.00 1.00

- Irrigation Works L.S. 1.00 1.00 1.00

TOTAL AMOUNT (PART - 8) = 1.00

Part 9 - Road Signs & Markings

9030701 Road Studs Type `A' No 1.00 1.00 1.00

90308 Ceramics Road Studs No 1.00 1.00 1.00

9050101 Aluminum Sheets for Road Signs m² 1.00 1.00 1.00

9050201 Aluminum Sheets for Gantry Signs m² 1.00 1.00 1.00

9050302 Breakaway Sign Posts, Double (IPE) Kgs 1.00 1.00 1.00

90504 Breakaway Sign Posts, Single No 1.00 1.00 1.00

9050501 Cantilever signs Tons 1.00 1.00 1.00

9050502 Gantry Signs Tons 1.00 1.00 1.00

TOTAL AMOUNT (PART - 9) = 8.00

483714060.xls 07/14/2020 Page6 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client :
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT
NO. DESCR IPTION UNIT COST EST. QUANTITY AMOUNT (SAR.) REMARKS

Part 10 - Incidental Works


1 Thrust Bore (Rock Excavation) m3 1.00 1.00 1.00

2 MSE walls m2 1.00 1.00 1.00

3 Excavation Ancillaries ( Disposal of Excavated Materials ) m3 1.00 1.00 1.00

4 Trimming and Preparation of Excavated Surfaces m2 1.00 1.00 1.00

5 Filling Ancillaries (Trimming and Preparation of filled surfaces) m2 1.00 1.00 1.00

6 GeoTextile membrane m2 1.00 1.00 1.00

7 Blinding concrete m3 1.00 1.00 1.00

8 Formworks for Tunnel m2 1.00 1.00 1.00

9 Formworks for Overpass Bridge m2 1.00 1.00 1.00

10 Access Opening Under Bridge Deck Nos. 1.00 1.00 1.00

11 Construction joints to Tunnel L.m. 1.00 1.00 1.00

12 Expansion joints to Tunnel, 25mm L.m. 1.00 1.00 1.00

13 Water Stop and External Water Bars L.m. 1.00 1.00 1.00

14 Finishing of Top surfaces m2 1.00 1.00 1.00

15 Finishing of Formed surfaces m2 1.00 1.00 1.00

TOTAL AMOUNT (NEW ITEMS) = 15.00

483714060.xls 07/14/2020 Page7 of 35 FM:PJ-003. REV.0


BILL OF QUANTITIES
Project : THE AVENUES RIYADH - EXTERNAL ROAD IMPROVEMENT Client :
Contractor : SHIBH AL-JAZIRA CONTRACTING CO. LTD. Consultant :

ITEM UNIT
NO. DESCR IPTION UNIT COST EST. QUANTITY AMOUNT (SAR.) REMARKS

TOTAL AMOUNT (PART - 1) = 3,850,000.00

TOTAL AMOUNT (PART - 2) = 6.00

TOTAL AMOUNT (PART - 3) = 1.00

TOTAL AMOUNT (PART - 4) = 3.00

TOTAL AMOUNT (PART - 5) = 23.00

TOTAL AMOUNT (PART - 6) = 9.00

TOTAL AMOUNT (PART - 7) = 11.00

TOTAL AMOUNT (PART - 8b) = 1.00

TOTAL AMOUNT (PART - 9) = 8.00

TOTAL AMOUNT (PART - 10) = 15.00

GRAND TOTAL AMOUNT = 3,850,077.00