Project Management Tool

The dashboard shows the status of 12 tasks in a project, with 8 tasks in progress, 3 pending, and 1 completed. A Gantt chart displays the start and end dates of each task along with their status. Notes provide definitions and explanations of task statuses like completed, in progress, and pending, as well as the color coding used in the project status indicator.

Uploaded by

Krishna437
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views16 pages

Project Management Tool

The dashboard shows the status of 12 tasks in a project, with 8 tasks in progress, 3 pending, and 1 completed. A Gantt chart displays the start and end dates of each task along with their status. Notes provide definitions and explanations of task statuses like completed, in progress, and pending, as well as the color coding used in the project status indicator.

Uploaded by

Krishna437
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

Project Management

DASHBOARD

Gantt Chart
15
Task Master Project Status Total Task

Task not started even after


plan start date 20%
Task Inprogress even after
end date 27%
Monday, 11 May, 20

27% 53%

Completed Task Inprogress Task Pending Task

NOTE:
1. Completed Task means, the task which are completed within targted time lines
2. Inpprogress Task includes all task which are currently in process
3. Inprogress Task includes 1) the task is in process with in time line 2) the task in process even after end date
4. Pending Task means the task is not started even after plan start date or the start date of the task is yet to come
5. Project Status indicator color code interpretation:
5.1 - If all task is completed GREEN
5.2 - If all task is Inprogress YELLOW
5.3 - If any task is not started RED
after plan start date
day, 11 May, 2020

20%

Pending Task

ss even after end date


e of the task is yet to come
Gantt Chart
Completed

Dashboard

Task Start End Date Status


Date
Task 1 20/04/20 09/05/20 Completed
GANTT CHART
Task 2 20/04/20 09/05/20 Inprogress
Task 3 23/04/20 26/05/20 Inprogress
Task 4 27/04/20 15/05/20 Inprogress
Task Master
Task 5 29/04/20 07/05/20 Completed
Task 6 01/05/20 07/05/20 Inprogress
Task 7 01/05/20 16/05/20 Inprogress
Task 8 02/05/20 09/05/20 Inprogress
Task 9 02/05/20 06/05/20 Completed
Task 10 04/05/20 12/05/20 Inprogress
Task 11 04/05/20 07/05/20 Pending
Task 12 05/05/20 06/05/20 Completed
Completed 01/05 Inprogress Pending Sunday

02/05

03/05

04/05

05/05

06/05

07/05

08/05

09/05

10/05

11/05

12/05

13/05

14/05

15/05

16/05

17/05

18/05

19/05

20/05

21/05

22/05
Com. %

100% 100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10% 10%
100% 100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
100% 100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30% 30%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
100% 100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%
23/05

24/05

25/05

25/025/025/05
25/025/025/05
25/025/025/05
25/025/025/05
25/025/025/05
25/025/025/05
25/025/025/05
25/025/025/05
25/025/025/05
25/025/025/05
25/025/025/05
25/025/025/05
Task Master
S. No. Task Name of Site Task Owner
1 Task 1 pqrs Chirag
Dashboard
2 Task 2 xyz Gita
3 Task 3 pqrs Chhagan
4 Task 4 pqrs Abhay
Gantt Chart
5 Task 5 abc Vishal
6 Task 6 pqrs Shreya
7 Task 7 xyz Twinkle
TASK MASTER
8 Task 8 abc Chirag
9 Task 9 abc Nilesh
10 Task 10 pqrs Nilesh
11 Task 11 abc Chandresh
12 Task 12 abc Jayesh
13 Task 13 xyz Chhagan
14 Task 14 abc Neeta
15 Task 15 xyz Magan
G- Task in progress within ti
A- Task in progress after end
R- Task is not started at star
Assigned to 1 Assigned to 2 Assigned to 3 Assigned to 4 Start Date End Date Status
4/20/2020 5/9/2020 Completed
4/20/2020 5/9/2020 Inprogress
4/23/2020 5/26/2020 Inprogress
4/27/2020 5/15/2020 Inprogress
4/29/2020 5/7/2020 Completed
5/1/2020 5/7/2020 Inprogress
5/1/2020 5/16/2020 Inprogress
5/2/2020 5/9/2020 Inprogress
5/2/2020 5/6/2020 Completed
5/4/2020 5/12/2020 Inprogress
5/4/2020 5/7/2020 Pending
5/5/2020 5/6/2020 Completed
5/6/2020 5/7/2020 Inprogress
5/6/2020 5/31/2020 Pending
5/9/2020 6/15/2020 Pending
G- Task in progress within timeline
A- Task in progress after end date
R- Task is not started at start date
Completion % Task Status
100% G
10% A
75% A
10% A
100% G
50% A
50% A
50% A
100% G
30% A
0% R
100% G
30% A
0% R
0% R
Remarks
Task
Task 15 15 Blank Area
Pending 3 20% 80%
Inprogress 8 53% 47%
Completed 4 27% 73%

Project Status R
Task not started even after plan start d 3 20%
Task Inprogress even after end date 8 53%

53%

Today Date
Tuesday, 14 July, 2020
Day Holiday
Sun Y
Mon N
Tue N
Wed N
Thu N
Fri N
Sat N