1. Scope Of Work
To laying, patching, testing and termination of Fibre Optics Cable for Singtel Fibre Works.
2. Work Location
- MDF Room
- TELECOM Riser
- Server Room
5. Responsibility
- Technical Sales Manager
- Coordinator
- Controller
- Site Engineer
- Site Supervisor
- Technician
8. References
Risk Assessment ( RA )
9. Emergency Preparedness
1) Emergency Situation at MDF / Server Room
- To monitor closely of work done and ready for immediate response to any situation
arising.