Method of Statement (MOS) PDF

Q-Works Solutions Pte Ltd will lay, patch, test and terminate fibre optic cables for Singtel Fibre Works over approximately 2-3 hours. They will use equipment such as a fusion splicing machine, OTDR, and GPON meter to splice and test the installed fibre optic cables in the MDF room, telecom riser and server room. Safety procedures will be followed, such as using ladders safely and properly placing warning signs. Q-Works Solutions Pte Ltd management and technicians are responsible for the work.

Uploaded by

林诗倩
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
820 views

Method of Statement (MOS) PDF

Q-Works Solutions Pte Ltd will lay, patch, test and terminate fibre optic cables for Singtel Fibre Works over approximately 2-3 hours. They will use equipment such as a fusion splicing machine, OTDR, and GPON meter to splice and test the installed fibre optic cables in the MDF room, telecom riser and server room. Safety procedures will be followed, such as using ladders safely and properly placing warning signs. Q-Works Solutions Pte Ltd management and technicians are responsible for the work.

Uploaded by

林诗倩
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Q-Works Solutions Pte Ltd

UEN No: 201425945M GST Registration No: 201425945M


160 Paya Lebar Road, Orion Building #07-05 , Singapore 409022
Tel: +65 6969 6262 Fax: +65 6399 3699
Email: [email protected]

METHOD OF STATEMENT (MOS)

1. Scope Of Work
To laying, patching, testing and termination of Fibre Optics Cable for Singtel Fibre Works.

2. Work Location
- MDF Room
- TELECOM Riser
- Server Room

3. Duration and Time of Work


The work process will take approximately 2-3 hours depending on the actual site
condition.

4. Machinery, Equipment & Tools


- PPE Tools and Equipment
- General Box
- Platform A Ladder ( Max 8 Steps )
- Fusion Splicing Machine
- OTDR
- GPON Meter
- VLF Pen Light
- 4 Safety Cone

5. Responsibility
- Technical Sales Manager
- Coordinator
- Controller
- Site Engineer
- Site Supervisor
- Technician

6. Work Method Statement


- Placing of warning signs at designated work areas.
- Fibre optics cable pulling using existing cable tray with usage of ladders
- Removing of metal jacket from fibre optics cable using cutters.
- Stripping of fibre optics cable in preparation for splicing
- Splicing & termination/patching of fibre optics cable
- Testing of installed fibre optics cable
Q-Works Solutions Pte Ltd
UEN No: 201425945M GST Registration No: 201425945M
160 Paya Lebar Road, Orion Building #07-05 , Singapore 409022
Tel: +65 6969 6262 Fax: +65 6399 3699
Email: [email protected]

7. Safe Work Procedures


a) Placing of warning signs at designated work areas.
- Site/Safety supervisor to ensure that workers put on reflective safety belt and
support lorry to turn on hazard light. Site/Safety supervisor to ensure
correct/proper sign put up to avoid confusion.
b) Fibre optics cable pulling using existing cable tray with usage of ladder.
- Site supervisor to ensure workers follows buddy system and that ladder is in good
working condition.

c) Removing of metal jacket from fibre optics cable using cutter


- Site supervisor to ensure that cutter used is in good working condition/of standard
and not handmade.

d) Stripping of fibre optics cable in preparation for splicing


- Site supervisor to ensure that stripper used is in good working condition/of
standard and not handmade.
e) Splicing & termination/patching of fibre optics cable
- Site supervisor to ensure that splicing equipment is in good condition with sockets
in good condition with standard cables.
f) Testing of installed fibre optics cable
- Site supervisor to ensure that testing equipment is in good condition with sockets
in good condition with standard cables.

8. References
Risk Assessment ( RA )

9. Emergency Preparedness
1) Emergency Situation at MDF / Server Room
- To monitor closely of work done and ready for immediate response to any situation
arising.

• 1st Contact : Ms Mei ( +65 9882 5882 )


• 2nd Contact : Ms En Kee ( +65 9644 1202 )